← Back
BuildNYC
Elevator cooperative
Amalgamated Co-op Towers
3975 SEDGWICK AVENUE · BIN 2095200
💬 Discuss this project
1968Year Built
20Stories
D4Building Class
R7-1Zoning
425,070 sfGross Floor Area
319Units
LL97 CoveredRent Stabilized81 Active Violations 80 unresolved · 1 paperwork only 4 likely answered 4 old, status unconfirmed ▸FISP: UNSAFE
Elevator cooperative · Owner of record: Amalgamated Housing · 121,000 sf lot · 3.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofAmalgamated Housing Corporation5p · 4 filings · 12 docs
Floor 16Amalgamated Housing Corporation3p · 1 filing · 6 docs
Floor 15Amalgamated Housing Corporation3p · 1 filing · 6 docs
Floor 14Amalgamated Housing Corporation3p · 1 filing · 6 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorAmalgamated Housing CorporationUnder Construction7p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Amalgamated Housing5807/28/2026
Park Reservoir Housing203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rigid Structural Design205/19/2026
Howard L Zimmerman Arch & Engineering204/12/2024
Ashraf212/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Howard L Zimmerman Architects203/21/2026
Rigid Structural Design303/21/2026
Hlzae103/21/2026
Smep Design & Consultation403/21/2026
Lombardo Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ceprine ConstructionScaffold1407/28/2026
The Metro Group ElectricElectrical503/21/2026
Quality Building ConstrutionGeneral Contractor307/08/2026
Maximum ElectricElectrical103/21/2026
The Metro Group ElectricElectrical103/22/2026
Quality Building ConstrutionScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
George J. Xerakias, PE1658105/14/2024
Howard L Zimmerman Architects1712204/12/2024
Building Lifecycle
All (124)Filed (9)Permit Issued (16)Signed Off (2)Facade (FISP) (32)Violation (60)Special Inspection (5)
07/27/2026
Permit issued — Sidewalk Shed
X00880044-I1-SH
07/27/2026
Violation issued (ECB, open)
Construction
07/27/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/16/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
X01132771-I1
06/16/2026
Signed off — Alteration
X01132766-I1
06/09/2026
Permit issued — Suspended Scaffold
X01132766-I1-SC
06/09/2026
Permit issued — Suspended Scaffold
X01132771-I1-SC
05/19/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00970005-P1
05/04/2026
Permit issued — Sidewalk Shed
X00880044-I1-SH
03/24/2026
Violation issued (ECB, open)
Construction
03/04/2026
Violation issued (HPD, open)
C
02/25/2026
Cycle 10 facade report submitted
02/25/2026
Cycle 10 facade report signed — UNSAFE
02/20/2026
Cycle 9 facade report submitted
02/20/2026
Cycle 9 facade report signed — UNSAFE
02/17/2026
Cycle 9 facade inspection completed
02/17/2026
Cycle 10 facade inspection completed
11/25/2025
Violation issued (HPD, open)
B
11/25/2025
Violation issued (HPD, open)
B
11/25/2025
Violation issued (HPD, open)
C
11/12/2025
Permit issued — Sidewalk Shed
X00970005-I1-SH
10/10/2025
Violation issued (HPD, open)
C
10/10/2025
Violation issued (HPD, open)
C
10/10/2025
Violation issued (HPD, open)
B
09/30/2025
Violation issued (HPD, closed)
C
06/05/2025
Violation issued (HPD, closed)
A
05/07/2025
Permit issued — Sidewalk Shed
X00880044-I1-SH
04/08/2025
Violation issued (ECB, closed)
Local Law
02/24/2025
Violation issued (HPD, open)
A
02/24/2025
Violation issued (HPD, open)
B
02/24/2025
Violation issued (HPD, open)
C
02/24/2025
Violation issued (HPD, open)
B
02/24/2025
Violation issued (HPD, open)
B
12/13/2024
Permit issued — Suspended Scaffold
X01132771-I1-SC
12/13/2024
Permit issued — Suspended Scaffold
X01132766-I1-SC
12/03/2024
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
X01132771-I1
12/01/2024
Filed — Alteration
X01132766-I1
11/27/2024
Permit issued — Sidewalk Shed
X00970005-I1-SH
09/23/2024
Violation issued (HPD, closed)
C
09/23/2024
Violation issued (HPD, open)
B
09/23/2024
Violation issued (HPD, open)
A
09/23/2024
Violation issued (HPD, open)
A
09/23/2024
Violation issued (HPD, closed)
C
09/23/2024
Violation issued (HPD, closed)
C
09/23/2024
Violation issued (HPD, open)
A
09/23/2024
Violation issued (HPD, open)
B
09/23/2024
Violation issued (HPD, open)
