← Back
Elevator apt, fireproof with stores
The 394 Mother Gaston Boulevard Condominium
394-402 MOTHER GASTON BLVD · Brownsville · BIN 3428912
💬 Discuss this project
2023Year Built
13Stories
D6Building Class
—Zoning
102,491 sfGross Floor Area
64Units
LL97 CoveredRent Stabilized1 Open Violation ▸FDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 394 MOTHER GASTON LLC · 10,000 sf lot · 10.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof2 filings · 1 doc
Floor 91 filing · 1 doc
Floor 8
Floor 7
Floor 6
Floor 5
Floor 41 filing · 1 doc
Floor 3
Floor 2
Floor 11 filing · 1 doc
Mezzanine1 filing · 1 doc
Site & exterior3 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOT DEVELOPERS3307/08/2026
OWNERS REP1907/08/2026
394 MOTHER GASTON1703/21/2026
INTERNATIONAL CONCRETE407/08/2026
DORIA407/08/2026
LM DEVELOPMENTS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SPEEDY EXPEDITING3003/21/2026
AE DESIGN SOLUTION1803/21/2026
HOWARD I SHAPIRO ASSOCIATES403/21/2026
LOMBARDO BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor1907/08/2026
UPSTRATE INCGeneral Contractor1107/08/2026
PRIME PIPING & HEATING INFire Protection607/08/2026
INTERNATIONAL CONCRETE C*General Contractor407/08/2026
STRUCTURELINE INCGeneral Contractor307/08/2026
SAFETY FIRE SPRINKLER CORPFire Protection207/08/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
HIVOLTS ELECTRICAL INC 004090General Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA9168711/26/2024
SKYLINE RIGGING7880112/27/2023
BIG APPLE GROUP NY, LLC1258205/27/2020
Building Lifecycle
All (138)Filed (28)Permit Issued (29)Signed Off (14)Violation (11)Inspection (14)Objection (12)Special Inspection (27)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
04/17/2026
Signed off — Alteration
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH NB # 321590382
B00347852-I1
12/29/2025
Violation issued (FDNY_NOV, closed)
05/20/2025
Signed off — Alteration
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH NB # 321590382.
B00347841-I1
04/29/2025
Signed off — Alteration
SPRINKLER AND STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH NB # 321590382.
B00348581-I1
04/02/2025
Objection resolved — Addressed
03/26/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00746539-I1
03/26/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OROCCUPANCY.
B00914860-I1
03/26/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00924423-I1
03/26/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00746546-I1
03/10/2025
Objection raised — Energy
03/07/2025
Signed off — Alteration
B00400465-I1
03/05/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/26/2025
Filed — Alteration
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH NB # 321590382.
B00347841-P2
02/25/2025
Signed off — Alteration
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH NB # 321590382.
B00347846-I1
02/20/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FILED IN CONJUNCTION WITH NB JOB # 321590382.
B00404078-I1
02/20/2025
Signed off — Alteration
USE OF MINI CRANE FOR INSTALLATION OF FACADE PANELS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 321590382.
