Elevator apt, semi-fireproof without stores
3971 GOUVERNEUR AVENUE
💬 Discuss this project
1928Year Built
6Stories
D1Building Class
R7-1Zoning
65,394 sfGross Floor Area
67Units
LL97 CoveredRent Stabilized16 Open Violations 14 unresolved · 2 paperwork only ▸
Elevator apt, semi-fireproof without stores · Owner of record: 3971 GOUVERNEUR LLC · 15,515 sf lot · 4.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipment
Permit Issued — active, not yet Signed-off
Site & exteriorUnder Construction5p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3971 GOUVERNEUR5503/22/2026
MNK ENTERPRISES NY607/23/2026
DOUBLE KEY MANAGEMENT604/09/2026
HDS FUNDING COMPANY103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/27/2017$14.2M—HDS FUNDING COMPANY → 3971 GOUVERNEUR LLC$218/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A & T ENGINEERING, P.C.106/23/2025
MSM ENGINEERING SERVICES, PLLC103/11/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JEONG YUNGElectrical303/21/2026
GRID CITY ELECTRIC, CORPElectrical203/22/2026
PARK CONTRACTING GROUPGeneral Contractor207/23/2026
RICHARD NEUElectrical103/21/2026
ADOR BUILDERS LLCGeneral Contractor104/09/2026
MNK ENTERPRISES NY INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC CONSULTING ENGINEERS,4083106/23/2025
Building Lifecycle
All (71)Filed (2)Permit Issued (4)Violation (60)Objection (2)Special Inspection (3)
07/22/2026
Permit issued — Sidewalk Shed
X01190067-I1-SH
03/22/2026
Violation issued (HPD, open)
A
03/13/2026
Violation issued (HPD, closed)
C
03/13/2026
Violation issued (HPD, closed)
C
03/05/2026
Violation issued (HPD, open)
C
03/05/2026
Violation issued (HPD, open)
C
03/05/2026
Violation issued (HPD, open)
C
03/05/2026
Violation issued (HPD, open)
A
03/05/2026
Violation issued (HPD, open)
B
12/18/2025
Violation issued (HPD, open)
A
12/18/2025
Violation issued (HPD, closed)
B
12/18/2025
Violation issued (HPD, open)
A
12/18/2025
Violation issued (HPD, closed)
B
12/18/2025
Violation issued (HPD, closed)
B
12/18/2025
Violation issued (HPD, open)
A
12/18/2025
Violation issued (HPD, closed)
B
12/18/2025
Violation issued (HPD, closed)
C
12/18/2025
Violation issued (HPD, open)
A
12/18/2025
Violation issued (HPD, open)
A
12/18/2025
Violation issued (HPD, closed)
B
12/18/2025
Violation issued (HPD, closed)
B
11/20/2025
Permit issued — General Construction
X01232268-I1-GC
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/29/2025
Violation issued (ECB, open)
Construction
07/14/2025
Permit issued — Sidewalk Shed
X01190067-I1-SH
06/26/2025
Objection resolved — Addressed
06/25/2025
Objection raised — Admin
06/23/2025
Filed — Alteration
THE SCOPE OF WORK IS LIMITED TO THE REPAIR OR REPLACEMENT OF EXISTING EXTERIOR FACADE ELEMENTS, NO CHANGE IN ZONING, EGRESS, OR SCHEDULE OF OCCUPANCY.
