Two family brick
395 STERLING PLACE
BROOKLYN · BIN 3029217
💬 Discuss this project
1898Year Built
3Stories
B1Building Class
R6BZoning
2,996 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · 2,282 sf lot · 1.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof34p · 1 filing · 20 docs
Floor 330p · 1 filing · 20 docs
Floor 228p · 1 filing · 20 docs
Floor 130p · 1 filing · 20 docs
Cellar32p · 1 filing · 20 docs
Basement33p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NORTHBRIDGE CONTRACTING L203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/15/2022$3.7M—Private party → Private party$1,243/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BROOKLYN SOLARWORKS103/21/2026
BMB BUILDING CONSULTING1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROOKLYN SOLARWORKS LLCGeneral Contractor203/21/2026
NORTHBRIDGE CONTRACTING LGeneral Contractor207/08/2026
KATAN P & H INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244106/03/2024
JIAN ENGINEERING PLLC7397703/28/2024
Building Lifecycle
All (91)Filed (10)Permit Issued (5)Signed Off (1)Violation (2)Inspection (1)Objection (42)Special Inspection (30)
08/06/2024
Signed off — Alteration
B01055295-I1
06/05/2024
Permit issued — Solar
B01055295-I1-SL
06/03/2024
Filed — Alteration
B01055295-I1
05/22/2024
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
05/22/2024
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
05/22/2024
Special inspection requirement — Final
NARESH MAHANGU
05/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
05/22/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
03/28/2024
Filed — Alteration CO
Propose plumbing works as per plan filed in conjunction with alt-CO job# B00786292-I1.
B00786292-P5
03/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
02/05/2024
Permit issued — Plumbing
B00786292-S2-PL
06/22/2023
Objection raised — Other
06/22/2023
Objection resolved — Addressed
06/22/2023
Special inspection requirement — Preliminary
JIAN DENG
06/22/2023
Special inspection requirement — Fire-Resistance Rated Construction
JIAN DENG
06/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
06/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/21/2023
Special inspection requirement — Footing and Foundation
06/21/2023
Special inspection requirement — Final
06/21/2023
Special inspection requirement — Structural Wood Frame
06/21/2023
Special inspection requirement — Structural Steel - Welding
06/21/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
06/21/2023
Special inspection requirement — Structural Steel - High Strength Bolting
06/21/2023
Special inspection requirement — Post-installed Anchors
06/21/2023
Special inspection requirement — Concrete - Cast-In-Place
06/21/2023
Special inspection requirement — Subgrade Inspections
06/21/2023
Special inspection requirement — Structural Steel - Details
06/21/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
06/20/2023
Filed — Alteration CO
Propose plumbing works as per plan filed in conjunction with alt-CO job# B00786292-I1.
B00786292-P4
06/20/2023
Objection resolved — Addressed
06/14/2023
Objection raised — Other
06/14/2023
Objection resolved — Addressed
06/14/2023
Objection raised — Other
06/14/2023
Objection resolved — Addressed
06/14/2023
Objection raised — Other
06/14/2023
Objection resolved — Addressed
06/14/2023
Objection raised — Other
06/14/2023
Objection resolved — Addressed
06/14/2023
Objection raised — Other
06/12/2023
Objection resolved — Addressed
06/07/2023
Objection raised — Other
06/06/2023
Filed — Alteration CO
Propose plumbing works as per plan filed in conjunction with alt-CO job# B00786292-I1.
B00786292-P3
06/06/2023
Special inspection requirement — Final
06/06/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
06/06/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
06/06/2023
Special inspection requirement — Post-installed Anchors
06/06/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/06/2023
Special inspection requirement — Structural Steel - Details
06/06/2023
Special inspection requirement — Structural Steel - High Strength Bolting
06/06/2023
Special inspection requirement — Structural Steel - Welding
06/06/2023
Special inspection requirement — Subgrade Inspections
05/12/2023
Permit issued — Mechanical Systems
B00786292-S1-MS
05/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/19/2023
Filed — Alteration CO
Propose plumbing works as per plan filed in conjunction with alt-CO job# B00786292-I1.
