← Back
Three families
39-51 57 STREET
QUEENS · BIN 4623769
💬 Discuss this project
2022Year Built
3Stories
C0Building Class
R5BZoning
3,780 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · 3,000 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionCivil
Floor 314p · 1 filing · 20 docs
Floor 214p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WOODSIDE 57 STREET REALTY LLC2903/22/2026
JIN SUN CONSTRUCTION203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/15/2025$2.3M—— → —$603/sf building
03/13/2025$2.2M—WOODSIDE 57 STREET REALTY LLC → Private party$593/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEI ARCHITECT PLLC608/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IBUILD CONSULTING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JIN SUN CONSTRUCTION INCGeneral Contractor1503/21/2026
WASOFF PLBG & UTILITY COPlumbing207/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129608/20/2024
SD TESTING & INSPECTION S7010508/20/2024
TRIANGLE INSPECTION & TES7495103/30/2022
Building Lifecycle
All (65)Filed (4)Permit Issued (8)Signed Off (2)Violation (2)Inspection (9)Objection (10)Special Inspection (30)
10/18/2024
Signed off — New Building
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF BUILDING.
Q00543830-I1
08/21/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
STEVE LIN
08/21/2024
Special inspection requirement — Heating Systems
MEHDI GHAZI
08/21/2024
Special inspection requirement — Chimneys and vents
MEHDI GHAZI
08/21/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MEHDI GHAZI
08/21/2024
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
08/21/2024
Special inspection requirement — Structural Steel - Welding
MEHDI GHAZI
08/21/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MEHDI GHAZI
08/21/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
XIUCHENG LI
08/21/2024
Special inspection requirement — Structural Steel - Details
MEHDI GHAZI
08/21/2024
Special inspection requirement — Masonry
MEHDI GHAZI
08/21/2024
Special inspection requirement — Subgrade Inspections
MEHDI GHAZI
08/21/2024
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
08/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
08/21/2024
Special inspection requirement — Footing and Foundation
MEHDI GHAZI
08/21/2024
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
08/21/2024
Special inspection requirement — Structural Wood Frame
MEHDI GHAZI
08/21/2024
Special inspection requirement — Final
MEHDI GHAZI
08/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
08/21/2024
Special inspection requirement — Maintenance information
MEHDI GHAZI
08/21/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
08/21/2024
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
08/21/2024
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
08/21/2024
Special inspection requirement — Fenestration areas
MEHDI GHAZI
08/21/2024
Special inspection requirement — Permanent certificate
MEHDI GHAZI
08/21/2024
Special inspection requirement — Interior lighting power
MEHDI GHAZI
08/21/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
08/21/2024
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
08/21/2024
Special inspection requirement — Air barrier — testing
MEHDI GHAZI
08/21/2024
Special inspection requirement — Duct leakage testing, insulation and design
MEHDI GHAZI
08/21/2024
Special inspection requirement — Structural Steel - High Strength Bolting
MEHDI GHAZI
08/20/2024
Filed — New Building
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF BUILDING.
Q00543830-P4
07/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/20/2024
Filed — New Building
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF BUILDING.
Q00543830-P2
04/12/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/25/2024
Signed off — New Building
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF BUILDING.
Q00543830-S1
01/05/2024
Permit issued — Earth Work
Q00543830-I1-ST
01/05/2024
Permit issued — Structural
Q00543830-I1-MS
11/17/2023
Permit issued — Plumbing
Q00543830-S1-PL
08/07/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
08/02/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/18/2023
Permit issued — Plumbing
Q00543830-S1-EW-SP
06/02/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/22/2023
Permit issued — Earth Work
Q00543830-I1-GC-CX
01/13/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/13/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/04/2022
Permit issued — Sprinklers
Q00543830-S1-PL
10/31/2022
Violation issued (ECB, closed)
Construction
10/31/2022
Violation issued (ECB, closed)
Construction
05/11/2022
Permit issued — Foundation
Q00543830-I1-GC-CX
04/20/2022
Permit issued — Structural
Q00543830-I1-GC-CX
04/03/2022
Objection raised — Scope
04/03/2022
Objection resolved — Addressed
03/30/2022
Filed — New Building
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF BUILDING.
