← Back
Miscellaneous two family
39 STOBE AVENUE
STATEN ISLAND · Grasmere-Arrochar-South Beach-Dongan Hills · BIN 5141715
💬 Discuss this project
2001Year Built
2Stories
B9Building Class
R3XZoning
1,275 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 2,725 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
Electrical
Roof2p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/18/2025
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
10/09/2025
Signed off — Alteration
S01271128-I1
08/21/2025
Permit issued — Solar
S01271128-I1-SL
08/18/2025
Filed — Alteration
S01271128-I1
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/13/2025
Special inspection requirement — Final
Walid Abdulla
08/13/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
12/29/2004
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/21/2025
1 project · most recent 08/18/2025
FiledStatusContractorScope
08/18/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/13/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/13/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/13/2025Energy Code Compliance InspectionsWalid Abdullaprogress
08/13/2025FinalWalid Abdullaprogress
08/13/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026S01271128-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/30/2026S01271128-I1Open ↗
08/30/2026S01271128-I1Open ↗
08/30/2026S01271128-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026S01271128-I1Open ↗
08/30/2026S01271128-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01271128-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01271128-I1Open ↗