← Back
Two stories - detached, small or mid-size
39 ROKEBY PLACE
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5002424
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R2Zoning
1,729 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,750 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR104/16/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281104/16/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
09/30/2025
Signed off — Alteration
Installation of solar panels, rooftop, railed, grid-tied, 18 modules, 7.38 KW
S01211340-I1
04/18/2025
Permit issued — Solar
S01211340-I1-SL
04/16/2025
Filed — Alteration
Installation of solar panels, rooftop, railed, grid-tied, 18 modules, 7.38 KW
S01211340-I1
04/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
04/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
04/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
04/16/2025
Special inspection requirement — Final
Mina Makar
04/16/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR04/18/2025
1 project · most recent 04/16/2025
FiledStatusContractorScope
04/16/2025CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/16/2025Fire-Resistant Penetrations and JointsMina Makarspecial
04/16/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
04/16/2025Energy Code Compliance InspectionsMina Makarprogress
04/16/2025FinalMina Makarprogress
04/16/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026S01211340-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026S01211340-I1Open ↗
08/24/2026S01211340-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01211340-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026S01211340-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01211340-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01211340-I1Open ↗