Condo, office space
399 PARK AVENUE
MANHATTAN · BIN 1071457
💬 Discuss this project
1969Year Built
39Stories
RBBuilding Class
C5-2.5Zoning
1,526,121 sfGross Floor Area
2Units
LL97 Covered17 Open Violations ▸FISP: SAFE
Condo, office space · Owner of record: 399 PARK AVE CONDO BOARD OF MANAGER · 81,325 sf lot · 18.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneralOther
Permit Issued — active, not yet Signed-off
Roof55p · 6 filings · 20 docs
Floor 3813p · 7 filings · 20 docs
Floor 3714p · 10 filings · 20 docs
Floor 3614p · 9 filings · 20 docs
Floor 351p · 1 filing · 4 docs
Floor 34Under Construction43p · 3 filings · 11 docs
Floor 33Under Construction43p · 3 filings · 11 docs
Floor 32Under Construction52p · 7 filings · 20 docs
Floor 317p · 3 filings · 18 docs
Floor 3014p · 3 filings · 18 docs
Floor 2916p · 7 filings · 20 docs
Floor 2822p · 6 filings · 20 docs
Floor 2719p · 4 filings · 20 docs
Floor 26
Floor 257p · 1 filing · 3 docs
Floor 24
Floor 237p · 2 filings · 20 docs
Floor 222p · 2 filings · 20 docs
Floor 218p · 4 filings · 20 docs
Floor 206p · 4 filings · 20 docs
Floor 194p · 3 filings · 20 docs
Floor 183p · 4 filings · 20 docs
Floor 17
Floor 166p · 3 filings · 20 docs
Floor 1518p · 6 filings · 20 docs
Floor 14
Floor 13
Floor 12Under Construction6p · 5 filings · 20 docs
Floor 11Under Construction11p · 4 filings · 19 docs
Floor 10Under Construction13p · 5 filings · 20 docs
Floor 9Under Construction55p · 7 filings · 20 docs
Floor 861p · 12 filings · 20 docs
Floor 7Under Construction58p · 6 filings · 20 docs
Floor 683p · 19 filings · 20 docs
Floor 538p · 18 filings · 20 docs
Floor 422p · 11 filings · 20 docs
Floor 3Under Construction2p · 4 filings · 20 docs
Floor 29p · 9 filings · 20 docs
Floor 194p · 15 filings · 20 docs
Mezzanine12p · 4 filings · 20 docs
Cellar92p · 20 filings · 20 docs
Sub-Cellar40p · 12 filings · 20 docs
Basement9p · 4 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BXP24307/08/2026
BP 347 MADISON ASSOCIATES LLC C O3107/08/2026
SPRING SCAFFOLDING LLC807/08/2026
399 PARK AVE CONDO BOARD503/22/2026
TISHMAN CONSTRUCTION103/22/2026
HARDER SERVICES INC103/22/2026
387 PARK SOUTH103/22/2026
373-381 PAS ASSOCIATES LL103/22/2026
CITIBANK N.A.9303/22/2026
387 PAS ENTERPRISES203/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.36503/21/2026
GILLMAN CONSULTING8003/21/2026
LOUIS STRIAR2803/21/2026
RIZZO GROUP2703/21/2026
EUROCELT EXPEDITING, INC1003/21/2026
SPRING SCAFFOLDING LLC203/21/2026
AE DESIGN SOLUTION203/21/2026
A1 EXPEDITING SERVICE603/21/2026
RPO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STRUCTURE TONE, LLCGeneral Contractor5207/08/2026
CLUNE CONSTRUCTION CO LPGeneral Contractor4207/08/2026
JT MAGEN & COMPANY INCGeneral Contractor3207/08/2026
ABCO-PEERLESS SPRKLR CORPFire Protection3107/08/2026
TRI-STAR CONSTRUCTION CORPGeneral Contractor3007/08/2026
PETRETTI & ASSOCIATES LLCGeneral Contractor2807/08/2026
LAB PLBG & HTG CO INCPlumbing2407/08/2026
GANNON CONTRACTING LLCGeneral Contractor2207/08/2026
CONSTRUCTION MANAGEMENT &General Contractor2207/08/2026
PAR FIRE PROTECTION LLCFire Protection1707/08/2026
SIRINA FIRE PROT CORPFire Protection1707/08/2026
PLATFORM SOLUTIONS, INCGeneral Contractor1206/27/2026
SIGNSTAR NYCScaffold1007/08/2026
SAFWAY ATLANTIC, LLCGeneral Contractor1003/21/2026
BLACK BULL BULDERS LLCGeneral Contractor1007/08/2026
GILBANE BUILDING COMPANYGeneral Contractor707/08/2026
