← Back
Three families
39 WILLOW PLACE
BROOKLYN · BIN 3002311
💬 Discuss this project
1848Year Built
3Stories
C0Building Class
R6Zoning
4,400 sfGross Floor Area
3Units
Rent Stabilized6 Open Violations ▸
Three families · 2,500 sf lot · 1.76 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Roof2p · 1 filing · 20 docs
Floor 334p · 2 filings · 20 docs
Floor 235p · 2 filings · 20 docs
Floor 133p · 2 filings · 20 docs
Cellar38p · 3 filings · 20 docs
Basement37p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GSD5407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/15/2023$5.3M—Private party → Private party$1,216/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLBERG ARCHITECTURE802/04/2026
COLLECTIF ENGINEERING PLLC601/22/2025
ALBANNA ENGINEERING PC101/09/2024
JWM GROUP LLC212/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.L.D. MANAGEMENT SERV INGeneral Contractor1107/08/2026
GENESIS PLBG AND HTG CORPPlumbing307/08/2026
DDS MECHANICAL FPS CORPFire Protection207/08/2026
M & J ELEC'L CONTR'S CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COLBERG ARCHITECTURE7683902/04/2026
COLLECTIF ENGINEERING, PL7799601/22/2025
C.M. TESTING LABORATORY,1352401/01/2025
ALBANNA ENGINEERING PC2401101/09/2024
Building Lifecycle
All (165)Filed (17)Permit Issued (12)Signed Off (9)Violation (11)Inspection (10)Objection (76)Special Inspection (30)
05/06/2026
Violation issued (HPD, open)
A
02/26/2026
Signed off — Alteration CO
Alt/CO filed to change the building to a 2 family residential building and new work at rear of building.
B00958087-I1
02/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eugene Colberg
02/04/2026
Filed — Alteration CO
Alt/CO filed to change the building to a 2 family residential building and new work at rear of building.
B00958087-P2
12/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eugene Colberg
11/18/2025
Violation issued (HPD, open)
I
06/11/2025
Violation issued (HPD, open)
A
04/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/17/2025
Filed — Alteration CO
Alt/CO filed to change the building to a 2 family residential building and new work at rear of building.
B00958087-P1
03/10/2025
Signed off — Alteration
Structural work as shown on plans filed herewith.
B00840411-S1
02/26/2025
Signed off — Alteration
Structural work as shown on plans filed herewith.
B00840411-S2
02/24/2025
Signed off — Alteration
Structural work as shown on plans filed herewith.
B00840411-I1
02/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eugene Colberg
01/28/2025
Signed off — Alteration
Sprinkler work as shown on plans.
B00887414-I1
01/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eugene Colberg
01/28/2025
Special inspection requirement — Post-installed Anchors
RAFAEL FIGUEROA
01/22/2025
Filed — Alteration
Structural work as shown on plans filed herewith.
B00840411-P7
01/08/2025
Signed off — Alteration CO
Alt/CO filed to change the building to a 2 family residential building and new work at rear of building.
B00958087-S1
01/07/2025
Signed off — Alteration
Demolition work as shown on plans for Plumbing. No change in use, occupancy, or egress.
B00840418-I1
01/07/2025
Signed off — Alteration
Structural work as shown on plans filed herewith.
B00840411-S4
01/07/2025
Signed off — Alteration
Structural work as shown on plans filed herewith.
B00840411-S5
01/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
01/02/2025
Special inspection requirement — Final
Eugene Colberg
01/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
JOHN SEMIOLI
01/01/2025
Filed — Alteration
Structural work as shown on plans filed herewith.
B00840411-P6
12/19/2024
Special inspection requirement — Post-installed Anchors
RAFAEL FIGUEROA
12/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eugene Colberg
12/12/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/05/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/02/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/25/2024
Permit issued — Sprinklers
B00887414-I1-EW-SP
11/25/2024
Violation issued (HPD, open)
I
11/25/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/23/2024
Special inspection requirement — Mechanical Systems
RAFAEL FIGUEROA
10/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eugene Colberg
10/23/2024
Special inspection requirement — Final
RAFAEL FIGUEROA
10/22/2024
Filed — Alteration
Structural work as shown on plans filed herewith.
B00840411-P5
10/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eugene Colberg
10/10/2024
Special inspection requirement — Final
RAFAEL FIGUEROA
10/10/2024
Special inspection requirement — Mechanical Systems
RAFAEL FIGUEROA
06/20/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/21/2024
Permit issued — Foundation
B00840411-S5-FO
05/21/2024
Permit issued — General Construction
B00840411-I1-GC
05/01/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/12/2024
Violation issued (HPD, open)
A
04/10/2024
Permit issued — Plumbing
B00840418-I1-PL
03/01/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/09/2024
Permit issued — Structural
B00840411-S4-ST
01/29/2024
Permit issued — Structural
B00958087-S1-ST
01/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/10/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
01/09/2024
Filed — Alteration CO
Alt/CO filed to change the building to a 2 family residential building and new work at rear of building.
B00958087-S1
01/05/2024
Permit issued — General Construction
B00958087-I1-GC
01/03/2024
Objection resolved — Addressed
12/29/2023
Objection resolved — Addressed
12/28/2023
Filed — Alteration
Structural work as shown on plans filed herewith.
