← Back
BuildNYC
Primarily 2 family with 1 store or office
392 5TH AVENUE
BROOKLYN · Park Slope · BIN 3021602
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R6AZoning
2,640 sfGross Floor Area
3Units
Rent Stabilized3 Active Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 392 Fifth BK · 2,037 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRestaurant Parkslop1p · 1 filing · 20 docs
Floor 3Floor leveling after demolition1p · 1 filing · 5 docs
Floor 2Floor leveling after demolition1p · 1 filing · 5 docs
Floor 1Restaurant Parkslop14p · 1 filing · 20 docs
CellarRestaurant Parkslop16p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HH Realty Equities2210/04/2026
392 5th Ave203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/31/2024$2.7M—— → —$1,013/sf building
02/07/2023$2.1M—— → —$795/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bitopi Consultants109/17/2026
QWA Studio812/05/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Chef Creative OfficeGeneral Contractor303/21/2026
Johnson RaymondElectrical103/21/2026
Elmac ElectricElectrical103/21/2026
Spirit AcquisitionsGeneral Contractor109/26/2026
Watson's Plumbing, Heating, & BuildingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bitopi Consultants7036109/17/2026
Qwa Studio9293812/05/2024
Building Lifecycle
All (55)Filed (9)Permit Issued (3)Signed Off (3)Violation (7)Inspection (6)Special Inspection (27)
10/01/2026
Signed off — Alteration
INSTALL NEW MINI-SPLIT HVAC UNITS ON THE 2ND AND 3RD FLOOR RESIDENTIAL SPACES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01439768-I1
09/25/2026
Permit issued — Mechanical Systems
B01439768-I1-MS
09/17/2026
Filed — Alteration
INSTALL NEW MINI-SPLIT HVAC UNITS ON THE 2ND AND 3RD FLOOR RESIDENTIAL SPACES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01439768-I1
09/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
KAMRUL AHSAN
08/02/2026
Special inspection requirement — Final
KAMRUL AHSAN
08/02/2026
Special inspection requirement — Mechanical Systems
KAMRUL AHSAN
11/24/2025
Violation issued (HPD, closed)
I
01/06/2025
Signed off — Alteration
INTERIOR RENOVATION OF EXIST. RESTAURANT. WORK INCLUDES HVAC, PLUMBING, KITCHEN EQUIPMENT INSTALLATION, KITCHEN HOOD, AND HOOD FIRE SUPPRESSION SYSTEM. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY.
B01029188-S1
12/05/2024
Filed — Alteration
INTERIOR RENOVATION OF EXIST. RESTAURANT. WORK INCLUDES HVAC, PLUMBING, KITCHEN EQUIPMENT INSTALLATION, KITCHEN HOOD, AND HOOD FIRE SUPPRESSION SYSTEM. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY.
B01029188-P6
11/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kun Wu
11/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Kun Wu
10/28/2024
Filed — Alteration
INTERIOR RENOVATION OF EXIST. RESTAURANT. WORK INCLUDES HVAC, PLUMBING, KITCHEN EQUIPMENT INSTALLATION, KITCHEN HOOD, AND HOOD FIRE SUPPRESSION SYSTEM. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY.
B01029188-P5
10/24/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/24/2024
Special inspection requirement — Energy Code Compliance Inspections
Kun Wu
10/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kun Wu
10/23/2024
Signed off — Alteration
INTERIOR RENOVATION OF EXIST. RESTAURANT. WORK INCLUDES HVAC, PLUMBING, KITCHEN EQUIPMENT INSTALLATION, KITCHEN HOOD, AND HOOD FIRE SUPPRESSION SYSTEM. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY.
B01029188-I1
10/15/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/06/2024
Special inspection requirement — Mechanical Systems
Kun Wu
10/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
Kun Wu
10/06/2024
Special inspection requirement — Energy Code Compliance Inspections
Kun Wu
10/06/2024
Special inspection requirement — Final
Kun Wu
10/06/2024
Special inspection requirement — Fire-Resistance Rated Construction
Kun Wu
10/02/2024
Filed — Alteration
INTERIOR RENOVATION OF EXIST. RESTAURANT. WORK INCLUDES HVAC, PLUMBING, KITCHEN EQUIPMENT INSTALLATION, KITCHEN HOOD, AND HOOD FIRE SUPPRESSION SYSTEM. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY.
B01029188-P4
10/02/2024
Filed — Alteration
INTERIOR RENOVATION OF EXIST. RESTAURANT. WORK INCLUDES HVAC, PLUMBING, KITCHEN EQUIPMENT INSTALLATION, KITCHEN HOOD, AND HOOD FIRE SUPPRESSION SYSTEM. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY.
B01029188-P3
10/02/2024
Special inspection requirement — Tenant Protection Plan Compliance
Kun Wu
10/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Kun Wu
10/02/2024
Special inspection requirement — Final
Kun Wu
10/02/2024
Special inspection requirement — Fire-Resistance Rated Construction
Kun Wu
10/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kun Wu
10/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Kun Wu
10/02/2024
Special inspection requirement — Mechanical Systems
Kun Wu
07/25/2024
Filed — Alteration
INTERIOR RENOVATION OF EXIST. RESTAURANT. WORK INCLUDES HVAC, PLUMBING, KITCHEN EQUIPMENT INSTALLATION, KITCHEN HOOD, AND HOOD FIRE SUPPRESSION SYSTEM. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY.
B01029188-P2
07/25/2024
Filed — Alteration
INTERIOR RENOVATION OF EXIST. RESTAURANT. WORK INCLUDES HVAC, PLUMBING, KITCHEN EQUIPMENT INSTALLATION, KITCHEN HOOD, AND HOOD FIRE SUPPRESSION SYSTEM. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY.
