← Back
Walk-up apt, over six families with stores
39-44 24 STREET
QUEENS · BIN 4004757
💬 Discuss this project
1920Year Built
4Stories
C7Building Class
M1-2/R5DZoning
21,680 sfGross Floor Area
31Units
Rent Stabilized84 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: 39-50 24TH STREET REALTY CORP. · 7,500 sf lot · 2.89 FAR built · Flood zone X
Locations of Work
ElectricalMechanicalPlumbing
Floor 13p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TITAN SERVICES USA507/08/2026
CITYVIEW CONSTRUCTION804/09/2026
39-50 24TH STREET REALTY CORP.303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/24/2015$5.6M—Private party → 39-50 24TH STREET REALTY CORP.$259/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IW ARCHITECTURE, PLLC201/12/2026
KHACHATURIAN ENGINEERING ASSOCIATES307/02/2025
CPA ARCHITECTURE106/17/2025
BANGASH ASSOCIATES INC.205/09/2025
ASR ENGINEERING PC103/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PDG BUILDING CONSULTANTS LLC LLC803/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
NEW YORK SIGN CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OPTIMUS CONSTRUCTION&DEV*General Contractor204/09/2026
TITAN SERVICES USA INCGeneral Contractor207/08/2026
GOING SIGN SVCNGScaffold207/08/2026
MKSSKR CONSULTING SERVICEGeneral Contractor107/08/2026
D.D.S. MECH PBG&HTG CORPPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524407/02/2025
BANGASH ASSOCIATES INC8488205/09/2025
Building Lifecycle
All (110)Filed (9)Permit Issued (8)Signed Off (6)Violation (60)Inspection (4)Special Inspection (23)
05/13/2026
Signed off — Alteration
Interior renovation of existing commercial space. No change in use, occupancy or egress
Q01230012-S1
05/06/2026
Violation issued (HPD, open)
A
05/06/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/23/2026
Signed off — Alteration
Interior renovation of existing commercial space. No change in use, occupancy or egress
Q01230012-I1
02/25/2026
Signed off — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01343625-I1
02/25/2026
Signed off — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01343623-I1
01/14/2026
Permit issued — Sign
Q01343623-I1-SG
01/14/2026
Permit issued — Sign
Q01343625-I1-SG
01/12/2026
Filed — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01343625-I1
01/12/2026
Filed — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01343623-I1
01/07/2026
Special inspection requirement — Final
Israel Wertentheil
01/07/2026
Special inspection requirement — Final
Israel Wertentheil
12/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/21/2025
Violation issued (HPD, closed)
I
10/31/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01187421-I1
10/24/2025
Violation issued (HPD, closed)
C
08/28/2025
Signed off — Alteration
Facade Repair including brick replacement, lintel replacement, parapet wall repair, mortar joint repointing and stucco repair as per drawings. No change in number of dwellings or egress of the building.
Q01220089-I1
07/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/09/2025
Permit issued — Plumbing
Q01230012-S2-PL
07/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
07/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
Shahrish Shuvo
07/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
07/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
07/07/2025
Special inspection requirement — Maintenance information
Shahrish Shuvo
07/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
07/02/2025
Filed — Alteration
Interior renovation of existing commercial space. No change in use, occupancy or egress
Q01230012-P1
06/27/2025
Permit issued — Mechanical Systems
Q01230012-S1-MS
06/27/2025
Permit issued — General Construction
Q01230012-I1-GC
06/18/2025
Filed — Alteration
Interior renovation of existing commercial space. No change in use, occupancy or egress
Q01230012-S1
06/18/2025
Filed — Alteration
Interior renovation of existing commercial space. No change in use, occupancy or egress
Q01230012-S2
06/17/2025
Filed — Alteration
Interior renovation of existing commercial space. No change in use, occupancy or egress
Q01230012-I1
06/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
06/11/2025
Special inspection requirement — Mechanical Systems
Shahrish Shuvo
06/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
Shahrish Shuvo
06/11/2025
Special inspection requirement — Final
Shahrish Shuvo
06/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
06/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
06/11/2025
Special inspection requirement — Maintenance information
Shahrish Shuvo
05/21/2025
Violation issued (HPD, closed)
B
05/21/2025
Violation issued (HPD, closed)
B
05/21/2025
Violation issued (HPD, closed)
B
05/15/2025
Permit issued — General Construction
Q01220089-I1-GC
05/09/2025
Filed — Alteration
Facade Repair including brick replacement, lintel replacement, parapet wall repair, mortar joint repointing and stucco repair as per drawings. No change in number of dwellings or egress of the building.
Q01220089-P1
05/09/2025
Special inspection requirement — Final
FAZAL BANGASH
05/09/2025
Special inspection requirement — Masonry
FAZAL BANGASH
05/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAZAL BANGASH
05/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
FAZAL BANGASH
05/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAZAL BANGASH
05/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
FAZAL BANGASH
05/08/2025
Special inspection requirement — Final
FAZAL BANGASH
05/08/2025
Special inspection requirement — Masonry
FAZAL BANGASH
05/02/2025
Filed — Alteration
Facade Repair including brick replacement, lintel replacement, parapet wall repair, mortar joint repointing and stucco repair as per drawings. No change in number of dwellings or egress of the building.
