1925Year Built
15Stories
D4Building Class
R8Zoning
157,300 sfGross Floor Area
108Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SAFE
Elevator cooperative · Owner of record: 390 RIVERSIDE CORP · 12,850 sf lot · 12.24 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 152p · 1 filing · 7 docs
Floor 14
Floor 13
Floor 12
Floor 11Under Construction7p · 1 filing · 7 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5Under Construction8p · 3 filings · 19 docs
Floor 41p · 1 filing · 14 docs
Floor 3
Floor 2
Floor 1
CellarUnder Construction2p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES3107/03/2026
390 RIVERSIDE CORP403/22/2026
CONDUCTOR ELECL SVCS INC103/22/2026
LEEBAR MGMT. CORP903/22/2026
390 RIVERSIDE OWNERS3203/22/2026
390 RIVERSIDE DRIVE OWNERS3303/21/2026
390 RIVERSIDE DRIVE203/21/2026
390 RIVERS203/21/2026
390 RIV DR303/21/2026
300 RIVERS203/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOYD CONSULTING203/21/2026
RICHARD LEWIS ARCHITECT403/21/2026
NOEL BUILDING CONSULTING INC403/21/2026
J CALLAHAN CONSULTING403/21/2026
M HASHAS203/21/2026
CJS EXPEDITING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHOENIX SUTTON STR INCGeneral Contractor707/08/2026
ALLPRO GENERAL CNTRTING CGeneral Contractor407/08/2026
PAWLEY INTERIOR CONTRACTINGGeneral Contractor403/21/2026
ROCKFISH CUSTOM BUILDERSGeneral Contractor303/21/2026
HITE CONSTRUCTION INCGeneral Contractor203/21/2026
ELPO ELECTRICAL CONTG INCElectrical203/22/2026
GEOMATRIX INST, INCGeneral Contractor107/08/2026
KURTI CONSTRUCTION CORPGeneral Contractor109/07/2026
MANHATTAN PROFESSIONALGeneral Contractor107/08/2026
PRESERV BLD RESTOR MGT INGeneral Contractor104/09/2026
TC BROWNE & CO., LLCGeneral Contractor104/09/2026
ABSOLUTE PLBG & HTG CORPPlumbing107/08/2026
ALAFOGIANNIS PLBG & HTGPlumbing107/08/2026
CBB PLUMBING CORPPlumbing107/03/2026
F1 MECHANICAL INCPlumbing109/07/2026
HI-TECH PLUMBING & HEATINGPlumbing107/08/2026
LEGACY PLUMBING & HTG LLCPlumbing106/27/2026
MASTER TECH PLUMBING LLCPlumbing106/28/2026
BRENDAN REILLYElectrical103/21/2026
PETER MICELI PLUMBINGPlumbing107/08/2026
INNOVATIVE ELEC. OF NY,INElectrical103/22/2026
K & G ELECTRIC CO., INC.Electrical103/22/2026
STEPHEN TATEElectrical103/21/2026
CORTLANDT CONTRACTING CORPGeneral Contractor107/08/2026
DOLA CONTRACTING CORPGeneral Contractor107/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHEN ENGINEERING SERVICES1826105/01/2026
SITE SAFETY LLC8555106/17/2025
MURRAY ENGINEERING PC1434106/17/2025
LAWRENCE V MCDONALD ARCHI6039203/04/2025
NORMAN C. LOK818101/12/2025
MW PROFESSIONAL ENGINEERI570203/25/2024
MIRELLA BOSELLI R.A.6330102/14/2024
MILROSE CONSULTANTS LLC2003207/11/2023
MALCOLM GOODSPEED, ARCHIT3384207/06/2022
MOTTOLA RINI ENGINEERS, P3251206/18/2021
Building Lifecycle
All (247)Filed (26)Permit Issued (26)Signed Off (11)Facade (FISP) (22)Violation (60)Inspection (21)Objection (51)Special Inspection (30)
09/01/2026
Permit issued — General Construction
M01440864-I1-GC
09/01/2026
Permit issued — Plumbing
M01440864-S1-PL
08/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/07/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/07/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/06/2026
Filed — Alteration
Interior renovation of existing apartment 5G. No change of use, egress, or occupancy under this application.
