← Back
Two family converted from one family
398 BAINBRIDGE STREET
BROOKLYN · Bedford-Stuyvesant (East) · BIN 3040783
💬 Discuss this project
1901Year Built
2Stories
B3Building Class
R5BZoning
2,175 sfGross Floor Area
2Units
Rent Stabilized2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family converted from one family · Owner of record: 398 BAINBRIDGE LLC · 1,725 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/13/2021$535K—Private party → MADISON EXPERTS LLC$246/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN ENGINEERING CONSULTANT PLLC112/06/2022
DOYUN KIM; RA105/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC BUILDING SOLUTIONS203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415105/18/2022
Building Lifecycle
All (8)Filed (2)Violation (6)
12/06/2022
Filed — Alteration
HEREWITH FILING TO INSTALL PLUMBING SYSTEMS AS PER CONSTRUCTION PLANS. IN CONJUNCTION WITH DOB NOW # B00728009-I1.
B00728077-I1
05/18/2022
Filed — Alteration
APPLICATION FILED HEREWITH TO PROPOSE NEWGYP BOARD, UPDATE PLUMBING AND FINISHESAS PER PLANS. TO EXISTING 2 FAMILY DWELLING.2 STORY W/ BASEMENT AND CELLAR.
B00728009-I1
04/21/2021
Violation issued (HPD, closed)
I
11/08/2019
Violation issued (HPD, closed)
I
10/31/2018
Violation issued (HPD, closed)
I
11/19/2015
Violation issued (HPD, closed)
C
11/19/2015
Violation issued (HPD, open)
B
10/05/2007
Violation issued (ECB, open)
Construction
Nothing on file for this building.
1 project · most recent 05/18/2022
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
05/18/2022——Air Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MSZ-GL15NA-U1 17,200 BTU · Pump ×8
MUZ-GL15NA-U1 18,200 BTU · Pump ×2
Heating
Mitsubishi Electric MSZ-GL15NA-U1 21,600 BTU · Pump ×8
MUZ-GL15NA-U1 20,900 BTU · Pump ×2
1 project · most recent 12/06/2022
Gas Water/Sanitary
FiledStatusContractorScope
12/06/2022——Gas, Water/Sanitary
Nothing on file for this building.
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/29/2026B00728009-I1Request digital key ↗
08/28/2026B00728077-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00728009-I1Open ↗
08/13/2026B00728077-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00728077-I1Open ↗
08/13/2026B00728009-I1Open ↗