B01029188-P1
07/18/2024
Special inspection requirement — Final
Kun Wu
07/18/2024
Special inspection requirement — Mechanical Systems
Kun Wu
07/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
Matthew Rauch
07/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
07/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
07/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
07/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Kun Wu
07/18/2024
Special inspection requirement — Tenant Protection Plan Compliance
Kun Wu
06/28/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/28/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/28/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/23/2024
Permit issued — Plumbing
B01029188-S1-PL
04/30/2024
Permit issued — General Construction
B01029188-I1-GC
04/15/2024
Filed — Alteration
INTERIOR RENOVATION OF EXIST. RESTAURANT. WORK INCLUDES HVAC, PLUMBING, KITCHEN EQUIPMENT INSTALLATION, KITCHEN HOOD, AND HOOD FIRE SUPPRESSION SYSTEM. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY.
B01029188-S1
04/15/2024
Filed — Alteration
INTERIOR RENOVATION OF EXIST. RESTAURANT. WORK INCLUDES HVAC, PLUMBING, KITCHEN EQUIPMENT INSTALLATION, KITCHEN HOOD, AND HOOD FIRE SUPPRESSION SYSTEM. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY.
B01029188-I1
09/26/2018
Violation issued (FDNY_NOV, closed)
12/16/2006
Violation issued (HPD, open)
B
02/12/2004
Violation issued (HPD, open)
B
02/12/2004
Violation issued (HPD, open)
B
06/14/1999
Violation issued (ECB, closed)
Construction
05/13/1996
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSpirit Acquisitions09/25/2026
DOB NOWPlumbingSigned-offWatson's Plumbing, Heating, & Building05/23/2024
DOB NOWGeneral ConstructionSigned-offChef Creative Office04/30/2024
BISMHISSUEDMaster Fire Mechanical02/16/2017
BISOTISSUEDDavid Turner Architect12/26/2000
BISFPISSUEDIdeal Fire Control07/23/1999
BISFPISSUEDIdeal Fire Control08/20/1998
1 project · most recent 09/17/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/17/2026Signed-offSpirit AcquisitionsHeating and Air Conditioning Systems
Heat / Cool
Gree 4LIV05HP230V1AH, 4LIV05HP230V1AH, 4LIV05HP230V1AH 6,000 BTU ×6
4LIV12HP230V1AH 12,000 BTU · Fan Coil Indoor ×2
MULTI36HP230V1EO, MULTI36HP230V1EO 36,000 BTU ×2
1 project · most recent 10/28/2024
FiledStatusContractorScope
10/28/2024CompleteRoney Electric4 meters
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/15/2024Pass-Final General Construction Non-Directive 14PassView ↗
10/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/28/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/28/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
09/11/2026Tenant Protection Plan ComplianceKAMRUL AHSANspecial
08/02/2026FinalKAMRUL AHSANprogress
08/02/2026Mechanical SystemsKAMRUL AHSANspecial
11/26/2024Fire-Resistant Penetrations and JointsKun Wuspecial
11/26/2024Energy Code Compliance InspectionsKun Wuprogress
10/24/2024Energy Code Compliance InspectionsKun Wuprogress
10/24/2024Fire-Resistant Penetrations and JointsKun Wuspecial
10/06/2024Mechanical SystemsKun Wuspecial
10/06/2024Tenant Protection Plan ComplianceKun Wuspecial
10/06/2024Energy Code Compliance InspectionsKun Wuprogress
10/06/2024FinalKun Wuprogress
10/06/2024Fire-Resistance Rated ConstructionKun Wuprogress
10/02/2024Tenant Protection Plan ComplianceKun Wuspecial
10/02/2024Energy Code Compliance InspectionsKun Wuprogress
10/02/2024FinalKun Wuprogress
10/02/2024Fire-Resistance Rated ConstructionKun Wuprogress
10/02/2024Fire-Resistant Penetrations and JointsKun Wuspecial
10/02/2024Energy Code Compliance InspectionsKun Wuprogress
10/02/2024Mechanical SystemsKun Wuspecial
07/18/2024FinalKun Wuprogress
07/18/2024Mechanical SystemsKun Wuspecial
07/18/2024Fire-Resistance Rated ConstructionMatthew Rauchprogress
07/18/2024HVAC-R and service water heating equipment—energy_progress
07/18/2024HVAC-R and service water heating system controls—energy_progress
07/18/2024HVAC-R and service water piping design and insulation—energy_progress
Latest 25 of 27.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Restaurant ParkslopRestaurant / Food ServiceCellar, Floor 1
Project B01029188 Alteration · LOC Issued · 04/15/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026B01029188-S1Request digital key ↗
08/23/2026B01029188-P1Request digital key ↗
08/23/2026B01029188-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
02/17/2017321528405Open ↗
▸BISWORK PERMIT APPLICATION1
02/17/2017321528405Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026B01029188-P5Open ↗
08/29/2026B01029188-P3Open ↗
08/29/2026B01029188-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026B01029188-P5Open ↗
08/29/2026B01029188-P3Open ↗
08/29/2026B01029188-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026B01029188-S1Open ↗
08/23/2026B01029188-I1Open ↗
08/23/2026B01029188-P5Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/17/2017321528405Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/17/2017321528405Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/17/2017321528405Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/23/2026B01029188-S1Open ↗
08/23/2026B01029188-I1Open ↗
08/23/2026B01029188-P5Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/17/2017321528405Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
02/17/2017321528405Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
02/17/2017321528405Open ↗