JOHN GALLIN & SON, INCGeneral Contractor603/21/2026
PAR PLUMBING CO., INCPlumbing607/08/2026
AEROK INCGeneral Contractor607/08/2026
TRULINE CONSTRUCTION SERVGeneral Contractor607/08/2026
ASHLAND PLUMBING CORPPlumbing607/08/2026
MAC FELDER INCPlumbing507/08/2026
MALATESTA PALADINO, INCGeneral Contractor507/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor403/21/2026
SPRING SCAFFOLDING LLCGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILROSE CONSULTANTS LLC20034508/06/2026
SHAHRISH SHUVO ENGINEERIN8524107/23/2026
CODEGREEN5101702/24/2026
ATLANTIC ENGINEERINGLABOR13818305/22/2025
AKF ENGINEERS, LLP27512511/26/2024
ENGINEERING BUILDING SERV73031109/23/2024
ATLAS ATC ENGINEERING INC80111209/05/2024
STE5741102/15/2024
COASTAL CONSTRUCTION SERV3827212/21/2023
SOCOTEC ENGINEERING49831604/28/2023
Building Lifecycle
All (300)Filed (76)Permit Issued (80)Signed Off (50)Facade (FISP) (3)Violation (1)Inspection (60)Special Inspection (30)
08/27/2026
Signed off — Alteration
alterations to existing SP Systems as per plans filed herewith
M01116909-I1
08/14/2026
Filed — Alteration
Modification to Plumbing Systems as per plans filed herewith.
M01417001-I1
08/13/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/07/2026
Special inspection requirement — Final
Thomas Lanzelotti
08/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
08/06/2026
Filed — Alteration
Interior renovation as per plans filed herewith.
M01362272-P1
08/05/2026
Permit issued — General Construction
M01417491-I1-GC
08/04/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/28/2026
Filed — Alteration
CVS Retail - Minor plumbing work related to minor renovation. No change to use, egress or occupancy.
M01417491-S1
07/23/2026
Filed — Alteration
CVS Retail - Minor plumbing work related to minor renovation. No change to use, egress or occupancy.
M01417491-I1
07/06/2026
Permit issued — Sprinklers
M00761207-I1-EW-SP
07/01/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/30/2026
Signed off — Alteration
alterations to existing plumbing/sprinkler systems as per plans filed herewith
M01182772-I1
06/25/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY WORK PLATFORM @ ROOF LEVEL AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORM TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE.
M01020153-I1
06/25/2026
Special inspection requirement — Sprinkler Systems
Christopher Drutjons
06/25/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
06/24/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/23/2026
Filed — Alteration
modifications to existing plumbing/sprinkler fixtures as per plans filed herewith
M01105959-P1
06/19/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/19/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/16/2026
Special inspection requirement — Lighting controls
Shahrish Shuvo
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
06/16/2026
Special inspection requirement — Interior lighting power
Shahrish Shuvo
06/16/2026
Special inspection requirement — Final
Shahrish Shuvo
06/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
06/05/2026
Special inspection requirement — Sprinkler Systems
Christopher Drutjons
06/05/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
05/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/12/2026
Signed off — Alteration
Modification to Mechanical systems as per plans filed herewith.