B00947348-I1
02/20/2025
Permit issued — Curb Cut
B00400465-I1-CC
02/20/2025
Permit issued — Structural
B00347846-I1-ST
02/20/2025
Permit issued — Protection and Mechanical Methods
B00947348-I1-PMM
02/20/2025
Permit issued — Mechanical Systems
B00347841-I1-MS
02/20/2025
Permit issued — Construction Fence
B00404078-I1-FN
01/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
01/24/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Soorjbally Harilall
01/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Soorjbally Harilall
01/21/2025
Objection resolved — Addressed
01/21/2025
Objection resolved — Addressed
01/10/2025
Signed off — Alteration
B00460856-I1
12/30/2024
Objection raised — Other
12/27/2024
Special inspection requirement — HVAC insulation and sealing
Soorjbally Harilall
12/27/2024
Special inspection requirement — Shutoff dampers
Soorjbally Harilall
12/27/2024
Special inspection requirement — HVAC and service water heating equipment
Soorjbally Harilall
12/27/2024
Special inspection requirement — HVAC and service water heating system controls
Soorjbally Harilall
12/27/2024
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
12/27/2024
Special inspection requirement — Final
Soorjbally Harilall
12/27/2024
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
12/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Soorjbally Harilall
12/27/2024
Special inspection requirement — Heating Systems
Soorjbally Harilall
12/27/2024
Special inspection requirement — Mechanical Systems
Soorjbally Harilall
12/26/2024
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
12/26/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/26/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
12/23/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/20/2024
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
12/16/2024
Objection raised — Other
12/11/2024
Objection resolved — Addressed
12/10/2024
Objection raised — Other
12/09/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
12/06/2024
Filed — Alteration
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH NB # 321590382
B00347852-P2
12/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Soorjbally Harilall
12/03/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Soorjbally Harilall
12/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
11/26/2024
Filed — Alteration
SPRINKLER AND STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH NB # 321590382.
B00348581-P2
10/15/2024
Permit issued — Standpipe
B00348581-I1-EW-SP
09/13/2024
Violation issued (FDNY_ORDER, closed)
09/13/2024
Violation issued (FDNY_ORDER, closed)
09/11/2024
421-a(16) registration filed
08/26/2024
Filed — Alteration
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OROCCUPANCY.
B00914860-P3
08/20/2024
Permit issued — Protection and Mechanical Methods
B00924423-I1-PMM
08/02/2024
Permit issued — Protection and Mechanical Methods
B00914860-I1-PMM
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offUPSTRATE INC02/20/2025
DOB NOWStructuralSigned-offUPSTRATE INC02/20/2025
DOB NOWProtection and Mechanical MethodsSigned-offUPSTRATE INC02/20/2025
DOB NOWMechanical SystemsSigned-offUPSTRATE INC02/20/2025
DOB NOWConstruction FenceSigned-offUPSTRATE INC02/20/2025
DOB NOWStandpipeSigned-offA M B MECHANICAL INC10/15/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/20/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/02/2024
DOB NOWStandpipeSigned-offA M B MECHANICAL INC07/30/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC07/30/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN07/10/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC05/20/2024
DOB NOWSuspended ScaffoldSigned-offDORIA, INC01/18/2024
DOB NOWProtection and Mechanical MethodsSigned-offINTERNATIONAL CONCRETE C*11/06/2023
DOB NOWStandpipeSigned-offA M B MECHANICAL INC10/19/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/25/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/08/2023
DOB NOWProtection and Mechanical MethodsSigned-offINTERNATIONAL CONCRETE C*08/07/2023
DOB NOWStandpipeSigned-offA M B MECHANICAL INC08/03/2023
DOB NOWStandpipeSigned-offA M B MECHANICAL INC08/01/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN07/11/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC05/31/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC05/30/2023
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP05/25/2023
DOB NOWConstruction FenceSigned-offSTRUCTURELINE INC11/07/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC06/01/2022
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC06/01/2022
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP05/23/2022
DOB NOWConstruction FenceSigned-offSTRUCTURELINE INC05/18/2022
BIS—ISSUEDUPSTRATE INC07/10/2024
BIS—ISSUEDUPSTRATE INC06/04/2024
BIS—ISSUEDUPSTRATE INC06/04/2024
BIS—ISSUEDHIGHLEVEL GROUP INC09/12/2023
BIS—ISSUEDHIGHLEVEL GROUP INC02/21/2023
BIS—ISSUEDHIGHLEVEL GROUP INC02/21/2023
