← Back
Four families
398 HENRY STREET
💬 Discuss this project
1872Year Built
3Stories
C3Building Class
R6Zoning
3,200 sfGross Floor Area
4Units
Rent Stabilized22 Open Violations ▸
Four families · 2,000 sf lot · 1.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction49p · 1 filing · 20 docs
Floor 42p · 1 filing · 9 docs
Floor 3Under Construction51p · 2 filings · 20 docs
Floor 2Under Construction50p · 2 filings · 20 docs
Floor 1Under Construction52p · 2 filings · 20 docs
CellarUnder Construction44p · 2 filings · 20 docs
BasementUnder Construction49p · 1 filing · 20 docs
Site & exteriorUnder Construction14p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A D GENERAL CONTRACTORS607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/26/2023$3.5M—Private party → Private party$1,094/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FORRM ARCHITECTS807/27/2026
VOLUME SPACE CONSULTING INC.108/23/2024
STEEL CORE ENGINEERING PLLC212/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARK BRADY CONTRACTINGGeneral Contractor907/08/2026
A & D GENERAL CONTR INCGeneral Contractor407/08/2026
ARANDA PLBG & HTG CORPPlumbing207/08/2026
FLINT MECHANICAL CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AVT ENGINEERING345907/27/2026
Building Lifecycle
All (171)Filed (11)Permit Issued (9)Signed Off (4)Violation (25)Inspection (12)Objection (80)Special Inspection (30)
08/14/2026
Objection resolved — Resolved
08/06/2026
Objection raised — Cost
07/27/2026
Filed — Alteration CO
Installation of the new sprinkler system as shown on the plans.
B00872175-P2
07/27/2026
Filed — Alteration CO
Installation of the new sprinkler system as shown on the plans.
B00872175-P3
06/12/2026
Signed off — Alteration CO
Installation of the new sprinkler system as shown on the plans.
B00872175-S4
06/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSEPH PASATURO
06/12/2026
Special inspection requirement — Mechanical Systems
JOSEPH PASATURO
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH PASATURO
06/12/2026
Special inspection requirement — Final
JEREMY REED
05/29/2026
Signed off — Alteration
Propose interior renovation of existing multi-family dwelling. Removal and installation of non load bearing partitions and related finishes all as per plans herewith filed. No change in use, egress or occupancy filed under this application.
B00843077-I1
05/29/2026
Signed off — Alteration CO
Installation of the new sprinkler system as shown on the plans.
B00872175-S1
05/27/2026
Signed off — Alteration
B01100803-I1
05/04/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
11/05/2025
Permit issued — Mechanical Systems
B00872175-S2-MS
10/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/15/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/10/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/06/2025
Permit issued — Plumbing
B00872175-S3-PL
10/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/08/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/06/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/16/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/25/2025
Permit issued — Sprinklers
B00872175-S4-EW-SP
06/09/2025
Violation issued (HPD, open)
A
03/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/25/2024
Violation issued (HPD, open)
I
08/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/26/2024
Permit issued — Supported Scaffold
B01100803-I1-SH
08/26/2024
Permit issued — Supported Scaffold
B01100803-I1-SF
08/23/2024
Filed — Alteration
B01100803-I1
04/10/2024
Violation issued (HPD, open)
A
03/27/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/28/2024
Permit issued — Plumbing
B00872175-S3-PL
12/28/2023
Permit issued — General Construction
B00872175-I1-GC
12/12/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSEPH PASATURO
12/12/2023
Special inspection requirement — Structural Cold-Formed Steel
JOSEPH PASATURO
12/12/2023
Special inspection requirement — Final
Sebastian Sztukowski
12/12/2023
Special inspection requirement — Final
Sebastian Sztukowski
12/12/2023
Special inspection requirement — Concrete - Cast-In-Place
JOSEPH PASATURO
12/12/2023
Special inspection requirement — Structural Steel - High Strength Bolting
JOSEPH PASATURO
12/12/2023
Special inspection requirement — Structural Steel - Welding
JOSEPH PASATURO
12/12/2023
Special inspection requirement — Structural Steel - Details
JOSEPH PASATURO
12/07/2023
Filed — Alteration CO
Installation of the new sprinkler system as shown on the plans.
