← Back
Walk-up apt, over six families with stores
39 MOTT STREET
MANHATTAN · BIN 1079240
💬 Discuss this project
1915Year Built
5Stories
C7Building Class
C6-1Zoning
8,514 sfGross Floor Area
10Units
Rent Stabilized40 Open Violations 33 unresolved · 7 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · 2,330 sf lot · 3.65 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THE OWNER OF203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INDETAIL ARCHITECTURAL AND ENGIN506/02/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX BUILDING CONSULTING503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMC PLBG, HTG & CLNG, INCPlumbing507/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INDETAIL DESIGN ARCHITECT4828506/02/2022
Building Lifecycle
All (80)Filed (5)Permit Issued (2)Signed Off (2)Violation (60)Inspection (7)Special Inspection (4)
11/22/2024
Violation issued (HPD, closed)
I
08/15/2023
Violation issued (ECB, closed)
Boilers
09/21/2022
Signed off — Alteration
REPLACE GAS PIPING, REPLACE ONE BOILER. CAP AND REMOVED ALL RESIDENTIAL GAS METER. USE ELECTRICAL COOKING FOR RESIDENTIAL UNIT. BOILER WORK TYPE FILE UNDER M00612970.
M00612963-I1
09/16/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/02/2022
Filed — Alteration
REPLACE GAS PIPING, REPLACE ONE BOILER. CAP AND REMOVED ALL RESIDENTIAL GAS METER. USE ELECTRICAL COOKING FOR RESIDENTIAL UNIT. BOILER WORK TYPE FILE UNDER M00612970.
M00612963-P1
06/02/2022
Signed off — Alteration
FILED BOILER WORK TYPE FOR BOILER REPLACEMENT
M00612970-I1
06/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jonathan Chin
06/02/2022
Special inspection requirement — HVAC-R and service water heating equipment
Jonathan Chin
03/07/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/16/2022
Violation issued (ECB, closed)
Plumbing
02/09/2022
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
01/21/2022
Filed — Alteration
FILED BOILER WORK TYPE FOR BOILER REPLACEMENT
M00612970-P2
01/21/2022
Special inspection requirement — Heating Systems
Jonathan Chin
01/21/2022
Special inspection requirement — Heating Systems
Jonathan Chin
01/19/2022
Violation issued (HPD, closed)
C
01/19/2022
Violation issued (HPD, closed)
C
01/19/2022
Violation issued (HPD, open)
B
01/04/2022
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
12/28/2021
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
12/17/2021
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
12/16/2021
Filed — Alteration
FILED BOILER WORK TYPE FOR BOILER REPLACEMENT
M00612970-P1
12/10/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/26/2021
Permit issued — Plumbing
M00612963-I1-PL
11/09/2021
Permit issued — Boiler Equipment
M00612970-I1-BE
10/15/2021
Filed — Alteration
REPLACE GAS PIPING, REPLACE ONE BOILER. CAP AND REMOVED ALL RESIDENTIAL GAS METER. USE ELECTRICAL COOKING FOR RESIDENTIAL UNIT. BOILER WORK TYPE FILE UNDER M00612970.