A
06/19/2024
Violation issued (ECB, closed)
Unknown
06/14/2024
Permit issued — Protection and Mechanical Methods
X01028424-I1-PMM
05/16/2024
Permit issued — Sidewalk Shed
X00880044-I1-SH
05/16/2024
Permit issued — Suspended Scaffold
X01051215-I1-SC
05/14/2024
Filed — Alteration
RENEW SR23-1497
X01051215-I1
05/14/2024
Violation issued (ECB, open)
Construction
05/14/2024
Special inspection requirement — Post-installed Anchors
George Xerakias
05/13/2024
Permit issued — General Construction
X00889553-I1-GC-CX
04/12/2024
Filed — Alteration
X01028424-I1
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2024
Cycle 9 facade report submitted
02/13/2024
Cycle 9 facade report signed — UNSAFE
02/13/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedCeprine Construction07/27/2026
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System06/09/2026
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System06/09/2026
DOB NOWSidewalk ShedPermit IssuedCeprine Construction05/04/2026
DOB NOWSidewalk ShedPermit IssuedCeprine Construction11/12/2025
DOB NOWSidewalk ShedPermit IssuedCeprine Construction05/07/2025
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System12/13/2024
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System12/13/2024
DOB NOWSidewalk ShedPermit IssuedCeprine Construction11/27/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedQuality Building Construt06/14/2024
DOB NOWSidewalk ShedPermit IssuedCeprine Construction05/16/2024
DOB NOWSuspended ScaffoldPermit IssuedQuality Building Construction05/16/2024
DOB NOWGeneral ConstructionPermit IssuedQuality Building Construt05/13/2024
DOB NOWSidewalk ShedPermit IssuedCeprine Construction12/07/2023
DOB NOWGeneral ConstructionPermit IssuedQuality Building Construt07/26/2023
DOB NOWSidewalk ShedPermit IssuedCeprine Construction05/30/2023
BISPLISSUEDNew York Plumbing-Heating-Cooling08/10/2018
BISOTISSUEDRemus Industries05/18/2017
BISOTISSUEDRemus Industries05/18/2017
BISOTISSUEDRemus Industries11/18/2016
BISOTISSUEDRemus Industries11/18/2016
BISOTISSUEDRemus Industries05/19/2016
BISEQISSUEDSpring Scaffolding12/16/2015
BISEQISSUEDCeprine Construction09/23/2015
BISOTISSUEDRemus Industries05/22/2015
BISOTISSUEDRemus Industries05/22/2015
BISOTISSUEDYates Restoration Group02/12/2015
BISOTISSUEDRemus Industries02/09/2015
BISOTISSUEDRemus Industries02/09/2015
BISEQISSUEDSpring Scaffolding12/30/2014
BISEQISSUEDSpring Scaffolding12/29/2014
BISEQISSUEDCeprine Construction09/27/2014
BISOTISSUEDYates Restoration Group06/26/2014
BISOTISSUEDYates Restoration Group06/13/2014
BISEQISSUEDSpring Scaffolding03/11/2014
BISEQISSUEDSpring Scaffolding03/11/2014
BISEQISSUEDCeprine Construction04/12/2013
BISEQISSUEDConsolidated Scaffold & Bridge09/06/2012
BISEQISSUEDConsolidated Scaffold & Bridge08/31/2012
BISOTISSUEDV&G Contracting04/01/2002
+ 6 more permits on file
3 projects · most recent 08/13/2026
General Wiring
FiledStatusContractorScope
08/13/2026Permit IssuedHigh Quality Electric of NYC—
11/19/2024CompleteThe Metro Group ElectricGeneral Wiring
06/01/2023Permit IssuedBorowide Elect'l Contractors—
1 project · most recent 06/14/2023
FiledStatusContractorScope
06/14/2023Permit IssuedQuality Building Construt1 scope_items
2 projects · most recent 05/19/2026
Sidewalk Shed
FiledStatusContractorScope
05/19/2026Permit IssuedCeprine ConstructionSidewalk Shed
12/16/2023Permit IssuedCeprine ConstructionSidewalk Shed
2 projects · most recent 12/03/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
12/03/2024Signed-offStructural Preservation System—
05/14/2024Permit Issued—Suspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/14/2024Post-installed AnchorsGeorge Xerakiasspecial
06/13/2023MasonryJon Colatrellaspecial
06/13/2023Structural Stability – Alterations of existing buildingsJon Colatrellaspecial
06/13/2023Tenant Protection Plan ComplianceJon Colatrellaspecial
06/13/2023FinalJon Colatrellaprogress
▾Documents — 222 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/23/2026X00889553-I1Request digital key ↗
08/22/2026X00880044-I1Request digital key ↗
08/22/2026X00880044-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits50