Q01220089-I1
04/11/2025
Violation issued (HPD, closed)
C
04/11/2025
Violation issued (HPD, closed)
C
04/11/2025
Violation issued (HPD, closed)
B
04/11/2025
Violation issued (HPD, closed)
C
04/11/2025
Violation issued (HPD, closed)
B
04/11/2025
Violation issued (HPD, closed)
B
04/11/2025
Violation issued (HPD, closed)
B
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offPOLSINELLI, HENRY01/14/2026
DOB NOWSignSigned-offPOLSINELLI, HENRY01/14/2026
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP07/09/2025
DOB NOWMechanical SystemsSigned-offOPTIMUS CONSTRUCTION&DEV*06/27/2025
DOB NOWGeneral ConstructionSigned-offOPTIMUS CONSTRUCTION&DEV*06/27/2025
DOB NOWGeneral ConstructionSigned-offMKSSKR CONSULTING SERVICE05/15/2025
DOB NOWSidewalk ShedSigned-offTITAN SERVICES USA INC03/05/2025
DOB NOWSidewalk ShedSigned-offTITAN SERVICES USA INC03/05/2025
BISPLISSUEDS & L PLUMBING INC05/24/2018
BISFPISSUEDNY FIRETECH INC05/25/2017
BISMHISSUEDKTC DESIGN GROUP INC04/17/2017
BISOTISSUEDKTC DESIGN GROUP INC04/17/2017
BISOTISSUEDGLOBAL GROUP INDUSTRIES C06/07/2016
BISPLISSUEDS & L PLUMBING INC03/04/2016
BISOTISSUEDGLOBAL GROUP INDUSTRIES C03/04/2016
BISBLISSUEDFRANK VERNI03/03/1999
1 project · most recent 07/02/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/02/2025Signed-offOPTIMUS CONSTRUCTION&DEV*Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PUY-A12NKA 12,000 BTU · Split System ×1
1 project · most recent 07/02/2025
Water/Sanitary
FiledStatusContractorScope
07/02/2025Signed-offD.D.S. MECH PBG&HTG CORPWater/Sanitary
5 projects · most recent 08/18/2026
General Wiring
FiledStatusContractorScope
08/18/2026CompleteHIGH LEG 208 VOLTS ELECL1 meters, 1 new_meters
02/12/2026Permit IssuedCANNELLA ELECTRIC INC—
02/12/2026Permit IssuedCANNELLA ELECTRIC INC—
09/16/2025CompleteETRICITY ELECTRICAL CO INGeneral Wiring
03/06/2025CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
01/07/2026FinalIsrael Wertentheilprogress
01/07/2026FinalIsrael Wertentheilprogress
07/07/2025HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
07/07/2025Tenant Protection Plan ComplianceShahrish Shuvospecial
07/07/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/07/2025HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
07/07/2025Maintenance informationShahrish Shuvoenergy_progress
07/07/2025HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
06/11/2025HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
06/11/2025Mechanical SystemsShahrish Shuvospecial
06/11/2025Tenant Protection Plan ComplianceShahrish Shuvospecial
06/11/2025FinalShahrish Shuvoprogress
06/11/2025HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
06/11/2025HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
06/11/2025Maintenance informationShahrish Shuvoenergy_progress
05/09/2025FinalFAZAL BANGASHprogress
05/09/2025MasonryFAZAL BANGASHspecial
05/09/2025Structural Stability – Alterations of existing buildingsFAZAL BANGASHspecial
05/09/2025Tenant Protection Plan ComplianceFAZAL BANGASHspecial
05/08/2025Structural Stability – Alterations of existing buildingsFAZAL BANGASHspecial
05/08/2025Tenant Protection Plan ComplianceFAZAL BANGASHspecial
05/08/2025FinalFAZAL BANGASHprogress
05/08/2025MasonryFAZAL BANGASHspecial
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/20/2026Q01187421-I1Request digital key ↗
08/20/2026Q01220089-I1Request digital key ↗
08/20/2026Q01220089-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits8
▸BISWORK PERMIT APPLICATION5
05/29/2018421272376Open ↗
05/31/2017421437984Open ↗
05/04/2017421272376Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
05/02/2017421437984Open ↗
12/01/2016421272376Open ↗
03/08/2016421272376Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/20/2026Q01220089-P1Open ↗
08/20/2026Q01220089-I1Open ↗
08/13/2026Q01343623-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/20/2026Q01220089-I1Open ↗
09/02/2026Q01343623-I1Open ↗
08/29/2026Q01343625-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/20/2026Q01220089-I1Open ↗
09/20/2026Q01220089-I1Open ↗
08/28/2026Q01220089-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/08/2016421272376Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/08/2016421272376Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/08/2016421272376Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/06/2016421272376Open ↗
03/08/2016421272376Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
11/08/2017421437984Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
05/02/2017421437984Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/20/2026Q01220089-P1Open ↗
08/20/2026Q01220089-I1Open ↗
08/13/2026Q01343625-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/02/2017421437984Open ↗
03/08/2016421272376Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/08/2016421272376Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/08/2017421437984Open ↗
▸BISRevocation Letter1
04/27/2018421272376Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/08/2016421272376Open ↗
▸BISSUPERSEDING LETTER1
05/04/2017421272376Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
11/08/2017421437984Open ↗
05/02/2017421437984Open ↗
03/08/2016421272376Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
05/02/2017421437984Open ↗
03/08/2016421272376Open ↗
▸BISBOROUGH INTAKE FORM1
11/08/2017421437984Open ↗
▸BISADDITIONAL INFORMATION1
12/06/2016421272376Open ↗