Church, synagogue, chapel · Owner of record: HHLA VENTURE I LLC · 900 sf lot · 3.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Roof21p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 416p · 1 filing · 20 docs
Floor 316p · 1 filing · 20 docs
Floor 217p · 2 filings · 20 docs
Floor 117p · 1 filing · 20 docs
Cellar20p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HHLA VENTURE I2807/08/2026
METHOD GENERAL CONTRACTOR103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/24/2022$1.3M—THE PEOPLES COMMUNITY TEMPLE INC. → HHLA VENTURE I LLC$432/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A.S.III DESIGN STUDIO810/01/2024
PAUL G. JONES, P.E.107/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PROFESSIONAL SOLUTIONS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METHOD GENERAL CONTRACTORGeneral Contractor807/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor204/09/2026
METHOD ELECTRIC LLCElectrical103/22/2026
F.S. WORKS INCFire Protection107/08/2026
CCS. CUSTOM CONSTRUCTIONGeneral Contractor104/09/2026
P.H. WORKS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE2050810/01/2024
Building Lifecycle
All (78)Filed (9)Permit Issued (11)Signed Off (4)Violation (5)Inspection (9)Objection (10)Special Inspection (30)
03/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/20/2025
Signed off — Alteration
REPLACE EXISTING WATER, WASTE, AND SEWER LINES. NEW PLUMBING FIXTURES IN KITCHENS AND BATHROOMS. INSTALL NEW WASHER/DRYER. INSTALL SPRINKLERS THROUGHOUT.
M00660980-I1
02/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/27/2025
Special inspection requirement — Metering
PAUL MARINO
01/27/2025
Special inspection requirement — Shutoff dampers
PAUL MARINO
01/27/2025
Special inspection requirement — Structural Steel - Details
PAUL MARINO
01/27/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
PAUL MARINO
01/27/2025
Special inspection requirement — Masonry
PAUL MARINO
01/27/2025
Special inspection requirement — Maintenance information
PAUL MARINO
01/27/2025
Special inspection requirement — Mechanical Systems
PAUL MARINO
01/27/2025
Special inspection requirement — Final
ALBERT SMITH III
01/27/2025
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
01/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
PAUL MARINO
01/27/2025
Special inspection requirement — Exterior lighting power
PAUL MARINO
01/27/2025
Special inspection requirement — Lighting controls
PAUL MARINO
01/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
01/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
01/27/2025
Special inspection requirement — Lighting in dwelling units
PAUL MARINO
01/27/2025
Special inspection requirement — Vestibules
PAUL MARINO
01/27/2025
Special inspection requirement — Insulation placement and R values
PAUL MARINO
01/27/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
01/27/2025
Special inspection requirement — Fenestration areas
PAUL MARINO
01/27/2025
Special inspection requirement — Fenestration air leakage
PAUL MARINO
01/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
PAUL MARINO
01/27/2025
Special inspection requirement — Duct leakage testing, insulation and design
PAUL MARINO
01/27/2025
Special inspection requirement — Air barrier - visual inspection
PAUL MARINO
01/27/2025
Special inspection requirement — Interior lighting power
PAUL MARINO
01/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL MARINO
01/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
01/14/2025
Objection resolved — Addressed
11/22/2024
Special inspection requirement — Fenestration areas
PAUL MARINO
11/22/2024
Special inspection requirement — Duct leakage testing, insulation and design
PAUL MARINO
11/22/2024
Special inspection requirement — Air barrier - visual inspection
PAUL MARINO
11/22/2024
Special inspection requirement — Fenestration air leakage
PAUL MARINO
10/10/2024
Objection raised — Energy
10/01/2024
Filed — Alteration CO
ALT-1 ALTERATION TO CHANGE USE AND OBTAIN NEW CERTIFICATE OF OCCUPANCY. CONVERT PROPERTY TO SINGLE FAMILY RESIDENCE. WORK SHALL INCLUDE NEW INTERIOR PARTITIONS AND VERTICAL ENLARGEMENT.
M00656289-P1
09/30/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
09/13/2024
Filed — Alteration
REPLACE EXISTING WATER, WASTE, AND SEWER LINES. NEW PLUMBING FIXTURES IN KITCHENS AND BATHROOMS. INSTALL NEW WASHER/DRYER. INSTALL SPRINKLERS THROUGHOUT.
M00660980-P3
08/20/2024
Signed off — Alteration
FILING TO REMOVE AND REPLACE DRY ROTTED, CRACKED, AND/OR EXCESSIVELY NOTCHED AND DEFLECTED WOOD BEAMS, AS WELL AS REMOVE THE BADLY DAMAGED AND UNSAFE WOOD STAIRS AND INSTALL A TEMPORARY CONSTRUCTION STAIR (CELLAR TO 3RD FL) TO ALLOW ACCESS.
M08035098-I1
08/16/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
08/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/22/2024
Filed — Alteration
REPLACE EXISTING WATER, WASTE, AND SEWER LINES. NEW PLUMBING FIXTURES IN KITCHENS AND BATHROOMS. INSTALL NEW WASHER/DRYER. INSTALL SPRINKLERS THROUGHOUT.
M00660980-P2
03/29/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/27/2024
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
M00900205-I1
03/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/23/2024
Permit issued — Structural
M08035098-I1-ST
02/20/2024
Permit issued — General Construction
M00656289-I1-GC-CX
02/08/2024
Permit issued — General Construction
M00656289-I1-GC-CX
01/11/2024
Permit issued — Plumbing
M00660980-I1-EW-SP
12/13/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/13/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/03/2023
Permit issued — Sprinklers
M00660980-I1-PL
09/01/2023
Violation issued (ECB, closed)
Construction
08/31/2023
Filed — Alteration
REPLACE EXISTING WATER, WASTE, AND SEWER LINES. NEW PLUMBING FIXTURES IN KITCHENS AND BATHROOMS. INSTALL NEW WASHER/DRYER. INSTALL SPRINKLERS THROUGHOUT.
