| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 01/23/2025 | $2.0M | — | MEISTER BROWNSTONE LLC → Private party | $1,182/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| KCE CONSULTING ENGINEERING PLLC | 3 | 06/18/2026 |
| ADVANCED ENGINEERING & INSPECT. PLL | 3 | 04/13/2026 |
| YOEL ROZENBERG | 1 | 01/15/2026 |
| Representative | Filings | Most Recent |
|---|---|---|
| BAC Developers Group | 1 | 03/21/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| BIS | MH | ISSUED | GJUSHI CONSTRUCTION CO LL | 09/13/2011 |
| BIS | OT | ISSUED | GJUSHI CONSTRUCTION CO LL | 01/24/2011 |
| BIS | PL | ISSUED | PREMIER FLOW PLBG AND HTG | 01/04/2011 |
| BIS | OT | ISSUED | GJUSHI CONSTRUCTION CO LL | 12/29/2010 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/18/2026 | — | — | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Mitsubishi Electric MXZ-SM48NL 48,000 BTU · Heat Pump Outdoor ×2 MXZ-SM36NL 36,000 BTU · Heat Pump Outdoor ×1 MXZ-SM60NL 60,000 BTU · Heat Pump Outdoor ×1 PUZ-AK12NL 120,000 BTU · Heat Pump Outdoor ×1 PUZ-AK36NL 36,000 BTU · Heat Pump Outdoor ×1 Heating Mitsubishi Electric MXZ-SM48NL 50,000 BTU · Heat Pump Outdoor ×2 MXZ-SM36NL 41,000 BTU · Heat Pump Outdoor ×1 MXZ-SM60NL 66,000 BTU · Heat Pump Outdoor ×1 PUZ-AK12NL 18,000 BTU · Heat Pump Outdoor ×1 PUZ-AK36NL 40,000 BTU · Heat Pump Outdoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/18/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/18/2026 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/18/2026 | — | — | 3 scope_items |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/10/2026 | Energy Code Compliance Inspections | — | progress |
| 06/17/2026 | Structural Steel - Welding | — | special |
| 06/17/2026 | Structural Steel - High Strength Bolting | — | special |
| 06/17/2026 | Structural Steel - Details | — | special |
| 06/17/2026 | Concrete - Cast-In-Place | — | special |
| 06/17/2026 | Post-installed anchors in masonry | — | special |
| 06/17/2026 | Structural Cold-Formed Steel | — | special |
| 05/15/2026 | Post-installed Anchors | — | special |
| 05/15/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 05/15/2026 | Subgrade Inspections | — | special |
| 04/30/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 04/23/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 04/23/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 04/13/2026 | Final | — | progress |
| 04/10/2026 | Maintenance information | — | energy_progress |
| 04/10/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 04/10/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 04/10/2026 | Heating Systems | — | special |
| 03/31/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 03/31/2026 | Shutoff dampers | — | energy_progress |
| 03/31/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 03/31/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 03/31/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 03/27/2026 | Final | — | progress |
| 03/27/2026 | Mechanical Systems | — | special |