BIS—ISSUEDSTRUCTURELINE INC06/06/2022
BIS—ISSUEDSTRUCTURELINE INC06/03/2022
6 projects · most recent 05/20/2025
General Wiring
FiledStatusContractorScope
05/20/2025CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
01/20/2025CompleteHIVOLTS ELECTRICAL INC—
12/01/2023Permit IssuedPOWER DIRECT ELECTRIC INC—
07/26/2023CompleteSOLAS ELECTRICAL CORP—
01/05/2023CompletePRIME ELECTRICAL CORP1 meters, 1 new_meters
06/02/2022CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
03/05/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
12/26/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
12/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/26/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/23/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/20/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
12/09/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/22/2024Fail-Final PL - More than 10 Requested FloorsFailView ↗
02/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/07/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/27/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
10/24/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
10/24/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
07/31/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
01/24/2025Energy Code Compliance InspectionsSoorjbally Harilallprogress
01/24/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSoorjbally Harilallspecial
01/24/2025Fire-Resistant Penetrations and JointsSoorjbally Harilallspecial
12/27/2024HVAC insulation and sealing Soorjbally Harilallenergy_progress
12/27/2024Shutoff dampersSoorjbally Harilallenergy_progress
12/27/2024HVAC and service water heating equipment Soorjbally Harilallenergy_progress
12/27/2024HVAC and service water heating system controls Soorjbally Harilallenergy_progress
12/27/2024Energy Code Compliance InspectionsSoorjbally Harilallprogress
12/27/2024FinalSoorjbally Harilallprogress
12/27/2024Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
12/27/2024Fire-Resistant Penetrations and JointsSoorjbally Harilallspecial
12/27/2024Heating SystemsSoorjbally Harilallspecial
12/27/2024Mechanical SystemsSoorjbally Harilallspecial
12/03/2024Fire-Resistant Penetrations and JointsSoorjbally Harilallspecial
12/03/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSoorjbally Harilallspecial
12/03/2024Energy Code Compliance InspectionsSoorjbally Harilallprogress
08/28/2023Post-installed AnchorsSOORJBALLY HARILALLspecial
08/28/2023MasonrySOORJBALLY HARILALLspecial
08/28/2023Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
08/28/2023FinalSoorjbally Harilallprogress
07/31/2023Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
07/31/2023MasonrySOORJBALLY HARILALLspecial
07/31/2023Post-installed AnchorsSOORJBALLY HARILALLspecial
07/31/2023FinalSoorjbally Harilallprogress
06/28/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSoorjbally Harilallspecial
Latest 25 of 27.
▾Documents — 262 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch13
08/29/2026B00746539-P1Request digital key ↗
08/29/2026B00746539-I1Request digital key ↗
08/27/2026B00915325-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Standpipe4
09/02/2026B00348581-P1Request digital key ↗
09/02/2026B00348581-P2Request digital key ↗
09/02/2026B00348581-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00347852-I1Request digital key ↗
09/02/2026B00347852-P1Request digital key ↗
08/14/2026B00347852-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/02/2026B00347841-I1Request digital key ↗
08/15/2026B00347841-P2Request digital key ↗
08/15/2026B00347841-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
09/02/2026B00348581-P2Request digital key ↗
09/02/2026B00348581-I1Request digital key ↗
09/02/2026B00348581-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/02/2026B00347846-P1Request digital key ↗
08/15/2026B00347846-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00404078-P1Request digital key ↗
09/02/2026B00404078-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00400465-I1Request digital key ↗
▸Applications & Permits37
▸BISPLAN / WORK APPROVAL APPLICATION25
12/12/2025321590382Open ↗
05/15/2025321590382Open ↗
05/13/2025321590382Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION9
06/05/2024321590382Open ↗
06/05/2024321590382Open ↗
06/05/2024321590382Open ↗
Showing 3 of 9 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
05/13/2021340768351Open ↗
05/13/2021340768351Open ↗
11/27/2020340768351Open ↗
▸Zoning, Tax Lot & Property Records18
▸BISZONING DIAGRAM5
08/05/2025321590382Open ↗
07/27/2023321590382Open ↗
02/18/2022321590382Open ↗
Showing 3 of 5 on file for this type
▸BISZONING EXHIBIT V: CERTIFICATION2
10/09/2024322114966Open ↗
02/02/2021321590382Open ↗
▸BISZONING EXHIBIT II: CERTIFICATION2
10/09/2024322114966Open ↗
02/02/2021321590382Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