M01440864-I1
08/06/2026
Filed — Alteration
Interior renovation of existing apartment 5G. No change of use, egress, or occupancy under this application.
M01440864-S1
08/04/2026
Special inspection requirement — Energy Code Compliance Inspections
ANNA THORSDOTTIR
07/01/2026
Permit issued — Plumbing
M01345538-S1-PL
06/29/2026
Permit issued — General Construction
M01345538-I1-GC
05/31/2026
Objection resolved — Resolved
05/26/2026
Objection raised — Scope
05/26/2026
Objection raised — Admin
05/21/2026
Filed — Alteration
Construct ADA compliant barrier-free masonry entrance ramp. Remove existing steel entrance ramp.
M01319942-I1
05/11/2026
Objection resolved — Addressed
05/08/2026
Objection resolved — Addressed
05/08/2026
Objection resolved — Addressed
05/06/2026
Special inspection requirement — Lighting in dwelling units
LARA DANIEL
05/05/2026
Objection raised — Scope
05/05/2026
Objection raised — Inspections
05/05/2026
Objection raised — Scope
05/01/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING CLASS A APARTMENT AS PER PLANS FILED HEREWITH. INTERIOR NON-STRUCTURAL DEMOLITION, PARTITION WORK.NO CHANGE IN USE, EGRESS OR OCCUPANCY IS PROPOSED UNDER THIS APPLICATION.
M01345538-I1
05/01/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING CLASS A APARTMENT AS PER PLANS FILED HEREWITH. INTERIOR NON-STRUCTURAL DEMOLITION, PARTITION WORK.NO CHANGE IN USE, EGRESS OR OCCUPANCY IS PROPOSED UNDER THIS APPLICATION.
M01345538-S1
03/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/12/2026
Special inspection requirement — Masonry
03/09/2026
Signed off — Alteration
Install new plumbing fixtures in bathroom and kitchen as per plan. No change to use, egress or occupancy under this application.
M00980812-I1
03/09/2026
Special inspection requirement — Final
Malcolm Goodspeed
02/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
01/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/21/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/16/2026
Permit issued — General Construction
M01226561-I1-GC-CX
01/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HENLIA CHEN
01/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
LARA DANIEL
01/12/2026
Special inspection requirement — Final
LARA DANIEL
01/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/02/2026
Objection resolved — Addressed
12/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/09/2025
Objection raised — Scope
12/09/2025
Objection raised — Scope
12/09/2025
Objection raised — Scope
12/09/2025
Objection raised — Zoning
12/09/2025
Objection raised — Scope
11/10/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
10/20/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/02/2025
Permit issued — Plumbing
M01188940-I1-PL
09/30/2025
Permit issued — General Construction
M01170902-I1-GC-CX
08/25/2025
Filed — Alteration
INSTALLATION OF WASHER AND DRYER STACK AS SHOWN IN DRAWINGS SUBMITTED HEREIN.
M01226631-I1
07/15/2025
Objection resolved — Addressed
07/09/2025
Objection resolved — Addressed
07/02/2025
Objection raised — Scope
07/02/2025
Objection raised — Admin
06/17/2025
Filed — Alteration
Repairs to existing service ramp as per drawings. No change in use egress or occupancy is involved under this application.