B00840411-P3
12/26/2023
Objection resolved — Addressed
12/26/2023
Objection resolved — Addressed
12/26/2023
Objection resolved — Addressed
12/21/2023
Objection raised — Other
Latest 60 of 165 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offDDS MECHANICAL FPS CORP11/25/2024
DOB NOWFoundationSigned-offA.L.D. MANAGEMENT SERV IN05/21/2024
DOB NOWGeneral ConstructionSigned-offA.L.D. MANAGEMENT SERV IN05/21/2024
DOB NOWPlumbingSigned-offGENESIS PLBG AND HTG CORP04/10/2024
DOB NOWStructuralSigned-offA.L.D. MANAGEMENT SERV IN02/09/2024
DOB NOWStructuralSigned-offA.L.D. MANAGEMENT SERV IN01/29/2024
DOB NOWGeneral ConstructionPermit IssuedA.L.D. MANAGEMENT SERV IN01/05/2024
DOB NOWPlumbingSigned-offGENESIS PLBG AND HTG CORP11/03/2023
DOB NOWMechanical SystemsSigned-offA.L.D. MANAGEMENT SERV IN11/03/2023
DOB NOWSprinklersSigned-offDDS MECHANICAL FPS CORP11/01/2023
DOB NOWPlumbingSigned-offGENESIS PLBG AND HTG CORP05/04/2023
DOB NOWGeneral ConstructionSigned-offA.L.D. MANAGEMENT SERV IN05/03/2023
2 projects · most recent 11/13/2025
General Wiring
FiledStatusContractorScope
11/13/2025CompleteM & J ELEC'L CONTR'S CORPGeneral Wiring
05/08/2023CompleteM & J ELEC'L CONTR'S CORP—
1 project · most recent 02/04/2026
FiledStatusContractorScope
02/04/2026Signed-offA.L.D. MANAGEMENT SERV IN1 scope_items
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/12/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/05/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/02/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/25/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/20/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/10/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
02/13/2026Fire-Resistant Penetrations and JointsEugene Colbergspecial
12/18/2025Fire-Resistant Penetrations and JointsEugene Colbergspecial
02/19/2025Fire-Resistant Penetrations and JointsEugene Colbergspecial
01/28/2025Fire-Resistant Penetrations and JointsEugene Colbergspecial
01/28/2025Post-installed AnchorsRAFAEL FIGUEROAspecial
01/02/2025Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
01/02/2025FinalEugene Colbergprogress
01/02/2025Fire-Resistance Rated ConstructionJOHN SEMIOLIprogress
12/19/2024Post-installed AnchorsRAFAEL FIGUEROAspecial
12/19/2024Fire-Resistant Penetrations and JointsEugene Colbergspecial
10/23/2024Mechanical SystemsRAFAEL FIGUEROAspecial
10/23/2024Fire-Resistant Penetrations and JointsEugene Colbergspecial
10/23/2024FinalRAFAEL FIGUEROAprogress
10/10/2024Fire-Resistant Penetrations and JointsEugene Colbergspecial
10/10/2024FinalRAFAEL FIGUEROAprogress
10/10/2024Mechanical SystemsRAFAEL FIGUEROAspecial
12/18/2023Post-installed AnchorsRAFAEL FIGUEROAspecial
12/18/2023Fire-Resistant Penetrations and JointsEugene Colbergspecial
12/01/2023Subgrade InspectionsJOHN SEMIOLIspecial
11/15/2023Footing and FoundationJOHN SEMIOLIprogress
11/15/2023FinalJOHN SEMIOLIprogress
10/31/2023Structural Cold-Formed SteelJOHN SEMIOLIspecial
10/31/2023Structural Steel - DetailsJOHN SEMIOLIspecial
10/31/2023Concrete - Cast-In-PlaceJOHN SEMIOLIspecial
10/31/2023Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
Latest 25 of 37.
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/27/2026B00840411-P1Request digital key ↗
08/27/2026B00840411-S2Request digital key ↗
08/27/2026B00840411-S1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits16
▸DOB NOWLPC Approval/Permit16
08/27/2026B00840411-S2Open ↗
08/27/2026B00840411-S1Open ↗
08/27/2026B00840411-P1Open ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications44
▸DOB NOWSpecial Inspector Seal & Signature18
09/27/2026B00840411-P3Open ↗
09/27/2026B00840411-P3Open ↗
09/01/2026B00958087-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/27/2026B00840411-S2Open ↗
08/27/2026B00840411-S1Open ↗
08/27/2026B00840411-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B00840411-P2Open ↗
09/01/2026B00840411-S1Open ↗
08/31/2026B00840411-S5Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026B00958087-P1Open ↗
08/13/2026B00958087-P2Open ↗
08/13/2026B00958087-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form9
08/18/2026B00958087-I1Open ↗
08/18/2026B00958087-S1Open ↗
08/14/2026B00887414-I1Open ↗
Showing 3 of 9 on file for this type
▸Other Documents11
▸DOB NOWProof of Historic Building8
08/27/2026B00840411-P1Open ↗
08/27/2026B00840411-I1Open ↗
08/27/2026B00840411-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProperty Ownership Certification3
08/18/2026B00958087-I1Open ↗
08/18/2026B00958087-P1Open ↗
08/18/2026B00958087-P2Open ↗