← Back
Predominantly retail with other uses
392 GATES AVENUE
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3338679
💬 Discuss this project
1931Year Built
3Stories
K4Building Class
R6AZoning
5,125 sfGross Floor Area
6Units
Rent Stabilized356 Open Violations 352 unresolved · 4 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · 2,500 sf lot · 2.05 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 3 docs
Floor 38p · 2 filings · 11 docs
Floor 27p · 2 filings · 11 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMEER DELI CORP203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BANGASH ASSOCIATES INC.201/06/2025
AZ PROFESSIONAL ENGINEERING PC103/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SHEIKH EXPEDITING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREAT AMERICAN CONSTR SERGeneral Contractor303/21/2026
VERE ELECTRIC CORP.Electrical203/22/2026
Building Lifecycle
All (76)Filed (3)Permit Issued (1)Violation (60)Objection (8)Special Inspection (4)
11/24/2025
Violation issued (HPD, open)
I
01/09/2025
Special inspection requirement — Final
FAZAL BANGASH
01/06/2025
Filed — Alteration
APPLICATION FILE TO INTERIOR RENOVATION CEILING/ WALL FINISHES, WINDOWS, MINOR ROOF WITH BULKHEAD REPAIR DUE TO FIRE DAMAGED AT ADJACENT PROPERTY 394 GATES AVE AS PER PLAN. REMOVE DOB VIOLATION# FEU30305PN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS
B00748634-P1
01/03/2025
Special inspection requirement — Final
FAZAL BANGASH
12/04/2024
Violation issued (HPD, open)
I
11/28/2023
Violation issued (HPD, open)
I
11/17/2022
Violation issued (HPD, open)
I
06/16/2022
Permit issued — General Construction
B00748634-I1-GC
06/08/2022
Filed — Alteration
APPLICATION FILE TO INTERIOR RENOVATION CEILING/ WALL FINISHES, WINDOWS, MINOR ROOF WITH BULKHEAD REPAIR DUE TO FIRE DAMAGED AT ADJACENT PROPERTY 394 GATES AVE AS PER PLAN. REMOVE DOB VIOLATION# FEU30305PN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS
B00748634-I1
04/08/2022
Objection raised — Scope
04/08/2022
Objection resolved — Resolved
04/08/2022
Objection raised — Scope
04/08/2022
Objection resolved — Resolved
04/08/2022
Objection raised — Scope
04/08/2022
Objection resolved — Resolved
03/30/2022
Objection raised — Scope
03/30/2022
Objection resolved — Resolved
03/27/2022
Filed — Alteration
APPLICATION FILE TO INTERIOR RENOVATION CEILING/ WALL FINISHES, WINDOWS, MINOR ROOF WITH BULKHEAD REPAIR DUE TO FIRE DAMAGED AT ADJACENT PROPERTY 394 GATES AVENUE. (2nd STORY OF 2 STORY BLDG. AND 3rd UNIT OF 3 STORY BLDG.) NO CHANGE IN USE, EGRESS OR O
B00694366-I1
03/18/2022
Violation issued (HPD, open)
I
03/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/09/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/08/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/07/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/22/2021
Violation issued (HPD, open)
I
07/22/2020
Violation issued (FDNY_NOV, closed)
11/08/2019
Violation issued (HPD, open)
I
06/05/2019
Violation issued (FDNY_ORDER, closed)
06/05/2019
Violation issued (FDNY_ORDER, closed)
01/14/2019
Violation issued (FDNY_NOV, closed)
04/29/2015
Violation issued (FDNY_ORDER, closed)
05/29/2013
Violation issued (FDNY_NOV, closed)
03/08/2012
Violation issued (FDNY_NOV, closed)
03/07/2012
Violation issued (FDNY_NOV, closed)
06/21/2011
Violation issued (HPD, closed)
A
06/21/2011
Violation issued (HPD, closed)
A
07/19/2010
Violation issued (FDNY_NOV, closed)
07/19/2010
Violation issued (FDNY_NOV, closed)
02/11/2005
Violation issued (HPD, open)
A
02/11/2005
Violation issued (HPD, open)
B
02/11/2005
Violation issued (HPD, open)
B
02/11/2005
Violation issued (HPD, open)
A
02/11/2005
Violation issued (HPD, closed)
C
02/11/2005
Violation issued (HPD, open)
B
02/11/2005
Violation issued (HPD, open)
B
02/11/2005
Violation issued (HPD, open)
B
02/11/2005
Violation issued (HPD, open)
B
02/11/2005
Violation issued (HPD, open)
B
02/11/2005
Violation issued (HPD, open)
C
02/11/2005
Violation issued (HPD, closed)
A
02/11/2005
Violation issued (HPD, open)
B
02/11/2005
Violation issued (HPD, open)
B
02/11/2005
Violation issued (HPD, open)
A
02/11/2005
Violation issued (HPD, open)
B
02/11/2005
Violation issued (HPD, open)
B
02/11/2005
Violation issued (HPD, open)
B
02/11/2005
Violation issued (HPD, closed)
A
02/11/2005
Violation issued (HPD, closed)
A
02/11/2005
Violation issued (HPD, closed)
A
02/11/2005
Violation issued (HPD, closed)
C
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGREAT AMERICAN CONSTR SER06/16/2022
BISFPISSUEDIDEAL FIRE CONTROL03/30/1995
BISPLISSUEDSALVATORE A ESPOSITO & HEATING12/13/1994
BISMHISSUEDCHRIS STOREFRONTS INC12/01/1994
1 project · most recent 06/27/2023
General Wiring
FiledStatusContractorScope
06/27/2023Permit IssuedVERE ELECTRIC CORP.General Wiring
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
01/09/2025FinalFAZAL BANGASHprogress
01/03/2025FinalFAZAL BANGASHprogress
03/09/2022Fire-Resistant Penetrations and Joints—special
03/09/2022Structural Stability – Alterations of existing buildings—special
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/23/2026B00748634-I1Request digital key ↗
08/23/2026B00748634-P1Request digital key ↗
08/15/2026B00694366-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026B00748634-I1Open ↗
08/13/2026B00748634-P1Open ↗
08/13/2026B00694366-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/22/2026B00748634-P1Open ↗
08/26/2026B00748634-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026B00748634-I1Open ↗
08/13/2026B00694366-I1Open ↗
08/13/2026B00748634-P1Open ↗