M01226561-I1
06/10/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Robert Murray
05/15/2025
Special inspection requirement — Structural Steel - Details
Robert Murray
05/15/2025
Special inspection requirement — Post-installed Anchors
Robert Murray
05/15/2025
Special inspection requirement — Structural Steel - Welding
Robert Murray
05/15/2025
Special inspection requirement — Final
Sergio De Orbeta
05/15/2025
Special inspection requirement — Concrete - Cast-In-Place
Robert Murray
05/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
KHALID ALGENDE
Latest 60 of 247 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKURTI CONSTRUCTION CORP09/01/2026
DOB NOWPlumbingPermit IssuedF1 MECHANICAL INC09/01/2026
DOB NOWPlumbingPermit IssuedCBB PLUMBING CORP07/01/2026
DOB NOWGeneral ConstructionPermit IssuedDOLA CONTRACTING CORP06/29/2026
DOB NOWGeneral ConstructionPermit IssuedPRESERV BLD RESTOR MGT IN01/16/2026
DOB NOWPlumbingSigned-offLEGACY PLUMBING & HEATING10/02/2025
DOB NOWGeneral ConstructionPermit IssuedTC BROWNE & CO., LLC09/30/2025
DOB NOWPlumbingSigned-offMASTER TECH PLUMBING LLC04/01/2025
DOB NOWGeneral ConstructionPermit IssuedCORTLANDT CONTRACTING COR03/31/2025
DOB NOWPlumbingSigned-offPETER MICELI PLUMBING03/24/2025
DOB NOWGeneral ConstructionSigned-offROCKFISH CUSTOM BUILDERS03/17/2025
DOB NOWGeneral ConstructionSigned-offMANHATTAN PROFESSIONAL10/18/2024
DOB NOWGeneral ConstructionSigned-offALLPRO GENERAL CNTRTING C04/25/2024
DOB NOWGeneral ConstructionSigned-offALLPRO GENERAL CNTRTING C03/14/2024
DOB NOWPlumbingSigned-offABSOLUTE PLBG & HTG CORP03/11/2024
DOB NOWGeneral ConstructionSigned-offHITE CONSTRUCTION02/16/2024
DOB NOWPlumbingSigned-offHI-TECH PLUMBING & HEATIN07/26/2023
DOB NOWGeneral ConstructionSigned-offPAWLEY INTERIOR CONTRACTI07/14/2023
DOB NOWGeneral ConstructionSigned-offPAWLEY INTERIOR CONTRACTI06/13/2023
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC09/01/2022
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC09/02/2021
DOB NOWGeneral ConstructionPermit IssuedGEOMATRIX INST, INC08/12/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC05/19/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC05/22/2020
DOB NOWPlumbingSigned-offALAFOGIANNIS PLBG & HTG01/07/2020
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC05/24/2019
BISEQISSUEDPRESERV BLD RESTOR MGT IN12/09/2022
BISOTISSUEDPRESERV BLD RESTOR MGT IN06/22/2022
BISOTISSUEDPRESERV BLD RESTOR MGT IN04/01/2022
BISEQISSUEDPRESERV BLD RESTOR MGT IN11/29/2021
BISOTISSUEDPRESERV BLD RESTOR MGT IN03/12/2021
BISEQISSUEDPRESERV BLD RESTOR MGT IN11/28/2020
BISOTISSUEDPRESERV BLD RESTOR MGT IN09/14/2020
BISOTISSUEDHITE CONSTRUCTION INC03/12/2020
BISOTISSUEDPRESERV BLD RESTOR MGT IN10/09/2019
BISPLISSUEDMASTER 2 PLBG & HTG INC05/07/2019
BISPLISSUEDMASTER 2 PLBG & HTG INC05/07/2019
BISOTISSUEDTONED PAINTING & CONSTRUCTION03/05/2019
BISOTISSUEDTONED PAINTING & CONSTRUCTION03/05/2019
BISPLISSUEDMAGNUM PLUMBING & HEATING CORP.04/04/2018
+ 36 more permits on file
1 project · most recent 03/04/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/04/2025Permit IssuedTC BROWNE & CO., LLCVentilation Systems
Ventilation
5 projects · most recent 08/06/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/06/2026Permit IssuedF1 MECHANICAL INCGas, Water/Sanitary
05/01/2026Permit IssuedCBB PLUMBING CORPGas, Water/Sanitary
08/25/2025——Water/Sanitary
03/04/2025Signed-offLEGACY PLUMBING & HEATINGGas, Water/Sanitary
06/18/2021Signed-offPETER MICELI PLUMBINGGas, Water/Sanitary
19 projects · most recent 09/09/2026
General Wiring Lighting
FiledStatusContractorScope
09/09/2026Permit IssuedK.N.C ELECTRIC INCGeneral Wiring
10/06/2025CompleteETECH ELECTRICAL LLCGeneral Wiring
06/09/2025CompleteETECH ELECTRICAL LLCGeneral Wiring
04/07/2025Permit IssuedAMR ELEC'L CONTRG CORPGeneral Wiring
03/12/2025CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
10/11/2024CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
04/29/2024Permit IssuedK & G ELECTRIC CO., INCGeneral Wiring
04/10/2024CompleteCL ELECTRICAL CORPGeneral Wiring
02/28/2024CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
01/10/2024Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
