| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/27/2026 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric SUZ-KA24NA2.TH 49,000 BTU · Heat Pump Outdoor ×11 SUZ-KA36NA2.TH 66,400 BTU · Heat Pump Outdoor ×10 MXZ-SM36NAM2-U1 67 BTU · Heat Pump Outdoor ×7 SUZ-KA30NA2.TH 57,000 BTU · Heat Pump Outdoor ×5 MXZ-SM48NAM2-U1 98,000 BTU · Heat Pump Outdoor ×4 MXZ-2C2ONA4 4,500 BTU · Heat Pump Outdoor ×1 MXZ-SM60NAM2-U1 126,000 BTU · Heat Pump Outdoor ×1 SUZ-KA18NA2.TH 39,600 BTU · Heat Pump Outdoor ×1 Ventilation Greenheck ERVe-35-30L 29,000 CFM · Erv ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/27/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/27/2026 | — | — | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/27/2025 | Permit Issued | D & W ELECTRICAL CONT COR | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/27/2026 | — | — | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/27/2026 | — | — | Fence |
| Owner | Filings | Most Recent |
|---|---|---|
| IMPACT BUILDERS CORP | 1 | 03/22/2026 |
| GLORIOUS CHURCH OF GOD | 7 | 03/22/2026 |
| CHATA CONTRACTING | 1 | 03/22/2026 |
| GLORIOUS CHURCH/CHRIST J | 1 | 03/22/2026 |
| GLORIOUS CHURCH OF GOD IN CHRIST | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ADVANCED ENGINEERING & INSPECT. PLL | 4 | 05/27/2026 |
| STRUCTURAL ENGINEERING TECHNOLOGIES | 4 | 05/20/2026 |
| ADROIT ENGINEERING PLLC | 3 | 04/28/2026 |
| CJS DESIGN COLLABORATIVE, LLC | 1 | 02/19/2026 |
| RISE ARCHITECTURE | 2 | 11/17/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| AVALON DESIGNS | 6 | 03/21/2026 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/20/2026 | Post-installed Anchors | — | special |
| 07/20/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/22/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 06/22/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 06/22/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 06/15/2026 | Post-installed anchors in masonry | — | special |
| 06/08/2026 | Seismic Isolation Systems | — | special |
| 06/08/2026 | Post-installed Anchors | — | special |
| 05/26/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 05/26/2026 | Energy Code Compliance Inspections | — | progress |
| 05/26/2026 | Maintenance information | — | energy_progress |
| 05/26/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 05/26/2026 | Heating Systems | — | special |
| 05/18/2026 | Concrete - Cast-In-Place | — | special |
| 05/18/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 05/18/2026 | Concrete - Cast-In-Place | — | special |
| 05/18/2026 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 05/18/2026 | Subgrade Inspections | — | special |
| 05/18/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 05/12/2026 | Standpipe Systems | — | special |
| 05/12/2026 | Sprinkler Systems | — | special |
| 05/12/2026 | Standpipe Systems | — | special |
| 05/11/2026 | Concrete - Cast-In-Place | — | special |
| 05/11/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 05/11/2026 | Concrete - Cast-In-Place | — | special |