Parochial school, yeshiva
39-66 58TH STREET
QUEENS · Woodside · BIN 4454759
💬 Discuss this project
1927Year Built
3Stories
W2Building Class
R5BZoning
46,275 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Parochial school, yeshiva · Owner of record: St Sebastian Church · 32,731 sf lot · 1.41 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Sub-BasementSt Sebastian Church5p · 1 filing · 10 docs
Site & exteriorSt Sebastian Church4p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RC Church of St Sebastian707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Me Engineers310/07/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jam Service CoPlumbing207/08/2026
Jansons AssoicatesGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jaj Engineering930110/07/2022
Building Lifecycle
All (12)Filed (3)Permit Issued (3)Signed Off (2)Inspection (3)Special Inspection (1)
09/01/2023
Signed off — Alteration
Subsequent application filed to Remove Existing Flue and supports(to be reused) Provide new Stainless Steel Chimney for entire run, maintain existing termination location, provide new wall supports along length of flue Run.
Q08011266-S2
08/31/2023
Signed off — Alteration
Subsequent application filed to Remove Existing Flue and supports(to be reused) Provide new Stainless Steel Chimney for entire run, maintain existing termination location, provide new wall supports along length of flue Run.
Q08011266-I1
08/30/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/29/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/19/2023
Permit issued — Mechanical Systems
Q08011266-S2-MS
10/17/2022
Permit issued — Plumbing
Q08011266-S1-PL
10/17/2022
Permit issued — Boiler Equipment
Q08011266-I1-BE
10/07/2022
Filed — Alteration
Subsequent application filed to Remove Existing Flue and supports(to be reused) Provide new Stainless Steel Chimney for entire run, maintain existing termination location, provide new wall supports along length of flue Run.
Q08011266-S2
10/07/2022
Filed — Alteration
Subsequent application filed to Remove Existing Flue and supports(to be reused) Provide new Stainless Steel Chimney for entire run, maintain existing termination location, provide new wall supports along length of flue Run.
Q08011266-S1
10/05/2022
Filed — Alteration
Subsequent application filed to Remove Existing Flue and supports(to be reused) Provide new Stainless Steel Chimney for entire run, maintain existing termination location, provide new wall supports along length of flue Run.
Q08011266-I1
10/01/2022
Special inspection requirement — Maintenance information
MICHAEL TORTORELLA
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJansons Assoicates07/19/2023
DOB NOWPlumbingSigned-offJam Service Co10/17/2022
DOB NOWBoiler EquipmentSigned-offJam Service Co10/17/2022
1 project · most recent 10/07/2022
Others
FiledStatusContractorScopeMake / Model / Capacity
10/07/2022Signed-offJansons AssoicatesOthers
Other
Schebler Model P2 Double Wall 12" diameter w/ 2" insulation Chimney ×1
1 project · most recent 10/07/2022
Gas
FiledStatusContractorScope
10/07/2022Signed-offJam Service CoGas
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/29/2023Pass-Final Boiler Equipment InspectionPassView ↗
07/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
10/01/2022Maintenance informationMICHAEL TORTORELLAenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
St Sebastian ChurchReligiousSub-basement
Project Q08011266 Alteration · Permit Entire · 10/05/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026Q08011266-S2Request digital key ↗
08/25/2026Q08011266-S1Request digital key ↗
08/25/2026Q08011266-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026Q08011266-S2Open ↗
08/25/2026Q08011266-S1Open ↗
08/25/2026Q08011266-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026Q08011266-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026Q08011266-S2Open ↗
08/25/2026Q08011266-S1Open ↗
08/25/2026Q08011266-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026Q08011266-S2Open ↗
08/13/2026Q08011266-S1Open ↗
08/13/2026Q08011266-I1Open ↗