10/02/2022Permit IssuedR.A. PHILLIPS ELEC'L CONTGeneral Wiring
08/16/2022Permit IssuedHYLAN DATACOM & ELECL LLC2 meters, 1 new_meters
10/01/2021CompleteINNOVATIVE ELEC. OF NY,INGeneral Wiring
04/19/2021CompleteCRESCO ELECTRICAL CORPGeneral Wiring
11/11/2020CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
1 project · most recent 06/17/2025
Steel
FiledStatusContractorScope
06/17/2025Permit IssuedPRESERV BLD RESTOR MGT INSteel
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
08/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/07/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/01/2026Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/09/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/10/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
10/20/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/31/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
08/04/2026Energy Code Compliance InspectionsANNA THORSDOTTIRprogress
05/06/2026Lighting in dwelling unitsLARA DANIELenergy_progress
03/12/2026Tenant Protection Plan Compliance—special
03/12/2026Masonry—special
03/09/2026FinalMalcolm Goodspeedprogress
01/15/2026Fire-Resistant Penetrations and JointsHENLIA CHENspecial
01/15/2026Fire-Resistance Rated ConstructionLARA DANIELprogress
01/12/2026FinalLARA DANIELprogress
06/10/2025Structural Steel - High Strength BoltingRobert Murrayspecial
05/15/2025Structural Steel - DetailsRobert Murrayspecial
05/15/2025Post-installed AnchorsRobert Murrayspecial
05/15/2025Structural Steel - WeldingRobert Murrayspecial
05/15/2025FinalSergio De Orbetaprogress
05/15/2025Concrete - Cast-In-PlaceRobert Murrayspecial
05/15/2025Tenant Protection Plan ComplianceKHALID ALGENDEspecial
03/03/2025Fire-Resistant Penetrations and JointsLawrence McDonaldspecial
03/03/2025Energy Code Compliance InspectionsLawrence McDonaldprogress
01/23/2025Mechanical SystemsLawrence McDonaldspecial
01/23/2025FinalLawrence McDonaldprogress
01/23/2025Interior lighting powerLawrence McDonaldenergy_progress
01/23/2025Ventilation and air distribution systemLawrence McDonaldenergy_progress
06/27/2024Post-installed AnchorsChristopher Drutjonsspecial
06/27/2024FinalArmand LeGardeurprogress
06/27/2024Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
03/25/2024Fire-Resistant Penetrations and JointsMING WAI WONGspecial
Latest 25 of 47.
▾Documents — 685 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch20
09/03/2026M00523357-I1Request digital key ↗
09/03/2026M00523418-I1Request digital key ↗
09/03/2026M00587706-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00256582-P1Request digital key ↗
08/15/2026M00256582-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00171884-I1Request digital key ↗
09/05/2026M00171884-P1Request digital key ↗
▸Applications & Permits140
▸BISPLAN / WORK APPROVAL APPLICATION72
01/12/2024123754856Open ↗
01/09/2024123754856Open ↗
11/28/2023123754856Open ↗
Showing 3 of 72 on file for this type
▸BISWORK PERMIT APPLICATION48
11/28/2020140984362Open ↗
03/13/2020123887295Open ↗
11/13/2019123887295Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWLPC Approval/Permit20
09/02/2026M00713520-I1Open ↗
08/27/2026M01002998-I1Open ↗
08/16/2026M01440864-I1Open ↗
Showing 3 of 20 on file for this type
▸Seals & Professional Certifications150
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION47
01/24/2020140832972Open ↗
01/24/2020140832972Open ↗
01/24/2020140832972Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/05/2026M00171884-P1Open ↗
09/05/2026M00171884-I1Open ↗
09/05/2026M00256582-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/23/2026M00851857-I1Open ↗
09/01/2026M00980812-I1Open ↗
09/01/2026M01319942-I1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
07/01/2019123763285Open ↗
07/01/2019123763285Open ↗
Showing 2 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/23/2026M00851857-I1Open ↗
08/29/2026M01345538-I1Open ↗
08/28/2026M01188940-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
11/25/2020140984362Open ↗
07/01/2019123763285Open ↗
03/04/2019140835041Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
11/25/2020140984362Open ↗
03/04/2019140835041Open ↗