B00786292-P2
03/13/2023
Objection resolved — Addressed
03/13/2023
Objection resolved — Addressed
03/13/2023
Objection resolved — Addressed
03/10/2023
Objection raised — Other
03/10/2023
Objection raised — Structural
03/10/2023
Objection raised — Admin
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC06/05/2024
DOB NOWPlumbingSigned-offKATAN P & H INC02/05/2024
DOB NOWMechanical SystemsPermit IssuedNORTHBRIDGE CONTRACTING L05/12/2023
DOB NOWPlumbingSigned-offKATAN P & H INC12/30/2022
DOB NOWGeneral ConstructionPermit IssuedNORTHBRIDGE CONTRACTING L09/23/2022
1 project · most recent 03/28/2024
Gas Water/Sanitary
FiledStatusContractorScope
03/28/2024Signed-offKATAN P & H INCGas, Water/Sanitary
3 projects · most recent 05/22/2024
General Wiring
FiledStatusContractorScope
05/22/2024CompleteBROOKYLN SOLARWORKS, LLC—
12/06/2023CompleteNELSON & TOM MAINT INC DBGeneral Wiring
09/23/2022CompleteNELSON & TOM MAINT INC DB2 meters, 2 new_meters
1 project · most recent 03/28/2024
Steel Concrete Wood
FiledStatusContractorScope
03/28/2024Signed-offKATAN P & H INCSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
05/22/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
05/22/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
05/22/2024FinalNARESH MAHANGUprogress
05/22/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
05/22/2024Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
03/21/2024Fire-Resistant Penetrations and JointsJIAN DENGspecial
06/22/2023PreliminaryJIAN DENGprogress
06/22/2023Fire-Resistance Rated ConstructionJIAN DENGprogress
06/22/2023Fire-Resistant Penetrations and JointsJIAN DENGspecial
06/21/2023Structural Stability – Alterations of existing buildings—special
06/21/2023Footing and Foundation—progress
06/21/2023Final—progress
06/21/2023Structural Wood Frame—progress
06/21/2023Structural Steel - Welding—special
06/21/2023Excavations - Sheeting, Shoring, and Bracing—special
06/21/2023Structural Steel - High Strength Bolting—special
06/21/2023Post-installed Anchors—special
06/21/2023Concrete - Cast-In-Place—special
06/21/2023Subgrade Inspections—special
06/21/2023Structural Steel - Details—special
06/21/2023Construction Operations Influencing Adjacent Structures—special
06/06/2023Final—progress
06/06/2023Construction Operations Influencing Adjacent Structures—special
06/06/2023Excavations - Sheeting, Shoring, and Bracing—special
06/06/2023Post-installed Anchors—special
Latest 25 of 43.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/27/2026B00786292-S1Request digital key ↗
08/27/2026B00786292-P5Request digital key ↗
08/27/2026B00786292-P4Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits10
▸DOB NOWLPC Approval/Permit10
08/13/2026B00786292-P1Open ↗
08/13/2026B00786292-I1Open ↗
08/13/2026B00786292-P2Open ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00786292-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/27/2026B00786292-P5Open ↗
08/27/2026B00786292-P4Open ↗
08/27/2026B00786292-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/27/2026B00786292-P3Open ↗
09/27/2026B00786292-P3Open ↗
09/27/2026B00786292-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/27/2026B00786292-P3Open ↗
09/27/2026B00786292-S1Open ↗
09/27/2026B00786292-S1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/27/2026B00786292-P4Open ↗
08/15/2026B00786292-P3Open ↗
08/15/2026B00786292-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/27/2026B00786292-P5Open ↗
08/27/2026B00786292-P4Open ↗
08/27/2026B00786292-P2Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01055295-I1Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification3
08/15/2026B00786292-P3Open ↗
08/15/2026B00786292-I1Open ↗
08/14/2026B00786292-P1Open ↗
▸DOB NOWProof of Historic Building3
08/13/2026B00786292-P3Open ↗
08/13/2026B00786292-P1Open ↗
08/13/2026B00786292-I1Open ↗