B00872175-P1
12/06/2023
Special inspection requirement — Structural Cold-Formed Steel
JOSEPH PASATURO
12/06/2023
Special inspection requirement — Concrete - Cast-In-Place
JOSEPH PASATURO
12/06/2023
Special inspection requirement — Structural Steel - High Strength Bolting
JOSEPH PASATURO
12/06/2023
Special inspection requirement — Structural Steel - Welding
JOSEPH PASATURO
12/06/2023
Special inspection requirement — Final
Sebastian Sztukowski
12/06/2023
Special inspection requirement — Structural Steel - Details
JOSEPH PASATURO
12/06/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSEPH PASATURO
11/20/2023
Objection resolved — Addressed
11/17/2023
Violation issued (HPD, open)
I
11/06/2023
Objection resolved — Addressed
11/01/2023
Objection resolved — Addressed
10/25/2023
Objection resolved — Addressed
10/25/2023
Objection resolved — Addressed
10/25/2023
Objection resolved — Addressed
Latest 60 of 171 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMARK BRADY CONTRACTING11/05/2025
DOB NOWPlumbingPermit IssuedARANDA PLBG & HTG CORP10/06/2025
DOB NOWSprinklersSigned-offBLETSAS P&H CORP06/25/2025
DOB NOWSupported ScaffoldSigned-offA & D GENERAL CONTR INC08/26/2024
DOB NOWSupported ScaffoldSigned-offA & D GENERAL CONTR INC08/26/2024
DOB NOWPlumbingPermit IssuedARANDA PLBG & HTG CORP02/28/2024
DOB NOWGeneral ConstructionPermit IssuedMARK BRADY CONTRACTING12/28/2023
DOB NOWStructuralSigned-offMARK BRADY CONTRACTING07/25/2023
DOB NOWGeneral ConstructionSigned-offMARK BRADY CONTRACTING04/14/2023
1 project · most recent 07/27/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/27/2026Permit IssuedMARK BRADY CONTRACTINGHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric Model# MXZ-SM42NAMHZ 48,000 BTU · Condensing Unit ×4
Model# MXZ-2C20NAHZ3 25,500 BTU · Condensing Unit ×2
1 project · most recent 07/27/2026
Sprinkler System
FiledStatusContractorScope
07/27/2026Signed-offBLETSAS P&H CORPSprinkler System
2 projects · most recent 07/27/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/27/2026Permit IssuedARANDA PLBG & HTG CORPGas, Water/Sanitary
04/18/2023——Gas, Water/Sanitary
2 projects · most recent 09/04/2024
General Wiring
FiledStatusContractorScope
09/04/2024Permit IssuedRICHARD NEU—
03/07/2024CompleteACCURATE ELEC'L CORP.General Wiring
1 project · most recent 07/27/2026
Steel Concrete
FiledStatusContractorScope
07/27/2026Permit IssuedMARK BRADY CONTRACTINGSteel, Concrete
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
10/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/15/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/10/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/06/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/16/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/30/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/27/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
06/12/2026Structural Stability – Alterations of existing buildingsJOSEPH PASATUROspecial
06/12/2026Mechanical SystemsJOSEPH PASATUROspecial
06/12/2026Fire-Resistant Penetrations and JointsJOSEPH PASATUROspecial
06/12/2026FinalJEREMY REEDprogress
12/12/2023Structural Stability – Alterations of existing buildingsJOSEPH PASATUROspecial
12/12/2023Structural Cold-Formed SteelJOSEPH PASATUROspecial
12/12/2023FinalSebastian Sztukowskiprogress
12/12/2023FinalSebastian Sztukowskiprogress
12/12/2023Concrete - Cast-In-PlaceJOSEPH PASATUROspecial
12/12/2023Structural Steel - High Strength BoltingJOSEPH PASATUROspecial
12/12/2023Structural Steel - WeldingJOSEPH PASATUROspecial
12/12/2023Structural Steel - DetailsJOSEPH PASATUROspecial
12/06/2023Structural Cold-Formed SteelJOSEPH PASATUROspecial
12/06/2023Concrete - Cast-In-PlaceJOSEPH PASATUROspecial
12/06/2023Structural Steel - High Strength BoltingJOSEPH PASATUROspecial
12/06/2023Structural Steel - WeldingJOSEPH PASATUROspecial
12/06/2023FinalSebastian Sztukowskiprogress
12/06/2023Structural Steel - DetailsJOSEPH PASATUROspecial
12/06/2023Structural Stability – Alterations of existing buildingsJOSEPH PASATUROspecial
08/16/2023Fire-Resistant Penetrations and JointsJOSEPH PASATUROspecial
08/16/2023Sprinkler SystemsJOSEPH PASATUROspecial
08/16/2023Fire-Resistant Penetrations and JointsJOSEPH PASATUROspecial
08/07/2023Structural Stability – Alterations of existing buildingsJOSEPH PASATUROspecial
08/03/2023Fire-Resistant Penetrations and JointsJOSEPH PASATUROspecial
08/02/2023Mechanical SystemsJOSEPH PASATUROspecial
Latest 25 of 30.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/26/2026B00872175-S2Request digital key ↗
08/26/2026B00872175-I1Request digital key ↗
08/26/2026B00872175-S1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit8
08/26/2026B00872175-P3Open ↗
08/26/2026B00872175-P2Open ↗
08/13/2026B00872175-S2Open ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B00872175-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/26/2026B00872175-S2Open ↗
08/26/2026B00872175-I1Open ↗
08/26/2026B00872175-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B00872175-P2Open ↗
08/22/2026B00872175-S2Open ↗
08/22/2026B00872175-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B00872175-P2Open ↗
09/01/2026B00843077-I1Open ↗
08/22/2026B00872175-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00872175-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B00872175-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/26/2026B00872175-S1Open ↗
08/26/2026B00872175-I1Open ↗
08/26/2026B00872175-P3Open ↗
Showing 3 of 10 on file for this type
▸Other Documents3
▸DOB NOWProof of Historic Building2
08/13/2026B00872175-I1Open ↗
08/13/2026B00843077-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B00872175-I1Open ↗