03/04/2019140832972Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
11/25/2020140984362Open ↗
03/04/2019140835041Open ↗
03/04/2019140832972Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment56
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE20
10/22/2019140832972Open ↗
10/22/2019140835041Open ↗
10/22/2019140835041Open ↗
Showing 3 of 20 on file for this type
▸BISSELF-CERT PLUMBING NOTICE17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISSCHEDULE B - PLUMBING15
03/04/2019140835041Open ↗
03/04/2019140832972Open ↗
Showing 2 of 15 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection14
▸BISTENANT PROTECTION PLAN AND NOTES10
11/16/2022123754856Open ↗
03/04/2019140835041Open ↗
03/04/2019140832972Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWTenant Protection Plan2
08/15/2026M00256582-I1Open ↗
08/13/2026M00256582-P1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
11/28/2020140984362Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
04/29/2019123754856Open ↗
▸Environmental & Asbestos42
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
09/03/2026M00523357-I1Open ↗
09/02/2026M00713520-I1Open ↗
08/30/2026M00851857-P1Open ↗
Showing 3 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)15
11/06/2019123887295Open ↗
03/20/2019123754856Open ↗
03/04/2019140835041Open ↗
Showing 3 of 15 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance54
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS25
01/24/2020140832972Open ↗
01/24/2020140832972Open ↗
01/16/2020140835041Open ↗
Showing 3 of 25 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
01/24/2020140832972Open ↗
01/16/2020140835041Open ↗
01/16/2020140832972Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
03/04/2019140835041Open ↗
03/04/2019140832972Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
03/04/2019140835041Open ↗
03/04/2019140832972Open ↗
Showing 2 of 5 on file for this type
▸BISNYCECC ANALYSIS3
03/04/2019140835041Open ↗
03/04/2019140832972Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE1
03/20/2019123754856Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00523357-I1Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY20
02/05/2024123754856Open ↗
02/05/2024123754856Open ↗
01/30/2024123754856Open ↗
Showing 3 of 20 on file for this type
▸Approvals, Objections & Sign-offs50
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
02/09/2024123754856Open ↗
11/25/2020123887295Open ↗
01/24/2020140832972Open ↗
Showing 3 of 21 on file for this type
▸BISLANDMARKS APPROVAL14
11/25/2020140984362Open ↗
01/24/2020140832972Open ↗
01/16/2020140835041Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
04/29/2019123754856Open ↗
Showing 1 of 4 on file for this type
▸BISFINAL1
01/30/2024123754856Open ↗
▸BISLANDMARKS SIGNOFF1
01/31/2024123754856Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership50
▸BISCOST AFFIDAVIT45
01/12/2024123754856Open ↗
12/05/2023123754856Open ↗
11/27/2023123754856Open ↗
Showing 3 of 45 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/01/2024123754856Open ↗
▸Filing & Intake Forms66
▸BISADDITIONAL INFORMATION23
12/06/2023123754856Open ↗
12/07/2022123754856Open ↗
09/20/2021123763285Open ↗
Showing 3 of 23 on file for this type
▸BISBOROUGH INTAKE FORM18
01/24/2020140832972Open ↗
01/24/2020140832972Open ↗
01/16/2020140835041Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING COVER SHEET18
10/09/2019123887295Open ↗
07/01/2019123763285Open ↗
03/20/2019123754856Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
11/25/2020140984362Open ↗
03/04/2019140835041Open ↗
03/04/2019140832972Open ↗
Showing 3 of 7 on file for this type
▸Other Documents19
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
07/01/2019123763285Open ↗
03/02/2018140692061Open ↗
Showing 2 of 9 on file for this type
▸DOB NOWProof of Historic Building4
08/13/2026M00851857-I1Open ↗
08/13/2026M00851857-P1Open ↗
08/13/2026M00980812-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
07/19/2019123754856Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution2
09/05/2026M00171884-I1Open ↗
09/05/2026M00171884-P1Open ↗
▸BISUnknown1
11/12/2019123887295Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type