M01263209-I1
04/16/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/14/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/13/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
M01220036-I1
04/08/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
04/03/2026
Permit issued — Sprinklers
M01116909-I1-EW-SP
04/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/02/2026
Signed off — Alteration
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
M01193791-S3
04/01/2026
Signed off — Alteration
ALTERATIONS TO EXISTING SPRINKLER FIXUTRES AS PER PLANS FILED HEREWITH
M01079980-I1
03/25/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/20/2026
Signed off — Alteration
Removal and instillation of interior non load bearing partitions and related finishes. No change in use, egress or occupancy
M01201139-I1
03/20/2026
Signed off — Alteration
Alterations to existing PLUMBING/SPRINKLER Systems as per plans filed herewith
M01201192-I1
03/19/2026
Signed off — Alteration
M01103976-I1
03/19/2026
Permit issued — Mechanical Systems
M01362293-I1-MS
03/16/2026
Permit issued — Sprinklers
M01362306-I1-EW-SP
03/13/2026
Permit issued — General Construction
M01362272-I1-GC
03/11/2026
Filed — Alteration
Interior renovation as per plans filed herewith.
M01362272-I1
03/11/2026
Filed — Alteration
Modification to Sprinkler Systems as per plans filed herewith.
M01362306-I1
03/11/2026
Filed — Alteration
Modification to Mechanical systems as per plans filed herewith.
M01362293-I1
03/05/2026
Permit issued — Sprinklers
M01349769-I1-EW-SP
03/02/2026
Signed off — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
M00271734-I1
03/02/2026
Permit issued — General Construction
M01349655-I1-GC
03/01/2026
Permit issued — Protection and Mechanical Methods
M01020153-I1-PMM
02/26/2026
Permit issued — Plumbing
M01349753-I1-PL
02/26/2026
Permit issued — Mechanical Systems
M01349662-I1-MS
02/24/2026
Filed — Alteration
PLUMBING WORK FROM THE 32ND TO THE 34TH FLOORS AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01349753-I1
02/24/2026
Filed — Alteration
SPRINKLER WORK FROM THE 32ND TO THE 34TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01349769-I1
02/24/2026
Filed — Alteration
M01349655-I1
02/24/2026
Filed — Alteration
M01349662-I1
02/24/2026
Special inspection requirement — Post-installed Anchors
HATIM ELSAID
02/24/2026
Special inspection requirement — Lighting controls
HATIM ELSAID
02/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
HATIM ELSAID
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGLR INC08/05/2026
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP07/06/2026
DOB NOWSprinklersSigned-offABCO-PEERLESS SPRKLR CORP04/03/2026
DOB NOWMechanical SystemsPermit IssuedJRM CONSTRUCTION MGMT LLC03/19/2026
DOB NOWSprinklersPermit IssuedAGGRESSIVE FIRE PROT LLC03/16/2026
DOB NOWGeneral ConstructionPermit IssuedJRM CONSTRUCTION MGMT LLC03/13/2026
DOB NOWSprinklersSigned-offLAWRENCE J. LEVINE03/05/2026
DOB NOWGeneral ConstructionPermit IssuedGANNON CONTRACTING LLC03/02/2026
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC03/01/2026
DOB NOWMechanical SystemsPermit IssuedGANNON CONTRACTING LLC02/26/2026
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC02/26/2026
DOB NOWStructuralSigned-offPRECISE CONSTRUCTION CONR11/13/2025
DOB NOWMechanical SystemsSigned-offL&K PARTNERS, INC11/06/2025
