← Back
BuildNYC
Two family converted from one family
395 GRAND AVENUE
BROOKLYN · Clinton Hill · BIN 3056818
💬 Discuss this project
1870Year Built
3Stories
B3Building Class
R6BZoning
3,600 sfGross Floor Area
2Units
Two family converted from one family · 2,030 sf lot · 1.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 1 filing · 20 docs
Floor 3Under Construction30p · 1 filing · 20 docs
Floor 2Under Construction30p · 1 filing · 20 docs
Floor 1Under Construction31p · 1 filing · 20 docs
CellarUnder Construction36p · 1 filing · 20 docs
BasementUnder Construction4p · 1 filing · 20 docs
Sub-BasementUnder Construction29p · 1 filing · 20 docs
Site & exteriorSidewalk shed installation7p · 2 filings · 4 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/03/2015$3.0M—395 GRAND AVENUE, LLC → Private party$847/sf building
01/24/2014$1.8M—Private party → 395 GRAND AVENUE LLC$508/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Aeis311/12/2026
A Degree of Freedom Structural Engineering205/14/2026
Millward Architecture Design209/04/2025
Syed Engineering203/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Millward Architecture Design303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & G Construction ServicesScaffold603/21/2026
M Interior Construction IGeneral Contractor307/09/2026
Tap PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Degree of Freedom Structural925205/14/2026
EP Inspections and Commis7079208/18/2025
Millward Architecture Des9680108/18/2025
Building Lifecycle
11/12/2026
Filed — Alteration
PLUMBING WORK IN THE CELLAR, BASEMENT, FIRST, SECOND, AND THIRD FLOORS AS PER FILED PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01220900-P3
07/07/2026
Permit renewed — General Construction
Renewed without changes
B01220900-I1-GC
06/08/2026
Permit issued — Structural
B01220900-S1-ST
06/01/2026
Special inspection requirement — Structural Steel - Welding
Dominic Cullen
06/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dominic Cullen
45 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedM Interior Construction I07/07/2026
DOB NOWStructuralPermit IssuedM Interior Construction I06/08/2026
DOB NOWPlumbingPermit IssuedTap Plumbing02/11/2026
DOB NOWGeneral ConstructionPermit IssuedM Interior Construction I11/28/2025
DOB NOWSidewalk ShedSigned-offJ & G Construction Services04/02/2021
DOB NOWSupported ScaffoldSigned-offJ & G Construction Services03/22/2021
1 project · most recent 11/12/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
11/12/2026Permit IssuedM Interior Construction IHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 11/12/2026
Gas Water/Sanitary
FiledStatusContractorScope
11/12/2026Permit IssuedTap PlumbingGas, Water/Sanitary
2 projects · most recent 02/18/2026
General Wiring
FiledStatusContractorScope
02/18/2026Permit IssuedJP & Son ElectricGeneral Wiring
03/24/2021Permit IssuedRichard Neu—
1 project · most recent 11/12/2026
Steel
FiledStatusContractorScope
11/12/2026Permit IssuedM Interior Construction ISteel
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
06/01/2026Structural Steel - WeldingDominic Cullenspecial
06/01/2026Structural Stability – Alterations of existing buildingsDominic Cullenspecial
06/01/2026Structural Steel - DetailsDominic Cullenspecial
06/01/2026Concrete - Cast-In-PlaceDominic Cullenspecial
06/01/2026Structural Steel - High Strength BoltingDominic Cullenspecial
06/01/2026Post-installed AnchorsDominic Cullenspecial
06/01/2026FinalDominic Cullenprogress
05/14/2026Concrete - Cast-In-PlaceDominic Cullenspecial
05/14/2026Post-installed AnchorsDominic Cullenspecial
05/14/2026Structural Stability – Alterations of existing buildingsDominic Cullenspecial
05/14/2026Structural Steel - DetailsDominic Cullenspecial
05/14/2026Structural Steel - High Strength BoltingDominic Cullenspecial
05/14/2026Structural Steel - WeldingDominic Cullenspecial
05/14/2026Final—progress
07/31/2025Fire-Resistant Penetrations and JointsERIK MILLWARDspecial
05/05/2025Mechanical SystemsMOLLY GLENNspecial
05/05/2025FinalMOLLY GLENNprogress
46 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account