← Back
Two family frame
39-51 64 STREET
QUEENS · Woodside · BIN 4030090
💬 Discuss this project
1901Year Built
2Stories
B2Building Class
R4-1Zoning
1,360 sfGross Floor Area
2Units
15 Open Violations 14 unresolved · 1 paperwork only ▸
Two family frame · Owner of record: 64 ST WOODSIDE LLC · 2,000 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 22p · 1 filing · 8 docs
Floor 14p · 1 filing · 8 docs
Cellar2p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
64 ST WOODSIDE1807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HUAN DESIGN INC.107/02/2025
SQUARE ARCH, LLC107/02/2025
MEHDI GHAZI, P.E., P.C.204/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IBUILD CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor107/08/2026
XUXU CONSTRUCTION INCGeneral Contractor104/09/2026
ARANDA PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HUAN DESIGN INC7669207/02/2025
MEHDI GHAZI, P.E. P.C.7129204/18/2022
Building Lifecycle
All (39)Filed (4)Permit Issued (3)Signed Off (2)Violation (26)Inspection (2)Special Inspection (2)
05/18/2026
Signed off — Alteration
REPLACE BATHROOMS PLUMBING FIXTURES AND LEGALIZATION FOR 2 BATHROOMS ON THE 1ST FLOOR IN THE EXISTING TWO FAMILY BUILDING ADDRESS VIOLATION 35634776J & 35592546L.
Q01250339-S1
03/10/2026
Signed off — Alteration
REPLACE BATHROOMS PLUMBING FIXTURES AND LEGALIZATION FOR 2 BATHROOMS ON THE 1ST FLOOR IN THE EXISTING TWO FAMILY BUILDING ADDRESS VIOLATION 35634776J & 35592546L.
Q01250339-I1
02/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/05/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/18/2025
Permit issued — General Construction
Q01250339-I1-GC
09/18/2025
Permit issued — Plumbing
Q01250339-S1-PL
07/02/2025
Filed — Alteration
REPLACE BATHROOMS PLUMBING FIXTURES AND LEGALIZATION FOR 2 BATHROOMS ON THE 1ST FLOOR IN THE EXISTING TWO FAMILY BUILDING ADDRESS VIOLATION 35634776J & 35592546L.
Q01250339-S1
07/02/2025
Filed — Alteration
REPLACE BATHROOMS PLUMBING FIXTURES AND LEGALIZATION FOR 2 BATHROOMS ON THE 1ST FLOOR IN THE EXISTING TWO FAMILY BUILDING ADDRESS VIOLATION 35634776J & 35592546L.
Q01250339-I1
01/21/2025
Violation issued (HPD, open)
C
01/21/2025
Violation issued (HPD, open)
C
01/21/2025
Violation issued (HPD, open)
C
01/21/2025
Violation issued (HPD, open)
B
01/21/2025
Violation issued (HPD, open)
C
01/21/2025
Violation issued (HPD, open)
C
01/21/2025
Violation issued (HPD, open)
C
06/14/2022
Violation issued (HPD, open)
C
06/14/2022
Violation issued (HPD, open)
C
06/14/2022
Violation issued (HPD, open)
B
05/13/2022
Permit issued — General Construction
Q00712322-I1-GC
04/18/2022
Filed — Alteration
REMOVE AND INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH TO REMOVE VIOLATION #35634776J. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00712322-S1
04/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
04/05/2022
Filed — Alteration
REMOVE AND INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH TO REMOVE VIOLATION #35634776J. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00712322-I1
04/05/2022
Violation issued (HPD, open)
B
04/05/2022
Violation issued (HPD, open)
C
04/05/2022
Violation issued (HPD, open)
C
04/05/2022
Violation issued (HPD, open)
C
04/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
03/01/2022
Violation issued (ECB, closed)
Quality of Life
03/01/2022
Violation issued (ECB, closed)
Quality of Life
03/01/2022
Violation issued (ECB, closed)
Quality of Life
03/01/2022
Violation issued (ECB, closed)
Construction
03/01/2022
Violation issued (ECB, closed)
Quality of Life
03/01/2022
Violation issued (ECB, closed)
Quality of Life
03/01/2022
Violation issued (ECB, closed)
Construction
03/01/2022
Violation issued (ECB, closed)
Construction
03/01/2022
Violation issued (ECB, closed)
Quality of Life
03/01/2022
Violation issued (ECB, closed)
Construction
03/01/2022
Violation issued (ECB, open)
Quality of Life
03/01/2022
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offXUXU CONSTRUCTION INC09/18/2025
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP09/18/2025
DOB NOWGeneral ConstructionPermit IssuedSPLEN CONSTRUCTION INC05/13/2022
1 project · most recent 04/18/2022
Gas Water/Sanitary
FiledStatusContractorScope
04/18/2022——Gas, Water/Sanitary
1 project · most recent 08/26/2025
General Wiring
FiledStatusContractorScope
08/26/2025CompleteAPPO ELECTRICAL CONTRS INGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/05/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
04/08/2022Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
04/04/2022Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00712322-I1Request digital key ↗
08/26/2026Q00712322-S1Request digital key ↗
08/19/2026Q01250339-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00712322-S1Open ↗
08/26/2026Q00712322-I1Open ↗
08/19/2026Q01250339-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/27/2026Q00712322-S1Open ↗
08/25/2026Q00712322-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00712322-I1Open ↗
08/26/2026Q00712322-S1Open ↗
08/19/2026Q01250339-I1Open ↗
Showing 3 of 4 on file for this type