Q00543830-S1
08/03/2021
Objection raised — Other
08/03/2021
Objection resolved — Addressed
08/03/2021
Objection raised — Other
08/03/2021
Objection resolved — Addressed
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkSigned-offJIN L. LIN01/05/2024
DOB NOWStructuralSigned-offJIN L. LIN01/05/2024
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO11/17/2023
DOB NOWPlumbingSigned-offCITYWIDE PLBG, HTG &SPRKL07/18/2023
DOB NOWEarth WorkPermit IssuedJIN L. LIN05/22/2023
DOB NOWSprinklersSigned-offWASOFF PLBG & UTILITY CO11/04/2022
DOB NOWFoundationPermit IssuedJIN L. LIN05/11/2022
DOB NOWStructuralPermit IssuedJIN L. LIN04/20/2022
1 project · most recent 08/20/2024
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/20/2024Signed-offJIN SUN CONSTRUCTION INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Gree MULTIU42HP230V1DO 42,000 BTU · Heat Pump Outdoor ×6
MULTIU36HP230V1DO 36,000 BTU · Heat Pump Outdoor ×4
Lg LMU363HV 36,000 BTU · Heat Pump Outdoor ×3
Heating
Navien NCB-150E 120,000 BTU · Boiler ×16
NCB-190/080H 74,000 BTU · Boiler ×4
Gree MULTIU42HP230V1DO 42,000 BTU · Heat Pump Outdoor ×2
Ventilation
Broan ERV100S 100 CFM · Erv ×15
1 project · most recent 08/20/2024
Sprinkler System
FiledStatusContractorScope
08/20/2024Signed-offDYNAMIC PLBNG & SPRKR CORSprinkler System
1 project · most recent 08/20/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/20/2024Signed-offWASOFF PLBG & UTILITY COGas, Storm, Water/Sanitary
1 project · most recent 11/28/2023
General Wiring
FiledStatusContractorScope
11/28/2023CompleteRIGHTWAY ELECTRICAL INCGeneral Wiring
1 project · most recent 08/20/2024
Steel Concrete Masonry Wood
FiledStatusContractorScope
08/20/2024Signed-offJIN SUN CONSTRUCTION INCSteel, Concrete, Masonry, Wood
1 project · most recent 08/20/2024
Earthwork
FiledStatusContractorScope
08/20/2024Signed-offJIN SUN CONSTRUCTION INCEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/07/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
08/02/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/02/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/13/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/13/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/13/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/21/2024Subsurface Investigations (Borings/Test Pits)STEVE LINspecial
08/21/2024Subsurface Investigations (Borings/Test Pits)STEVE LINspecial
08/21/2024Heating SystemsMEHDI GHAZIspecial
08/21/2024Chimneys and ventsMEHDI GHAZIspecial
08/21/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMEHDI GHAZIspecial
08/21/2024Mechanical SystemsMEHDI GHAZIspecial
08/21/2024Structural Steel - WeldingMEHDI GHAZIspecial
08/21/2024Excavations - Sheeting, Shoring, and BracingMEHDI GHAZIspecial
08/21/2024Subsurface Conditions – Fill Placement & In-Place DensityXIUCHENG LIspecial
08/21/2024Structural Steel - DetailsMEHDI GHAZIspecial
08/21/2024MasonryMEHDI GHAZIspecial
08/21/2024Subgrade InspectionsMEHDI GHAZIspecial
08/21/2024Concrete - Cast-In-PlaceMEHDI GHAZIspecial
08/21/2024Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
08/21/2024Footing and FoundationMEHDI GHAZIprogress
08/21/2024Energy Code Compliance InspectionsMEHDI GHAZIprogress
08/21/2024Structural Wood FrameMEHDI GHAZIprogress
08/21/2024FinalMEHDI GHAZIprogress
08/21/2024Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
08/21/2024Maintenance informationMEHDI GHAZIenergy_progress
08/21/2024Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
08/21/2024Insulation placement and R valuesMEHDI GHAZIenergy_progress
08/21/2024Fenestration air leakageMEHDI GHAZIenergy_progress
08/21/2024Fenestration areasMEHDI GHAZIenergy_progress
08/21/2024Permanent certificateMEHDI GHAZIenergy_progress
Latest 25 of 150.
▾Documents — 239 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026Q00543830-P3Request digital key ↗
08/26/2026Q00543830-P4Request digital key ↗
08/26/2026Q00543830-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records17
▸DOB NOWRestrictive Declaration/Easement 16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026Q00543830-I1Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications180
▸DOB NOWProgress Inspector Seal & Signature101
09/23/2026Q00543830-S1Open ↗
09/01/2026Q00543830-P3Open ↗
09/01/2026Q00543830-P3Open ↗
Showing 3 of 101 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature73
09/23/2026Q00543830-S1Open ↗
09/23/2026Q00543830-S1Open ↗
09/23/2026Q00543830-S1Open ↗
Showing 3 of 73 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026Q00543830-P2Open ↗
08/26/2026Q00543830-P3Open ↗
08/26/2026Q00543830-P1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist5
08/13/2026Q00543830-P4Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT5
08/13/2026Q00543830-I1Open ↗
08/13/2026Q00543830-P2Open ↗
08/13/2026Q00543830-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00543830-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00543830-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
08/13/2026Q00543830-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026Q00543830-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial5
08/13/2026Q00543830-P4Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdditional Insured Authorizations1
08/13/2026Q00543830-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00543830-I1Open ↗