X01232268-I1
06/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
JAN PEREZ
05/28/2025
Special inspection requirement — Masonry
JAN PEREZ
05/28/2025
Special inspection requirement — Post-installed Anchors
JAN PEREZ
03/17/2025
Permit issued — Sidewalk Shed
X01190067-I1-SH
03/11/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01190067-I1
03/03/2025
Violation issued (ECB, open)
Construction
03/03/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2025
Violation issued (ECB, open)
Construction
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/10/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/10/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/10/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/10/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/20/2018
Violation issued (HPD, closed)
C
05/29/2018
Violation issued (ECB, closed)
Construction
05/16/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2018
Violation issued (HPD, closed)
C
05/15/2018
Violation issued (HPD, closed)
C
05/15/2018
Violation issued (HPD, closed)
B
05/15/2018
Violation issued (HPD, closed)
B
05/15/2018
Violation issued (HPD, closed)
B
05/15/2018
Violation issued (HPD, closed)
B
05/15/2018
Violation issued (HPD, closed)
C
05/15/2018
Violation issued (HPD, closed)
B
05/15/2018
Violation issued (HPD, closed)
B
05/01/2018
Violation issued (HPD, closed)
C
04/09/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/20/2018
Violation issued (ECB, closed)
Unknown
02/05/2018
Violation issued (HPD, closed)
A
01/31/2018
Violation issued (HPD, closed)
I
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPARK CONTRACTING GROUP07/22/2026
DOB NOWGeneral ConstructionPermit IssuedADOR BUILDERS LLC11/20/2025
DOB NOWSidewalk ShedPermit IssuedPARK CONTRACTING GROUP07/14/2025
DOB NOWSidewalk ShedPermit IssuedMNK ENTERPRISES NY INC03/17/2025
BISOTISSUED770 ELECTRIC CORP10/10/2023
BISOTISSUEDSPLEN CONSTRUCTION INC03/22/2022
BISOTISSUEDCOS CONSTRUCTION INC02/19/2019
BISOTISSUEDCOS CONSTRUCTION INC02/19/2019
BISMHISSUEDCOS CONSTRUCTION INC02/19/2019
BISOTISSUEDCOS CONSTRUCTION INC02/19/2019
BISOTISSUEDCOS CONSTRUCTION INC02/19/2019
BISOTISSUEDCOS CONSTRUCTION INC02/19/2019
BISMHISSUEDCOS CONSTRUCTION INC02/19/2019
BISPLISSUEDBELL FUEL OIL, LLC01/15/2019
BISPLISSUEDCLEAN TECH MECHANICAL INC12/21/2018
BISMHISSUEDCOS CONSTRUCTION INC12/18/2018
BISOTISSUEDCOS CONSTRUCTION INC09/12/2018
BISPLISSUEDCLEAN TECH MECHANICAL INC09/04/2018
BISPLISSUEDARCO PLBG AND HTG INC08/15/2018
BISFBISSUEDAPPROVED OIL OF BKLYN,INC08/15/2018
BISOTISSUEDCOS CONSTRUCTION INC08/13/2018
BISMHISSUEDCOS CONSTRUCTION INC08/13/2018
BISPLISSUEDCLEAN TECH MECHANICAL INC08/07/2018
BISPLISSUEDCLEAN TECH MECHANICAL INC08/07/2018
BISOTISSUEDCOS CONSTRUCTION INC07/30/2018
BISOTISSUEDCOS CONSTRUCTION INC07/30/2018
BISOTISSUEDCOS CONSTRUCTION INC07/27/2018
BISOTISSUEDCOS CONSTRUCTION INC06/29/2018
BISPLISSUEDHP SERVICES INC06/22/2018
BISPLISSUEDHP SERVICES INC06/22/2018
BISMHISSUEDCOS CONSTRUCTION INC05/24/2018
BISPLISSUEDHP SERVICES INC04/13/2018
BISOTISSUEDCOS CONSTRUCTION INC03/27/2018
BISMHISSUEDCOS CONSTRUCTION INC02/23/2018
BISMHISSUEDCOS CONSTRUCTION INC02/23/2018
BISOTISSUEDCOS CONSTRUCTION INC02/22/2018
BISOTISSUEDCOS CONSTRUCTION INC02/22/2018
BISPLISSUEDHP SERVICES INC02/21/2018
BISMHISSUEDCOS CONSTRUCTION INC01/29/2018
BISPLISSUEDHP SERVICES INC12/08/2017
+ 7 more permits on file
14 projects · most recent 03/15/2025
General Wiring Boiler Controls
FiledStatusContractorScope
03/15/2025Permit IssuedRICHARD NEU—
10/26/2023CompleteGRID CITY ELECTRIC, CORP—
12/18/2018Permit IssuedINTELOGIC ELECTRIC, INC.General Wiring
12/10/2018CompleteDEMAND ELECTRIC INCBoiler Controls
11/27/2018Permit IssuedINTELOGIC ELECTRIC, INC.General Wiring
09/26/2018Permit IssuedINTELOGIC ELECTRIC, INC.General Wiring
08/23/2018Permit IssuedINTELOGIC ELECTRIC, INC.General Wiring
08/10/2018Permit IssuedINTELOGIC ELECTRIC, INC.General Wiring
08/07/2018CompleteDEMAND ELECTRIC INC—
07/09/2018Permit IssuedINTELOGIC ELECTRIC, INC.General Wiring
07/09/2018Permit IssuedINTELOGIC ELECTRIC, INC.General Wiring
06/08/2018Permit IssuedINTELOGIC ELECTRIC, INC.General Wiring
03/28/2018Permit IssuedINTELOGIC ELECTRIC, INC.General Wiring
02/19/2018Permit IssuedINTELOGIC ELECTRIC, INC.General Wiring
1 project · most recent 03/11/2025
Sidewalk Shed
FiledStatusContractorScope
03/11/2025Permit IssuedPARK CONTRACTING GROUPSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
06/12/2025Tenant Protection Plan ComplianceJAN PEREZspecial
05/28/2025MasonryJAN PEREZspecial
05/28/2025Post-installed AnchorsJAN PEREZspecial
▾Documents — 374 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026X01190067-I1Request digital key ↗
▸Applications & Permits86
▸BISPLAN / WORK APPROVAL APPLICATION44