DOB NOWMechanical SystemsSigned-offSTRUCTURE TONE, LLC10/28/2025
DOB NOWPlumbingSigned-offABCO-PEERLESS SPRKLR CORP08/27/2025
DOB NOWStructuralSigned-offTRI-STAR CONSTRUCTION COR08/05/2025
DOB NOWSprinklersSigned-offABCO-PEERLESS SPRKLR CORP07/29/2025
DOB NOWStructuralSigned-offSTRUCTURE TONE, LLC05/12/2025
DOB NOWPlumbingSigned-offABCO-PEERLESS SPRKLR CORP05/12/2025
DOB NOWSupported ScaffoldPermit IssuedPLATFORM SOLUTIONS, INC05/06/2025
DOB NOWStandpipeSigned-offLAWRENCE J. LEVINE05/05/2025
DOB NOWSprinklersSigned-offLAB PLBG & HTG CO INC05/02/2025
DOB NOWGeneral ConstructionSigned-offSTRUCTURE TONE, LLC05/01/2025
DOB NOWMechanical SystemsSigned-offSTRUCTURE TONE, LLC04/30/2025
DOB NOWMechanical SystemsSigned-offSTRUCTURE TONE, LLC04/22/2025
DOB NOWMechanical SystemsSigned-offGANNON CONTRACTING LLC04/10/2025
DOB NOWGeneral ConstructionSigned-offGANNON CONTRACTING LLC04/10/2025
DOB NOWStructuralSigned-offGANNON CONTRACTING LLC04/09/2025
DOB NOWPlumbingSigned-offJADA PLUMBING & HTG LLC04/03/2025
DOB NOWMechanical SystemsPermit IssuedHUNTER ROBERTS CONSTRUCTION03/27/2025
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION03/21/2025
DOB NOWSprinklersSigned-offABCO-PEERLESS SPRKLR CORP03/10/2025
DOB NOWProtection and Mechanical MethodsSigned-offPLATFORM SOLUTIONS, INC03/07/2025
DOB NOWSprinklersSigned-offLAB PLBG & HTG CO INC03/05/2025
DOB NOWGeneral ConstructionSigned-offSTRUCTURE TONE, LLC03/03/2025
DOB NOWPlumbingSigned-offLAB PLBG & HTG CO INC02/25/2025
DOB NOWGeneral ConstructionSigned-offAEROK INC01/31/2025
DOB NOWMechanical SystemsPermit IssuedAEROK INC01/30/2025
DOB NOWGeneral ConstructionSigned-offBENCHMARK BUILDERS LLC01/03/2025
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC12/27/2024
+ 60 more permits on file
8 projects · most recent 03/11/2026
Air Conditioning Systems Associated Ducts and Piping Heating Systems Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/11/2026Permit IssuedJRM CONSTRUCTION MGMT LLCAir Conditioning Systems
Cooling
Florida Heat Pump CF-036 3 tons · Heat Pump Outdoor ×1
10/15/2025Signed-offL&K PARTNERS, INCAir Conditioning Systems
Cooling
Vertiv DME044C 2 tons · Crac Unit ×1
10/14/2025Permit IssuedHUNTER ROBERTS CONSTRUCTIAir Conditioning Systems
Cooling
02/13/2025Permit IssuedAEROK INCHeating Systems, Others, Ventilation Systems
Heating
Ventilation
Other
Greenheck CSP-A390-VG 50 CFM · Exhaust Fan ×2
QEI-12 2,675 CFM · Kitchen Exhaust ×2
SQ-160-VG 1,900 CFM · Exhaust Fan ×2
11/26/2024Permit IssuedSTRUCTURE TONE, LLCAir Conditioning Systems
Cooling
— G-460VLE 406,000 BTU ×5
G-350VLE 305,000 BTU ×4
G-530VLE 462,000 BTU ×2
VVW-342-GXM 406,000 BTU ×2
AAON-SB-014-3-0E80A 99,000 BTU ×1
05/14/2021Permit IssuedPETRETTI & ASSOCIATES LLCAssociated Ducts and Piping—
05/10/2021Permit IssuedPETRETTI & ASSOCIATES LLCAssociated Ducts and Piping—
11/05/2019Permit IssuedTURNER CONSTRUCTION COMPAAir Conditioning Systems
Cooling
Climatemaster TCH072AFDAA2WSS 90,056 BTU · Packaged Unit ×1
TCH096AFDAA2WSS 90,056 BTU · Packaged Unit ×1
10 projects · most recent 06/23/2026
Sprinkler System
FiledStatusContractorScope
06/23/2026Signed-offABCO-PEERLESS SPRKLR CORP2 heads
03/11/2026Permit IssuedAGGRESSIVE FIRE PROT LLC47 heads
02/24/2026Signed-offPAR FIRE PROTECTION LLC29 heads
10/14/2025——Sprinkler System
02/05/2025Signed-offABCO-PEERLESS SPRKLR CORP—