▸BISWORK PERMIT APPLICATION22
08/13/2018220662129Open ↗
06/16/2017220546443Open ↗
06/16/2017220546434Open ↗
Showing 3 of 22 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION16
02/03/2022220539200Open ↗
02/03/2022220539219Open ↗
08/08/2018220662129Open ↗
Showing 3 of 16 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION11
09/21/2015220368377Open ↗
09/02/2015220368377Open ↗
08/11/2015220368377Open ↗
Showing 3 of 11 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
08/30/2016240051162Open ↗
▸Seals & Professional Certifications59
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
08/08/2018220662129Open ↗
06/07/2018220546434Open ↗
06/07/2018220546434Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
08/08/2018220662129Open ↗
08/19/2016220546434Open ↗
08/19/2016220546443Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/22/2026X00880044-P1Open ↗
08/22/2026X00880044-I1Open ↗
08/21/2026X01028424-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
08/08/2018220662129Open ↗
08/24/2016220546434Open ↗
08/24/2016220546443Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
03/11/2014240051162Open ↗
03/11/2014240051171Open ↗
04/12/2013240023407Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
03/11/2014240051162Open ↗
03/11/2014240051171Open ↗
04/12/2013240023407Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/05/2012220221855Open ↗
09/04/2012220221819Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/13/2026X00889553-I1Open ↗
08/25/2026X01051215-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/13/2026X00889553-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/08/2018220662129Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes5
08/13/2018220662129Open ↗
06/02/2017220539219Open ↗
06/02/2017220539200Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos8
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
08/08/2018220662129Open ↗
09/24/2014220403132Open ↗
09/22/2014220403123Open ↗
Showing 3 of 5 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
08/19/2016220546434Open ↗
08/19/2016220546443Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026X00889553-I1Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
08/08/2018220662129Open ↗
09/22/2017220403123Open ↗
08/15/2017220403132Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
06/07/2018220546434Open ↗
06/07/2018220546443Open ↗
09/22/2017220403123Open ↗
Showing 3 of 5 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
03/11/2014240051162Open ↗
04/12/2013240023407Open ↗
▸BISTR8: Energy Code Progress Inspections1
02/09/2015220403123Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/11/2014240051171Open ↗
04/12/2013240023407Open ↗
▸Approvals, Objections & Sign-offs24
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
06/22/2018220546443Open ↗
06/22/2018220546434Open ↗
06/07/2018220546434Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
08/11/2017220403132Open ↗
01/15/2016240051162Open ↗
10/13/2015240023407Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
09/05/2012220221855Open ↗
09/04/2012220221819Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026X00889553-I1Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT13
08/08/2018220662129Open ↗
06/07/2018220546434Open ↗
06/07/2018220546443Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms22
▸BISEFILING COVER SHEET10
08/08/2018220662129Open ↗
06/02/2017220539219Open ↗
06/02/2017220539200Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION5
02/06/2018220539200Open ↗
02/06/2018220539200Open ↗
02/06/2018220539219Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
06/07/2018220546434Open ↗
06/07/2018220546443Open ↗
05/15/2018220403123Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
03/11/2014240051162Open ↗
03/11/2014240051171Open ↗
04/12/2013240023407Open ↗
▸Other Documents7
▸BISFEE EXEMPTION DOCUMENTATION3
03/11/2014240051162Open ↗
03/11/2014240051171Open ↗
04/12/2013240023407Open ↗
▸DOB NOWIRA Certification2
08/13/2026X01132771-I1Open ↗
08/13/2026X01132766-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X01051215-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01051215-I1Open ↗