← Back
Two family converted from one family
390 PACIFIC STREET
BROOKLYN · BIN 3001123
💬 Discuss this project
1852Year Built
3Stories
B3Building Class
R6BZoning
3,200 sfGross Floor Area
2Units
0 Open Violations
Two family converted from one family · 2,075 sf lot · 1.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction21p · 1 filing · 20 docs
CellarUnder Construction21p · 1 filing · 20 docs
Sub-BasementUnder Construction21p · 1 filing · 20 docs
1 job · most recent 03/23/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/23/2026Permit IssuedMLZ GENERAL CONSTRUCTIONAir Conditioning Systems
Cooling
Mitsubishi Electric SVZ-KP24NA 24,000 BTU · Ahu ×2
MXZ-SM48NAMHZ2 48,000 BTU · Condensing Unit ×1
1 job · most recent 07/21/2026
General Wiring
FiledStatusContractorScope
07/21/2026Permit IssuedSUPER CHARGED ELEC. INC.General Wiring
1 job · most recent 03/23/2026
Steel Wood
FiledStatusContractorScope
03/23/2026Permit IssuedMLZ GENERAL CONSTRUCTIONSteel, Wood
Building Lifecycle
All (16)Filed (4)Permit Issued (5)Violation (2)Inspection (5)
08/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/16/2026
Permit issued — General Construction
B01288601-I1-GC-CX
05/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/01/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/23/2026
Permit issued — General Construction
B01288601-I1-GC-CX
04/13/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/23/2026
Filed — Alteration
INTERIOR ALTERATIONS AT CELLAR, BASEMENT, & FIRST FLOOR. NEW MECHANICAL WORK
B01288601-P1
03/05/2026
Permit issued — Plumbing
B01288601-S2-PL
02/12/2026
Filed — Alteration
INTERIOR ALTERATIONS AT CELLAR, BASEMENT, & FIRST FLOOR. NEW MECHANICAL WORK
B01288601-S2
01/14/2026
Permit issued — Foundation
B01288601-S1-ST
12/09/2025
Filed — Alteration
INTERIOR ALTERATIONS AT CELLAR, BASEMENT, & FIRST FLOOR. NEW MECHANICAL WORK
B01288601-S1
11/24/2025
Permit issued — Mechanical Systems
B01288601-I1-GC-CX
09/19/2025
Filed — Alteration
INTERIOR ALTERATIONS AT CELLAR, BASEMENT, & FIRST FLOOR. NEW MECHANICAL WORK
B01288601-I1
10/05/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/06/2016
Violation issued (ECB, closed)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GAS APPROVED SERVICE103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/14/2025$4.3M—— → —$1,336/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CELIN MUNOZ CONSULTING ENGINEER, PC203/23/2026
Y8 STUDIO ARCHITECTURE, P.C.202/12/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GAMILL ENGINEERING, PC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MLZ GENERAL CONSTRUCTIONGeneral Contractor407/08/2026
NEW AMSTERDAM PLBG & HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JSPECS,INC9429603/23/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMLZ GENERAL CONSTRUCTION06/16/2026
DOB NOWGeneral ConstructionPermit IssuedMLZ GENERAL CONSTRUCTION04/23/2026
DOB NOWPlumbingPermit IssuedEDWARD FITZSIMMONS03/05/2026
DOB NOWFoundationPermit IssuedMLZ GENERAL CONSTRUCTION01/14/2026
DOB NOWMechanical SystemsPermit IssuedMLZ GENERAL CONSTRUCTION11/24/2025
BISPLISSUEDNEW AMSTERDAM PLBG & HTG08/27/2025
BISPLISSUEDVIGILANTE CONTRACTING CO10/06/2016
BISPLISSUEDTOWER PLUMBING & HTG CORP03/17/2009
BISPLISSUEDTOWER PLUMBING & HTG CORP06/25/2007
BISOTISSUEDDARINE GENERAL CONSTRUCTON07/27/2005
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/01/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/13/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
04/06/2026Structural Steel - WeldingJeffrey Stonesspecial
04/06/2026Subgrade InspectionsJeffrey Stonesspecial
04/06/2026Subsurface Investigations (Borings/Test Pits)Celin Munozspecial
04/06/2026Concrete - Cast-In-PlaceJeffrey Stonesspecial
04/06/2026Structural Steel - High Strength BoltingJeffrey Stonesspecial
04/06/2026Structural Cold-Formed SteelJeffrey Stonesspecial
04/06/2026MasonryJeffrey Stonesspecial
04/06/2026Footing and FoundationJeffrey Stonesprogress
04/06/2026Structural Wood FrameJeffrey Stonesprogress
04/06/2026Structural Steel - DetailsJeffrey Stonesspecial
04/06/2026Post-installed AnchorsJeffrey Stonesspecial
04/06/2026Structural Stability – Alterations of existing buildingsJeffrey Stonesspecial
04/06/2026FinalJeffrey Stonesprogress
03/18/2026Structural Cold-Formed SteelJeffrey Stonesspecial
03/11/2026Subgrade InspectionsJeffrey Stonesspecial
03/11/2026Concrete - Cast-In-PlaceJeffrey Stonesspecial
03/11/2026MasonryJeffrey Stonesspecial
03/11/2026Post-installed AnchorsJeffrey Stonesspecial
03/11/2026Structural Stability – Alterations of existing buildingsJeffrey Stonesspecial
03/11/2026Structural Steel - DetailsJeffrey Stonesspecial
03/11/2026Structural Steel - High Strength BoltingJeffrey Stonesspecial
03/11/2026Structural Steel - WeldingJeffrey Stonesspecial
03/11/2026Subsurface Investigations (Borings/Test Pits)Celin Munozspecial
03/11/2026FinalJeffrey Stonesprogress
03/11/2026Footing and FoundationJeffrey Stonesprogress
Latest 25 of 36.