11/26/2024Signed-offXH&RC PLBG AND HTG INC28 heads
11/20/2024Signed-offABCO-PEERLESS SPRKLR CORP2 heads
11/11/2020Signed-offABCO-PEERLESS SPRKLR CORP—
05/22/2020Permit IssuedACCURATE MECHANICAL INC20 heads
11/25/2019Permit IssuedPAR FIRE PROTECTION LLC817 heads, 3 outlets
9 projects · most recent 08/14/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/14/2026——Water/Sanitary
07/28/2026——Water/Sanitary
06/23/2026Signed-offLAB PLBG & HTG CO INCWater/Sanitary
02/24/2026———
02/24/2026Permit IssuedPAR PLUMBING CO., INCWater/Sanitary
10/14/2025Signed-offA & M WARSHAW PLUMBING &Water/Sanitary
02/05/2025Signed-offLAB PLBG & HTG CO INCWater/Sanitary
11/26/2024Permit IssuedXH&RC PLBG AND HTG INCGas, Water/Sanitary
05/22/2020Signed-offACCURATE MECHANICAL INCWater/Sanitary
25 projects · most recent 07/27/2026
General Wiring Lighting
FiledStatusContractorScope
07/27/2026Permit IssuedKNIGHT ELEC'L SERV. CORP.1 meters
03/12/2026CompleteKNIGHT ELEC'L SERV. CORP.General Wiring
02/11/2026Permit IssuedKLEINKNECHT ELEC. CO.,INCGeneral Wiring
09/08/2025CompleteKNIGHT ELEC'L SERV. CORP.1 meters
08/28/2025Permit IssuedY.S ELECTRICGeneral Wiring, Lighting
08/20/2025CompleteATLAS-ACON ELEC. SERVICEGeneral Wiring
07/30/2025Permit IssuedTEAM ELECTRIC, INCGeneral Wiring
07/02/2025CompleteATLAS-ACON ELEC. SERVICEGeneral Wiring
02/05/2025CompleteROCKMOR ELEC. ENTERPR INCGeneral Wiring
12/23/2024CancelledRIGHTWAY ELECTRICAL INCGeneral Wiring
10/21/2024Permit IssuedSTRAND ELECTRIC CO., INC.General Wiring
09/25/2024Permit IssuedKNIGHT ELEC'L SERV. CORP.1 meters
07/10/2024CompleteATLAS-ACON ELEC. SERVICEGeneral Wiring
06/17/2024Permit IssuedSTRAND ELECTRIC CO., INC.General Wiring
06/07/2024CompleteKLEINKNECHT ELEC. CO.,INCGeneral Wiring
1 project · most recent 11/03/2025
Steel
FiledStatusContractorScope
11/03/2025Signed-offPRECISE CONSTRUCTION CONRSteel
2 projects · most recent 11/03/2020
Scaffold
FiledStatusContractorScope
11/03/2020Permit IssuedPLATFORM SOLUTIONS, INCScaffold
03/11/2019Permit IssuedSAFWAY ATLANTIC, LLCScaffold
▾Field Inspections (DOB CAP) — 175
DateTypeResultReport
08/13/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/04/2026Fail-Final CND-Occupancy InspectionFailView ↗
07/01/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/24/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/19/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/16/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/14/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/08/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/25/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/06/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/13/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 175.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/07/2026Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
08/07/2026FinalThomas Lanzelottiprogress
06/25/2026Sprinkler SystemsChristopher Drutjonsspecial
06/25/2026Post-installed AnchorsChristopher Drutjonsspecial
06/16/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
06/16/2026Interior lighting powerShahrish Shuvoenergy_progress
06/16/2026Lighting controlsShahrish Shuvoenergy_progress
06/16/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
06/16/2026FinalShahrish Shuvoprogress
06/05/2026Sprinkler SystemsChristopher Drutjonsspecial