M00660980-P1
07/10/2023
Permit issued — Supported Scaffold
M00900205-I1-SH
07/10/2023
Permit issued — Supported Scaffold
M00900205-I1-SF
07/07/2023
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
M00900205-I1
05/31/2023
Filed — Alteration
REPLACE EXISTING WATER, WASTE, AND SEWER LINES. NEW PLUMBING FIXTURES IN KITCHENS AND BATHROOMS. INSTALL NEW WASHER/DRYER. INSTALL SPRINKLERS THROUGHOUT.
M00660980-I1
05/16/2023
Permit issued — Structural
M00656289-I1-GC-CX
02/27/2023
Permit issued — Structural
M08035098-I1-ST
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offMETHOD GENERAL CONTRACTOR02/23/2024
DOB NOWGeneral ConstructionPermit IssuedMETHOD GENERAL CONTRACTOR02/20/2024
DOB NOWGeneral ConstructionPermit IssuedMETHOD GENERAL CONTRACTOR02/08/2024
DOB NOWPlumbingSigned-offF.S. WORKS INC01/11/2024
DOB NOWSprinklersSigned-offP.H. WORKS INC10/03/2023
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING07/10/2023
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING07/10/2023
DOB NOWStructuralPermit IssuedMETHOD GENERAL CONTRACTOR05/16/2023
DOB NOWStructuralSigned-offMETHOD GENERAL CONTRACTOR02/27/2023
DOB NOWStructuralSigned-offMETHOD GENERAL CONTRACTOR12/08/2022
DOB NOWGeneral ConstructionSigned-offCCS. CUSTOM CONSTRUCTION07/25/2022
1 project · most recent 10/01/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/01/2024Permit IssuedMETHOD GENERAL CONTRACTORHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MLZ-KP09NA2 9,000 BTU · Fan Coil Indoor ×16
1 project · most recent 09/03/2024
General Wiring
FiledStatusContractorScope
09/03/2024CompleteMETHOD ELECTRIC LLCGeneral Wiring
1 project · most recent 10/01/2024
Steel Masonry Wood
FiledStatusContractorScope
10/01/2024Permit IssuedMETHOD GENERAL CONTRACTORSteel, Masonry, Wood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/30/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
08/16/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
08/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2023Pass-Final PL - UndergroundPassView ↗
11/13/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
01/27/2025Mechanical SystemsPAUL MARINOspecial
01/27/2025Energy Code Compliance InspectionsPAUL MARINOprogress
01/27/2025Fire-Resistance Rated ConstructionPAUL MARINOprogress
01/27/2025HVAC-R and service water piping design and insulationPAUL MARINOenergy_progress
01/27/2025HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
01/27/2025Shutoff dampersPAUL MARINOenergy_progress
01/27/2025Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
01/27/2025Structural Steel - DetailsPAUL MARINOspecial
01/27/2025Construction Operations Influencing Adjacent StructuresPAUL MARINOspecial
01/27/2025MasonryPAUL MARINOspecial
01/27/2025Fire-Resistant Penetrations and JointsPAUL MARINOspecial
01/27/2025FinalALBERT SMITH IIIprogress
01/27/2025Exterior lighting powerPAUL MARINOenergy_progress
01/27/2025Lighting controlsPAUL MARINOenergy_progress
01/27/2025Maintenance informationPAUL MARINOenergy_progress
01/27/2025MeteringPAUL MARINOenergy_progress
01/27/2025Lighting in dwelling unitsPAUL MARINOenergy_progress
01/27/2025VestibulesPAUL MARINOenergy_progress
01/27/2025Insulation placement and R valuesPAUL MARINOenergy_progress
01/27/2025Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
01/27/2025Fenestration areasPAUL MARINOenergy_progress
01/27/2025Fenestration air leakagePAUL MARINOenergy_progress
01/27/2025HVAC-R and service water heating system controlsPAUL MARINOenergy_progress
01/27/2025Duct leakage testing, insulation and designPAUL MARINOenergy_progress
01/27/2025Air barrier - visual inspectionPAUL MARINOenergy_progress
Latest 25 of 81.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/02/2026M00707256-I1Request digital key ↗
09/01/2026M08035098-I1Request digital key ↗
08/30/2026M00900205-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026M00656289-P1Open ↗
08/13/2026M00656289-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00656289-I1Open ↗
▸Seals & Professional Certifications64
▸DOB NOWProgress Inspector Seal & Signature36
09/01/2026M00656289-I1Open ↗
09/01/2026M00656289-I1Open ↗
09/01/2026M00656289-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/01/2026M00656289-I1Open ↗
09/01/2026M00656289-I1Open ↗
09/01/2026M00656289-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026M08035098-I1Open ↗
08/30/2026M00900205-I1Open ↗
08/26/2026M00660980-P3Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026M00656289-P1Open ↗
08/13/2026M00656289-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/26/2026M00660980-I1Open ↗
08/15/2026M00656289-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026M08035098-I1Open ↗
08/13/2026M00707256-I1Open ↗
▸Other Documents10
▸DOB NOWProperty Ownership Certification2
08/15/2026M00656289-I1Open ↗
08/14/2026M00656289-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026M00656289-P1Open ↗
08/13/2026M00656289-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026M00656289-P1Open ↗
08/13/2026M00656289-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026M00656289-P1Open ↗
08/13/2026M00656289-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026M00656289-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026M00656289-I1Open ↗