▾Documents — 79 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/18/2026B01288601-P1Request digital key ↗
08/18/2026B01288601-S2Request digital key ↗
08/18/2026B01288601-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION4
07/24/2025301928243Open ↗
07/22/2025321447421Open ↗
07/22/2025301928243Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLPC Approval/Permit4
08/13/2026B01288601-S2Open ↗
08/13/2026B01288601-P1Open ↗
08/13/2026B01288601-S1Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
08/27/2025301928243Open ↗
10/07/2016321447421Open ↗
▸Seals & Professional Certifications18
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026B01288601-I1Open ↗
08/31/2026B01288601-P1Open ↗
08/31/2026B01288601-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026B01288601-I1Open ↗
09/23/2026B01288601-I1Open ↗
08/31/2026B01288601-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/18/2026B01288601-S2Open ↗
08/18/2026B01288601-P1Open ↗
08/18/2026B01288601-S1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/27/2016321447421Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/12/2016321447421Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/12/2016321447421Open ↗
▸Trade Schedules & Equipment9
▸BISEQUIPMENT USE PERMITS1
08/25/2025301928243Open ↗
▸BISSCHEDULE B - PLUMBING1
07/24/2025301928243Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
07/30/2025321447421Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/30/2025321447421Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/12/2016321447421Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/10/2025301928243Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
10/10/2025301928243Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
08/25/2025301928243Open ↗
▸BISHEATING SYSTEMS1
07/30/2025321447421Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
09/12/2016321447421Open ↗
▸BISTenant Protection Plan and Notes1
09/12/2016321447421Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/18/2026B01288601-P1Open ↗
08/18/2026B01288601-S2Open ↗
08/18/2026B01288601-S1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/12/2016321447421Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/25/2025321447421Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/30/2025321447421Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/30/2025321447421Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/12/2016321447421Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/30/2025301928243Open ↗
07/25/2025321447421Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026B01288601-S1Open ↗
08/13/2026B01288601-P1Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
08/08/2025301928243Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
08/08/2025301928243Open ↗
▸BIS* * BORINGS / TEST PITS (TR-4) 27-7201
08/15/2025301928243Open ↗
▸BIS* MASONRY UNITS RS 10-3 3.21
08/08/2025301928243Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01288601-S1Open ↗
▸Approvals, Objections & Sign-offs10
▸BISLANDMARKS SIGNOFF3
10/23/2025301928243Open ↗
08/27/2025301928243Open ↗
08/07/2025321447421Open ↗
▸BISLANDMARKS APPROVAL2
08/27/2025301928243Open ↗
09/27/2016321447421Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/21/2025301928243Open ↗
08/07/2025321447421Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/27/2025301928243Open ↗
▸BISSUPERSEDING LETTER1
08/11/2025301928243Open ↗
▸BISFINAL1
07/30/2025321447421Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT (FINAL): PW32
10/10/2025301928243Open ↗
07/31/2025321447421Open ↗
▸BISCOST AFFIDAVIT1
09/12/2016321447421Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/12/2016321447421Open ↗
▸Other Documents4
▸BIS* FIRE STOPS 27-3451
08/08/2025301928243Open ↗
▸BISMAINTENANCE INFORMATION1
07/30/2025321447421Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
08/08/2025301928243Open ↗
▸BIS* * SUBGRADE 27-723,DIRC 15/711
08/08/2025301928243Open ↗