← Back
BuildNYC
Elevator apt, semi-fireproof without stores
3951 GOUVERNEUR AVENUE
BRONX · BIN 2015475
💬 Discuss this project
1928Year Built
6Stories
D1Building Class
R7-1Zoning
106,100 sfGross Floor Area
86Units
LL97 CoveredRent Stabilized17 Active Violations 16 unresolved · 1 paperwork only ▸
Elevator apt, semi-fireproof without stores · Owner of record: L & L Properties · 20,300 sf lot · 5.23 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalEquipmentLandscapeGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1Heavy duty sidewalk shed installationUnder Construction4p · 2 filings · 4 docs
Site & exteriorCracked bricks grinding and pointing2p · 1 filing · 5 docs
Filed — no permit issuedFacade repairs: brick mortar, steel lintels, windowsills1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
L & L Properties503/22/2026
Tahir Sons Construction407/08/2026
Bekimi Associates110/30/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jose M. Landauro, P.E110/29/2026
Ikra Consulting108/19/2026
Asr Engineering203/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Aramco GroupScaffold208/22/2026
Tahir and Sons ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jose M. Landauro3500110/29/2026
Syed Engineering7054103/14/2025
Building Lifecycle
10/29/2026
Filed — Alteration
Filing for facade repairs work that includes cut and point brick mortar joints, replacement of steel lintels, repair of precast concrete windowsills(s) and miscellaneous brick masonry repairs throughout the building,
X01473558-I1
10/29/2026
Special inspection requirement — Energy Code Compliance Inspections
JOSE LANDAURO
10/29/2026
Special inspection requirement — Air barrier - visual inspection
JOSE LANDAURO
10/15/2026
Boiler inspection report filed
Initial · no defects · Accepted
10/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSE LANDAURO
104 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAramco Group08/21/2026
DOB NOWGeneral ConstructionSigned-offTahir and Sons Construction03/27/2025
DOB NOWSidewalk ShedSigned-offAramco Group02/28/2025
BISOTISSUEDNY Landmarks Gen Construction08/01/2014
BISEQISSUEDRock Group NY06/20/2014
BISEQISSUEDRock Scaffolding07/01/2010
BISEQISSUEDRegional Scaffold and Hoisting06/30/1992
2 projects · most recent 08/21/2026
FiledStatusContractorScope
08/21/2026Permit IssuedRichard Neu—
03/02/2025CompleteRichard Neu—
1 project · most recent 08/19/2026
Sidewalk Shed
FiledStatusContractorScope
08/19/2026Permit IssuedAramco GroupSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
10/29/2026Energy Code Compliance InspectionsJOSE LANDAUROprogress
10/29/2026Air barrier - visual inspectionJOSE LANDAUROenergy_progress
10/13/2026Structural Stability – Alterations of existing buildingsJOSE LANDAUROspecial
10/13/2026Tenant Protection Plan Compliance—special
10/13/2026MasonryJOSE LANDAUROspecial
10/13/2026FinalJOSE LANDAUROprogress
03/13/2025MasonryRAFI HAMIDspecial
03/13/2025Tenant Protection Plan ComplianceRAFI HAMIDspecial
03/13/2025FinalRAFI HAMIDprogress
51 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account