10/09/2024322114966Open ↗
02/11/2021321590382Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION2
10/09/2024322114966Open ↗
02/02/2021321590382Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
09/25/2020321590382Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
02/02/2021321590382Open ↗
▸BISVERIFY TAX LOT1
11/21/2024321590382Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
02/02/2021321590382Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/21/2024321590382Open ↗
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/02/2026B00404078-P1Open ↗
09/02/2026B00404078-I1Open ↗
09/01/2026B00460856-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B00347846-I1Open ↗
08/29/2026B00347852-P1Open ↗
08/28/2026B00347852-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00347846-I1Open ↗
08/29/2026B00347852-P1Open ↗
08/28/2026B00347852-I1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/27/2020340768351Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/27/2020340768351Open ↗
▸Trade Schedules & Equipment5
▸BISFIRE PROTECTION PLAN (FPP): FDNY APPROVAL1
05/06/2025321590382Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/13/2025321590382Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/13/2025321590382Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/21/2024321590382Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
11/21/2024321590382Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
02/02/2021321590382Open ↗
11/27/2020340768351Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/27/2022321590382Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/27/2022321590382Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/27/2022321590382Open ↗
02/11/2021321590382Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
05/08/2025321590382Open ↗
▸BISINTERIOR LIGHTING POWER1
03/13/2025321590382Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
05/08/2025321590382Open ↗
▸BISFENESTRATION AREAS1
03/13/2025321590382Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
05/08/2025321590382Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
05/08/2025321590382Open ↗
▸BISLIGHTING IN DWELLING UNITS1
03/13/2025321590382Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00347841-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00347841-I1Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/27/2022321590382Open ↗
05/27/2022321590382Open ↗
02/11/2021321590382Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
05/05/2025321590382Open ↗
05/27/2022321590382Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
05/27/2022321590382Open ↗
05/27/2022321590382Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
03/05/2025321590382Open ↗
▸BISTECHNICAL REPORT: PHOTOLUMINESCENCE1
05/07/2025321590382Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
03/19/2025321590382Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
02/11/2021321590382Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
03/05/2025321590382Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/13/2025321590382Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/13/2025321590382Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/05/2025321590382Open ↗
▸BISPOST-INSTALLED ANCHORS1
03/19/2025321590382Open ↗
▸Approvals, Objections & Sign-offs23
▸BISLETTERS - SUPPORTING DOCUMENTATION11
03/10/2025321590382Open ↗
10/04/2024322114966Open ↗
10/04/2024322114966Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
05/15/2025321590382Open ↗
05/13/2025321590382Open ↗
03/05/2025321590382Open ↗
Showing 3 of 10 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
03/06/2025340768351Open ↗
03/06/2025340768351Open ↗
▸Cost, Insurance & Ownership6
▸BISPROJECT-SPECIFIC GL INSURANCE3
06/05/2024321590382Open ↗
02/22/2023321590382Open ↗
05/27/2022321590382Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
06/05/2024321590382Open ↗
02/22/2023321590382Open ↗
05/27/2022321590382Open ↗
▸Filing & Intake Forms26
▸BISADDITIONAL INFORMATION23
12/15/2025321590382Open ↗
12/15/2025321590382Open ↗
08/05/2025321590382Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING COVER SHEET3
10/01/2024322114966Open ↗
05/12/2020321590382Open ↗
05/12/2020321590382Open ↗
▸Other Documents12
▸BISSHUTOFF DAMPERS1
03/13/2025321590382Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
02/11/2021321590382Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
12/14/2025321590382Open ↗
▸BISUNDERPINNING (2014)1
03/05/2025321590382Open ↗
▸BISPLOT DIAGRAM - PD11
02/11/2021321590382Open ↗
▸BISVESTIBULES1
03/13/2025321590382Open ↗
▸BISMAINTENANCE INFORMATION1
03/13/2025321590382Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
05/19/2021340768351Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
03/13/2025321590382Open ↗
▸BISBPP: FILING REQUIRED1
02/02/2021321590382Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B00982009-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B00982009-I1Open ↗