← Back
One story retail building
394 NEW LOTS AVENUE
BROOKLYN · BIN 3398893
💬 Discuss this project
1994Year Built
1Stories
K1Building Class
R6Zoning
5,640 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: 394 NEW LOTS, LLC · 5,830 sf lot · 0.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof8p · 2 filings · 20 docs
Bulkhead5p · 1 filing · 20 docs
Floor 85p · 1 filing · 20 docs
Floor 74p · 1 filing · 20 docs
Floor 66p · 1 filing · 20 docs
Floor 55p · 1 filing · 20 docs
Floor 42p · 1 filing · 20 docs
Floor 32p · 1 filing · 20 docs
Floor 27p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Mezzanine2p · 1 filing · 6 docs
Cellar8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MNC GENERAL CONTRACTORS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADROIT ENGINEERING PLLC103/10/2026
FLORINELA MURESAN602/19/2026
ELEVATED ENGINEERING NYC310/30/2025
IMC ARCHITECTURE DPC110/29/2025
BRICOLAGE DESIGNS204/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRICOLAGE DESIGNS203/21/2026
CORE CONSULTANTS NYC1003/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ADROIT ENGINEERING PLLC8885103/10/2026
Building Lifecycle
All (75)Filed (11)Violation (3)Objection (31)Special Inspection (30)
04/06/2026
Objection raised — Structural
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/10/2026
Filed — Full Demolition
Full demolition to a one story building
B01364307-I1
03/10/2026
Special inspection requirement — Demolition
DUY HOANG
03/06/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
DUY HOANG
03/04/2026
Objection resolved — Addressed
02/23/2026
Objection raised — Other
02/19/2026
Filed — New Building
MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING JOB NUMBER # B01293368-I1.
B01293368-P3
02/12/2026
Objection resolved — Addressed
02/06/2026
Special inspection requirement — Maintenance information
02/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/06/2026
Special inspection requirement — Post-installed Anchors
02/06/2026
Special inspection requirement — Energy Code Compliance Inspections
02/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
12/29/2025
Objection raised — Other
12/29/2025
Objection resolved — Addressed
12/28/2025
Objection resolved — Addressed
12/24/2025
Objection raised — Other
12/10/2025
Objection resolved — Addressed
12/03/2025
Filed — New Building
MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING JOB NUMBER # B01293368-I1.
B01293368-Z1
11/28/2025
Objection raised — Other
11/20/2025
Special inspection requirement — Maintenance information
11/20/2025
Special inspection requirement — Interior lighting power
11/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
11/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
11/20/2025
Special inspection requirement — Electrical motors and elevators
11/20/2025
Special inspection requirement — Duct leakage testing, insulation and design
11/20/2025
Special inspection requirement — Lighting controls
11/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
11/20/2025
Special inspection requirement — Exterior lighting power
11/19/2025
Objection raised — Other
11/19/2025
Objection resolved — Addressed
11/18/2025
Objection resolved — Addressed
11/18/2025
Objection resolved — Addressed
11/18/2025
Objection resolved — Addressed
11/18/2025
Objection resolved — Addressed
11/18/2025
Objection resolved — Addressed
11/18/2025
Objection resolved — Addressed
11/13/2025
Special inspection requirement — Post-installed Anchors
11/13/2025
Special inspection requirement — Sprinkler Systems
11/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/12/2025
Objection raised — Admin
11/12/2025
Objection raised — Other
11/12/2025
Objection raised — Inspections
11/12/2025
Objection raised — Energy
11/12/2025
Objection raised — Admin
11/12/2025
Objection raised — Other
11/12/2025
Objection raised — Other
11/12/2025
Objection raised — Inspections
11/10/2025
Objection raised — Other
10/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/31/2025
Special inspection requirement — Post-installed Anchors
10/30/2025
Filed — New Building
MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING JOB NUMBER # B01293368-I1.
B01293368-S6
10/30/2025
Filed — New Building
MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING JOB NUMBER # B01293368-I1.
B01293368-S1
10/30/2025
Filed — New Building
MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING JOB NUMBER # B01293368-I1.
B01293368-S2
10/30/2025
Filed — New Building
MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING JOB NUMBER # B01293368-I1.
B01293368-S3
10/30/2025
Filed — New Building
MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING JOB NUMBER # B01293368-I1.
