← Back
Two stories - detached, small or mid-size
392 ARBUTUS AVENUE
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5082311
💬 Discuss this project
1965Year Built
2Stories
A1Building Class
R1-2Zoning
4,088 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 7,414 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
Architecture
Floor 31p · 1 filing · 14 docs
Floor 21p · 1 filing · 14 docs
Floor 13p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAMBUSA CONSTRUCTION403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE209/17/2024
Building Lifecycle
All (27)Filed (2)Violation (2)Special Inspection (23)
03/31/2025
Special inspection requirement — Air barrier — testing
03/31/2025
Special inspection requirement — Air barrier - visual inspection
03/31/2025
Special inspection requirement — Electric vehicle service equipment requirements
03/31/2025
Special inspection requirement — Ventilation and air distribution system
09/17/2024
Filed — Alteration CO
APPLICATION IS FILED FOR NEW 3RD STORY VERTICAL ENLARGEMENT TO AN EXISTING ONE FAMILY, 2 STORY RESIDENCE AND INTERIOR RENOVATION. ALSO INCLUDES WORK AT REAR YARD. APP IS FILED TO OBTAIN NEW CO. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S00932577-I1
09/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
09/13/2023
Special inspection requirement — Interior lighting power
09/12/2023
Special inspection requirement — Energy Code Compliance Inspections
09/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
09/12/2023
Special inspection requirement — Fenestration air leakage
09/12/2023
Special inspection requirement — Mechanical Systems
09/12/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
09/12/2023
Special inspection requirement — Duct leakage testing, insulation and design
09/12/2023
Special inspection requirement — HVAC-R and service water heating equipment
09/12/2023
Special inspection requirement — Permanent certificate
09/12/2023
Special inspection requirement — HVAC-R and service water heating system controls
09/12/2023
Special inspection requirement — Insulation placement and R values
09/12/2023
Special inspection requirement — Fenestration areas
09/12/2023
Special inspection requirement — Maintenance information
09/12/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
09/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/12/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/12/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
09/12/2023
Special inspection requirement — Final
07/13/2022
Filed — Alteration
S00771599-I1
09/08/2020
Violation issued (ECB, open)
Construction
01/25/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—ISSUEDSAMBUCA CONSTRUCTION CORP.04/17/2009
BISPLISSUEDJFR CONSTRUCTION CORP10/09/2008
BIS—ISSUEDSAMBUCA CONSTRUCTION CORP.03/19/2008
BISPLISSUEDALL RITE PLBG & HTG INC08/28/2007
1 project · most recent 09/17/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/17/2024——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Ventilation
1 project · most recent 09/17/2024
Wood
FiledStatusContractorScope
09/17/2024——Wood
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
03/31/2025Air barrier — testing —energy_progress
03/31/2025Air barrier - visual inspection—energy_progress
03/31/2025Electric vehicle service equipment requirements—energy_progress
03/31/2025Ventilation and air distribution system—energy_progress
09/13/2023HVAC-R and service water piping design and insulation—energy_progress
09/13/2023Interior lighting power—energy_progress
09/12/2023Energy Code Compliance Inspections—progress
09/12/2023Fire-Resistance Rated Construction—progress
09/12/2023Fenestration air leakage—energy_progress
09/12/2023Mechanical Systems—special
09/12/2023Fenestration and door U-factor and product ratings—energy_progress
09/12/2023Duct leakage testing, insulation and design—energy_progress
09/12/2023HVAC-R and service water heating equipment—energy_progress
09/12/2023Permanent certificate—energy_progress
09/12/2023HVAC-R and service water heating system controls—energy_progress
09/12/2023Insulation placement and R values—energy_progress
09/12/2023Fenestration areas—energy_progress
09/12/2023Maintenance information—energy_progress
09/12/2023Exterior Insulation and Finish Systems (EIFS)—special
09/12/2023Fire-Resistant Penetrations and Joints—special
09/12/2023Structural Stability – Alterations of existing buildings—special
09/12/2023Subsurface Investigations (Borings/Test Pits)—special
09/12/2023Final—progress
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026S00771599-I1Request digital key ↗
08/21/2026S00932577-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION4
11/14/2025540235707Open ↗
09/14/2023540235707Open ↗
08/19/2008510001285Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
09/08/2023540235707Open ↗
09/12/2008510001285Open ↗
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb1
07/02/2008510001285Open ↗
▸BISBPP-DOT: SIDEWALK-CURB-ROAD WORK PERMITS1
08/28/2009510001285Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00932577-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00932577-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00932577-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026S00771599-I1Open ↗
08/13/2026S00932577-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00932577-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00932577-I1Open ↗
▸Environmental & Asbestos2
▸BISASB4 - ASBESTOS EXEMPTION CERTIFICATION LETTER1
05/09/2007510001285Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S00932577-I1Open ↗
▸Inspections & Test Reports4
▸BISBPP-9 - Request for Builders Pavement Field Inspection2
09/08/2023540235707Open ↗
09/12/2008510001285Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00932577-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00932577-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
09/08/2023540235707Open ↗
09/12/2008510001285Open ↗
▸BISLetter from Homeowner for Withdrawal1
11/14/2025540235707Open ↗
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
09/08/2023540235707Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP: ENGINEERS AFFIDAVIT1
08/28/2009510001285Open ↗
▸Filing & Intake Forms1
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/10/2007510001285Open ↗
▸Other Documents9
▸BISBPP - SUPPORTING DOCUMENTATION3
09/12/2008510001285Open ↗
05/10/2007510001285Open ↗
05/10/2007510001285Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/28/2009510001285Open ↗
▸BISNYS DEC FRESHWATER WETLANDS MAP1
09/08/2023540235707Open ↗
▸DOB NOWPlot Diagram1
08/13/2026S00932577-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S00932577-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00932577-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00932577-I1Open ↗