← Back
BuildNYC
Two stories - detached, small or mid-size
39 DE HART AVENUE
STATEN ISLAND · BIN 5027456
💬 Discuss this project
1915Year Built
2.5Stories
A1Building Class
R3AZoning
1,076 sfGross Floor Area
1Units
7 Active Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,500 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 24p · 2 filings · 3 docs
Floor 14p · 2 filings · 3 docs
Cellar4p · 2 filings · 3 docs
Site & exterior1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Alfred V Saulo, Architect111/10/2025
Vedernikov Engineering111/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VSS Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BT's Plumbing and HeatingPlumbing207/08/2026
Hhi TechGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alfred V Saulo, Architect1905211/10/2025
Building Lifecycle
11/19/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
S01246304-I1-GC
11/19/2025
Permit issued — General Construction
S01246304-I1-GC
11/10/2025
Filed — Alteration
NEW CURB WALL ALONG PROPERTY LINE ADJACENT TO LOT 55 (#43). FILED IN CONJUNCTION w/ NEW CC FRONTING LOT 55 PER DOB NOW JOB NO. S01223770-I1 AND PARKING EASEMENT PER LAND DOC, NO. 881999
S01246304-I1
11/22/2024
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
S24120535-I1-PL
10/04/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
35 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHhi Tech11/19/2025
DOB NOWPlumbingPermit IssuedBT's Plumbing and Heating11/22/2023
DOB NOWPlumbingPermit IssuedBT's Plumbing and Heating07/15/2022
1 project · most recent 11/02/2021
Gas
FiledStatusContractorScope
11/02/2021Permit IssuedBT's Plumbing and HeatingGas
1 project · most recent 12/16/2021
General Wiring
FiledStatusContractorScope
12/16/2021Permit IssuedStability Electric EnterprisesGeneral Wiring
1 project · most recent 11/10/2025
FiledStatusContractorScope
11/10/2025Permit IssuedHhi Tech—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/17/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/30/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/13/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
11/02/2021Fire-Resistant Penetrations and JointsALFRED SAULOspecial
23 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account