B01293368-S5
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDM.N.C. GENERAL CONTR CORP02/26/2009
BISPLISSUEDCREATIVE PLUMBING IN08/30/1994
1 project · most recent 02/19/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/19/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Ice Air RSXC09 9,200 BTU · Ptac ×45
Lg ZRNU243MAAA 27,300 BTU · Vrf Indoor ×2
KNSAP241A 24,000 BTU · Fan Coil Indoor ×1
KUSAP241A 25,200 BTU · Vrf Outdoor ×1
ZRNU183MAAA 21,500 BTU · Vrf Indoor ×1
ZRUM060GSSS0 64,000 BTU · Vrf Outdoor ×1
Captiveaire CAS-HVAC1-E302-15-5T-ERV 1,290 CFM · Erv ×1
Ventilation
Greenheck G-097-VG 100 CFM · Exhaust Fan ×2
SQ-7-M1-VG 900 CFM · Exhaust Fan ×2
AX-3125-0425-VG 75 CFM · Exhaust Fan ×1
SQ-97-VG 225 CFM · Exhaust Fan ×1
1 project · most recent 02/19/2026
Sprinkler System
FiledStatusContractorScope
02/19/2026——Sprinkler System
2 projects · most recent 02/19/2026
Storm Water/Sanitary
FiledStatusContractorScope
02/19/2026——Storm, Water/Sanitary
04/01/2022——Storm, Water/Sanitary
1 project · most recent 02/19/2026
Concrete
FiledStatusContractorScope
02/19/2026——Concrete
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
03/10/2026DemolitionDUY HOANGspecial
03/06/2026Structural Stability – Alterations of existing BuildingsDUY HOANGspecial
02/06/2026Maintenance information—energy_progress
02/06/2026HVAC-R and service water heating equipment—energy_progress
02/06/2026Fire-Resistant Penetrations and Joints—special
02/06/2026Post-installed Anchors—special
02/06/2026Energy Code Compliance Inspections—progress
02/06/2026HVAC-R and service water piping design and insulation—energy_progress
02/06/2026HVAC-R and service water heating system controls—energy_progress
11/20/2025Maintenance information—energy_progress
11/20/2025Interior lighting power—energy_progress
11/20/2025HVAC-R and service water heating equipment—energy_progress
11/20/2025HVAC-R and service water heating system controls—energy_progress
11/20/2025Electrical motors and elevators—energy_progress
11/20/2025Duct leakage testing, insulation and design—energy_progress
11/20/2025Lighting controls—energy_progress
11/20/2025HVAC-R and service water piping design and insulation—energy_progress
11/20/2025Exterior lighting power—energy_progress
11/13/2025Post-installed Anchors—special
11/13/2025Sprinkler Systems—special
11/13/2025Fire-Resistant Penetrations and Joints—special
10/31/2025Fire-Resistant Penetrations and Joints—special
10/31/2025Post-installed Anchors—special
10/24/2025Standpipe Systems—special
10/16/2025Energy Code Compliance Inspections—progress
Latest 25 of 55.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/01/2026B00576562-I1Request digital key ↗
08/19/2026B01293368-S8Request digital key ↗
08/19/2026B01293368-S6Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
12/09/2025340921836Open ↗
09/01/2021322099572Open ↗
02/26/2009310298754Open ↗
▸BISWORK PERMIT APPLICATION1
02/26/2009310298754Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B01293368-I1Open ↗
08/13/2026B00576562-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01293368-I1Open ↗
▸DOB NOWRestrictive Declaration1
08/13/2026B00576562-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01293368-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/01/2026B00576562-I1Open ↗
08/19/2026B01293368-I1Open ↗
08/19/2026B01293368-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/27/2026B01364307-I1Open ↗
09/27/2026B01364307-I1Open ↗
08/28/2026B01293368-S2Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/05/2009310298754Open ↗
02/26/2009310298754Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/26/2009310298754Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/26/2009310298754Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/14/2026B01293368-I1Open ↗
08/13/2026B00576562-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026B00576562-I1Open ↗
08/13/2026B01293368-I1Open ↗
▸DOB NOWStreet Tree Checklist2
09/01/2026B00576562-I1Open ↗
08/14/2026B01293368-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
02/26/2009310298754Open ↗
▸Inspections & Test Reports5
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00576562-I1Open ↗
08/13/2026B01293368-S2Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026B01293368-S2Open ↗
08/13/2026B00576562-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00576562-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
02/26/2009310298754Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/05/2009310298754Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/05/2009310298754Open ↗
02/26/2009310298754Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
09/01/2021322099572Open ↗
02/26/2009310298754Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification2
08/14/2026B01293368-I1Open ↗
08/13/2026B01364307-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00576562-I1Open ↗
08/13/2026B01293368-I1Open ↗
▸DOB NOWSURVEY: INITIAL1
08/13/2026B00576562-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01364307-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01293368-I1Open ↗
▸DOB NOWPD1 Document1
08/13/2026B00576562-I1Open ↗