← Back
Two family converted from one family
391 2 STREET
BROOKLYN · BIN 3020848
💬 Discuss this project
1901Year Built
2Stories
B3Building Class
R6BZoning
3,195 sfGross Floor Area
2Units
Two family converted from one family · 1,750 sf lot · 1.83 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/27/2024$3.0M—— → —$923/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MAYERFELD ARCHITECTURE PLLC210/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PDG BUILDING CONSULTANTS LLC LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DESIGN 2 BUILD NEW YORK IGeneral Contractor407/08/2026
AP PLUMBING & HVAC LLCPlumbing107/08/2026
Building Lifecycle
All (12)Filed (2)Permit Issued (3)Signed Off (2)Inspection (2)Objection (2)Special Inspection (1)
04/01/2025
Signed off — Alteration
Interior alterations as per plans filed. No change in use, occupancy or egress.
B01117592-I1
03/31/2025
Signed off — Alteration
Interior alterations as per plans filed. No change in use, occupancy or egress.
B01117592-S1
03/06/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/07/2025
Permit issued — General Construction
B01117592-I1-GC
12/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/19/2024
Permit issued — Plumbing
B01117592-S1-PL
11/04/2024
Objection resolved — Addressed
10/29/2024
Permit issued — General Construction
B01117592-I1-GC
10/15/2024
Objection raised — Energy
10/08/2024
Filed — Alteration
Interior alterations as per plans filed. No change in use, occupancy or egress.
B01117592-I1
10/08/2024
Filed — Alteration
Interior alterations as per plans filed. No change in use, occupancy or egress.
B01117592-S1
09/26/2024
Special inspection requirement — Final
Shahrish Shuvo
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDESIGN 2 BUILD NEW YORK I02/07/2025
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG11/19/2024
DOB NOWGeneral ConstructionSigned-offDESIGN 2 BUILD NEW YORK I10/29/2024
1 project · most recent 01/08/2025
General Wiring
FiledStatusContractorScope
01/08/2025Permit IssuedLENS ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
09/26/2024FinalShahrish Shuvoprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026B01117592-S1Request digital key ↗
08/23/2026B01117592-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026B01117592-S1Open ↗
08/23/2026B01117592-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026B01117592-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026B01117592-S1Open ↗
08/23/2026B01117592-I1Open ↗