M00612963-I1
10/15/2021
Filed — Alteration
FILED BOILER WORK TYPE FOR BOILER REPLACEMENT
M00612970-I1
10/09/2018
Violation issued (HPD, closed)
I
09/07/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/07/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/06/2016
Violation issued (ECB, closed)
Construction
06/06/2016
Violation issued (ECB, closed)
Construction
12/05/2012
Violation issued (HPD, closed)
C
05/30/2012
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/30/2012
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/30/2012
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/30/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/30/2012
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/28/2012
Violation issued (ECB, open)
Boilers
02/28/2012
Violation issued (ECB, closed)
Construction
02/28/2012
Violation issued (ECB, open)
Unknown
02/28/2012
Violation issued (ECB, open)
Construction
02/28/2012
Violation issued (ECB, open)
Boilers
03/14/2006
Violation issued (HPD, closed)
C
03/14/2006
Violation issued (HPD, open)
C
03/14/2006
Violation issued (HPD, closed)
C
03/14/2006
Violation issued (HPD, closed)
C
12/16/2003
Violation issued (ECB, closed)
Elevators
03/21/2003
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/19/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/04/2001
Violation issued (ECB, open)
Construction
02/24/1998
Violation issued (ECB, open)
Construction
02/24/1998
Violation issued (ECB, open)
Construction
03/08/1996
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/08/1996
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/17/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/17/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/18/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/18/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/07/1992
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC11/26/2021
DOB NOWBoiler EquipmentSigned-offAMC PLBG, HTG & CLNG, INC11/09/2021
BISPLISSUEDTRIBORO WTR MN & SWR CO C12/20/2012
BISOTISSUEDKINGS BUILDERS GROUP INC11/02/2012
BISOTISSUEDKINGS BUILDERS GROUP INC10/23/2012
BISEQISSUEDTALICO CONSTRUCTION CORP03/13/2012
BISOTISSUEDHSU AND ASSOCIATES INC03/14/2001
3 projects · most recent 08/11/2022
General Wiring Lighting
FiledStatusContractorScope
08/11/2022CancelledA.C. MORGAN ELECTRICGeneral Wiring
03/14/2019Permit IssuedKJK ELECTRIC INCGeneral Wiring
01/30/2018Permit IssuedKWONG MING ELECTRIC INCGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/16/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/09/2022No Access-Final Boiler Equipment InspectionNo AccessView ↗
01/04/2022Fail-Final Boiler Equipment InspectionFailView ↗
12/28/2021No Access-Final Boiler Equipment InspectionNo AccessView ↗
12/17/2021No Access-Final Boiler Equipment InspectionNo AccessView ↗
12/10/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
06/02/2022Fire-Resistant Penetrations and JointsJonathan Chinspecial
06/02/2022HVAC-R and service water heating equipmentJonathan Chinenergy_progress
01/21/2022Heating SystemsJonathan Chinspecial
01/21/2022Heating SystemsJonathan Chinspecial
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/03/2026M00612963-P1Request digital key ↗
09/03/2026M00612963-I1Request digital key ↗
09/03/2026M00612970-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION6
05/19/2021123113889Open ↗
08/31/2018123113889Open ↗
06/08/2018123113889Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
10/18/2021123113889Open ↗
12/24/2012121025522Open ↗
11/26/2012121401063Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications21
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
06/08/2018123113889Open ↗
03/04/2015121006400Open ↗
01/30/2015121025522Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/03/2026M00612963-I1Open ↗
09/03/2026M00612970-I1Open ↗
09/03/2026M00612970-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/29/2026M00612970-P2Open ↗
09/23/2026M00612970-I1Open ↗
08/27/2026M00612963-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/08/2018123113889Open ↗
03/16/2012121006400Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/08/2018123113889Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/16/2012121006400Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026M00612963-I1Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
08/31/2018123113889Open ↗
06/08/2018123113889Open ↗
▸BISSCHEDULE B - PLUMBING2
05/19/2021123113889Open ↗
04/24/2012121025522Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
06/28/2013121025522Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
06/08/2018123113889Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS-CERTIFICATION (DEP ACP5)3
04/23/2012121025522Open ↗
04/23/2012121025522Open ↗
06/08/2018123113889Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/09/2012121401063Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/30/2015121025522Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00612963-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISADMINISTRATIVE OBJECTIONS3
10/09/2012121401063Open ↗
04/23/2012121025522Open ↗
03/16/2012121006400Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/04/2015121006400Open ↗
01/30/2015121025522Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
06/08/2018123113889Open ↗
01/30/2015121025522Open ↗
10/09/2012121401063Open ↗
Showing 3 of 4 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
11/26/2012121401063Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET4
06/08/2018123113889Open ↗
10/09/2012121401063Open ↗
04/24/2012121025522Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
08/31/2018123113889Open ↗
▸Other Documents6
▸DOB NOWDHCR Document5
09/03/2026M00612963-I1Open ↗
09/03/2026M00612970-I1Open ↗
09/03/2026M00612970-P1Open ↗
Showing 3 of 5 on file for this type
▸BISDHCR DOCUMENT1
10/05/2021123113889Open ↗