DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB04/23/1993V-DOB VIOLATION - ACTIVE
ECB08/22/2023WORK WITHOUT PERMIT. OBSERVED A STRUCTURE BUILT APPROX. 50'LX25'WX15'H THEREFORE PERMIT REQUIRED. ONLY TEMPORARY STRUCTURES UNDER 400 SQFT AND ASSEMBLED FOR LESS THEN 30 DAYS ARE ALLOWED TO BE BUILT WITHOUT PERNothing owed — awaiting certificate of correction
Church, synagogue, chapel · 22,760 sf lot · 0.1 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.