← Back
BuildNYC
Two stories - detached, small or mid-size
3916 KINGS HIGHWAY
BROOKLYN · Flatlands · BIN 3217226
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R5Zoning
2,796 sfGross Floor Area
1Units
1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: Lifespire · 8,680 sf lot · 0.32 FAR built · Flood zone X500
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarBoiler and water heater replacement4p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Lifespire1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kems Engineering and Construction201/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Lewsan Consulting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tavella Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781201/14/2022
Building Lifecycle
All (15)Filed (2)Permit Issued (1)Violation (1)Inspection (4)Special Inspection (7)
03/01/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/28/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/23/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
01/19/2022
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
01/19/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
01/19/2022
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
01/19/2022
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
01/19/2022
Special inspection requirement — Permanent certificate
Steven Bendoraitis
01/19/2022
Special inspection requirement — Maintenance information
Steven Bendoraitis
01/14/2022
Filed — Alteration
Replace gas-fired boiler and two (2) gas fired water heaters. Register one (1) dryer. Perform corrective work to comply with ECB violation 32052578J.
B00623397-P1
12/01/2021
Permit issued — Plumbing
B00623397-I1-PL
11/24/2021
Filed — Alteration
Replace gas-fired boiler and two (2) gas fired water heaters. Register one (1) dryer. Perform corrective work to comply with ECB violation 32052578J.
B00623397-I1
09/18/2007
Violation issued (ECB, open)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTavella Plumbing & Heating12/01/2021
BISPLISSUEDTower Plumbing & Heating06/23/2010
1 project · most recent 01/14/2022
Gas
FiledStatusContractorScope
01/14/2022Signed-offTavella Plumbing & HeatingGas
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/23/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
01/19/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/19/2022Energy Code Compliance InspectionsSteven Bendoraitisprogress
01/19/2022HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
01/19/2022HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
01/19/2022HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
01/19/2022Permanent certificateSteven Bendoraitisenergy_progress
01/19/2022Maintenance informationSteven Bendoraitisenergy_progress
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/31/2026B00623397-P1Request digital key ↗
08/31/2026B00623397-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
11/01/2010320164362Open ↗
09/27/2010320164353Open ↗
05/11/2010320164353Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
06/23/2010320164362Open ↗
05/21/2010320164362Open ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026B00623397-I1Open ↗
08/31/2026B00623397-I1Open ↗
08/31/2026B00623397-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
02/28/2011320164362Open ↗
05/11/2010320164353Open ↗
05/11/2010320164362Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/31/2026B00623397-P1Open ↗
08/31/2026B00623397-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026B00623397-I1Open ↗
▸Trade Schedules & Equipment9
▸BISSELF-CERT PLUMBING NOTICE7
01/24/2011320164362Open ↗
12/29/2010320164362Open ↗
12/10/2010320164362Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING2
11/01/2010320164362Open ↗
05/11/2010320164362Open ↗
▸Environmental & Asbestos5
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
05/24/2010320164362Open ↗
05/11/2010320164353Open ↗
05/11/2010320164362Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/31/2026B00623397-P1Open ↗
08/31/2026B00623397-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
05/11/2010320164353Open ↗
05/11/2010320164362Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/28/2011320164362Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
02/28/2011320164362Open ↗
05/11/2010320164353Open ↗
05/11/2010320164362Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
05/11/2010320164353Open ↗
05/11/2010320164362Open ↗