09/20/2023240353835Open ↗
08/26/2021220666884Open ↗
08/17/2021220650409Open ↗
Showing 3 of 44 on file for this type
▸BISWORK PERMIT APPLICATION38
10/10/2023240353835Open ↗
03/24/2022220650409Open ↗
01/15/2019240232869Open ↗
Showing 3 of 38 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
11/16/2021220657368Open ↗
11/03/2021220666884Open ↗
11/01/2021220650392Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/28/2021220650409Open ↗
▸Seals & Professional Certifications68
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
12/05/2019220659794Open ↗
12/05/2019220659794Open ↗
04/29/2019220638326Open ↗
Showing 3 of 37 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
09/12/2018220666884Open ↗
08/13/2018240232869Open ↗
Showing 2 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
09/12/2018220666884Open ↗
Showing 1 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026X01232268-I1Open ↗
09/01/2026X01232268-I1Open ↗
09/01/2026X01232268-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026X01190067-I1Open ↗
08/13/2026X01232268-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/13/2018240232869Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/20/2023240353835Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/13/2018240232869Open ↗
▸Trade Schedules & Equipment30
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE23
03/28/2019220659794Open ↗
03/28/2019220650392Open ↗
03/28/2019220650392Open ↗
Showing 3 of 23 on file for this type
▸BISSCHEDULE B - PLUMBING4
08/17/2021220650409Open ↗
08/13/2021220650409Open ↗
08/10/2021220650409Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
09/06/2018240232869Open ↗
09/06/2018240232869Open ↗
08/13/2018240232869Open ↗
▸Safety & Tenant Protection16
▸BISTenant Protection Plan and Notes11
09/12/2018220666884Open ↗
08/13/2018240232869Open ↗
Showing 2 of 11 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
10/10/2023240353835Open ↗
▸Environmental & Asbestos16
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
09/20/2023240353835Open ↗
10/15/2018220666884Open ↗
09/12/2018220666884Open ↗
Showing 3 of 14 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01232268-I1Open ↗
▸Energy Compliance46
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS21
12/05/2019220659794Open ↗
04/29/2019220638326Open ↗
04/29/2019220652372Open ↗
Showing 3 of 21 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
11/02/2021220666884Open ↗
10/28/2021220650392Open ↗
12/05/2019220659794Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
01/19/2024240353835Open ↗
10/10/2023240353835Open ↗
09/29/2023240353835Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
01/19/2024240353835Open ↗
11/09/2021220657368Open ↗
10/26/2021220666884Open ↗
Showing 3 of 4 on file for this type
▸BISINSULATION PLACEMENT & R VALUES2
10/26/2021220666884Open ↗
10/26/2021220650392Open ↗
▸BISLIGHTING IN DWELLING UNITS2
10/26/2021220666884Open ↗
10/26/2021220650392Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
09/20/2023240353835Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
01/19/2024240353835Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/13/2018240232869Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY9
01/19/2024240353835Open ↗
10/10/2023240353835Open ↗
09/20/2023240353835Open ↗
Showing 3 of 9 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
10/26/2021220666884Open ↗
10/26/2021220650392Open ↗
▸BISMECHANICAL SYSTEMS2
10/26/2021220666884Open ↗
10/26/2021220650392Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
10/26/2021220666884Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
01/23/2024240353835Open ↗
11/16/2021220657368Open ↗
11/03/2021220666884Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER1
03/24/2022220650409Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/23/2019240232869Open ↗
▸Cost, Insurance & Ownership35
▸BISCOST AFFIDAVIT29
09/20/2023240353835Open ↗
11/09/2021220657368Open ↗
11/02/2021220666884Open ↗
Showing 3 of 29 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
01/19/2024240353835Open ↗
10/26/2021220666884Open ↗
10/26/2021220650392Open ↗
▸Filing & Intake Forms46
▸BISADDITIONAL INFORMATION19
10/02/2023240353835Open ↗
09/29/2023240353835Open ↗
09/20/2023240353835Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET15
08/27/2020210181890Open ↗
09/12/2018220666884Open ↗
Showing 2 of 15 on file for this type
▸BISBOROUGH INTAKE FORM10
03/24/2022220650409Open ↗
12/05/2019220659794Open ↗
04/29/2019220638326Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/20/2023240353835Open ↗
08/13/2018240232869Open ↗
▸Other Documents4
▸DOB NOWHPD4: CONH Pilot Program2
08/13/2026X01190067-I1Open ↗
08/13/2026X01232268-I1Open ↗
▸BISHPD: CONH PILOT1
09/20/2023240353835Open ↗
▸BISTax Abatement Miscellaneous1
01/23/2024240353835Open ↗