06/05/2026Post-installed AnchorsChristopher Drutjonsspecial
02/24/2026HVAC-R and service water heating system controlsHATIM ELSAIDenergy_progress
02/24/2026Lighting controlsHATIM ELSAIDenergy_progress
02/24/2026Post-installed AnchorsHATIM ELSAIDspecial
02/24/2026HVAC-R and service water heating equipmentHATIM ELSAIDenergy_progress
02/19/2026Post-installed AnchorsChristopher Drutjonsspecial
02/19/2026Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
02/19/2026Sprinkler SystemsChristopher Drutjonsspecial
01/21/2026Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
01/21/2026Interior lighting powerHATIM ELSAIDenergy_progress
01/21/2026Duct leakage testing, insulation and designHATIM ELSAIDenergy_progress
01/21/2026Sprinkler SystemsHATIM ELSAIDspecial
01/21/2026Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
01/21/2026Mechanical SystemsHATIM ELSAIDspecial
01/21/2026Energy Code Compliance InspectionsHATIM ELSAIDprogress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
CVSRetailFloor 1
Project M01417491 Alteration · Permit Entire · 07/23/2026
Moelis & CompanyOfficeFloors 4, 5
Project M01362272 Alteration · Permit Entire · 03/11/2026
Project M01362293 Alteration · Permit Entire · 03/11/2026
Project M01362306 Alteration · Permit Entire · 03/11/2026
Project M00337799 No Work · PA Certificate of Operation Issued · 07/16/2020
Project M00298671 Alteration · LOC Issued · 04/08/2020
Project M00230826 Alteration · LOC Issued · 10/04/2019
Capital GroupOfficeFloors 31–35
Project M01349655 Alteration · Permit Entire · 02/24/2026
Project M01349662 Alteration · Permit Entire · 02/24/2026
Project M01349753 Alteration · Permit Entire · 02/24/2026
Project M01349769 Alteration · Permit Entire · 02/24/2026
Project M01030190 Alteration · LOC Issued · 05/06/2024
Project M01030224 Alteration · LOC Issued · 05/06/2024
Project M01030242 Alteration · LOC Issued · 05/06/2024
Project M01030261 Alteration · LOC Issued · 05/06/2024
Project M01033833 Alteration · LOC Issued · 05/06/2024
Project M00579750 Alteration · LOC Issued · 09/27/2021
Project M00579773 Alteration · LOC Issued · 09/17/2021
Project M00579832 Alteration · LOC Issued · 09/15/2021
Blue Owl CapitalFitness / RecreationCellar, Floors 31, 36–39, Roof
Project M01258070 Alteration · LOC Issued · 08/01/2025
Project M00803993 Alteration · LOC Issued · 01/20/2023
Project M08051088 Alteration · LOC Issued · 01/20/2023
Project M00804003 Alteration · LOC Issued · 01/18/2023
Project M08051073 Alteration · LOC Issued · 01/17/2023
Project M00779761 Alteration · LOC Issued · 08/15/2022
Project M00779814 Alteration · LOC Issued · 08/15/2022
Project M00779798 Alteration · LOC Issued · 08/11/2022
Project M00779852 Alteration · LOC Issued · 08/11/2022
Project M00597258 No Work · PA Certificate of Operation Issued · 01/21/2022
Project M00629712 Alteration · LOC Issued · 01/13/2022
Project M00629749 Alteration · LOC Issued · 01/13/2022
MillenniumOfficeFloors 2, 6–10, 19
Project M01201139 Alteration · LOC Issued · 04/28/2025
Project M01182772 Alteration · LOC Issued · 02/28/2025
Project M01116915 Alteration · Permit Entire · 11/19/2024
Project M00615791 Alteration · LOC Issued · 12/09/2021
Starr InsuranceOffice—
Project M00984637 Alteration · LOC Issued · 04/12/2024
Project M00986233 Alteration · LOC Issued · 03/13/2024
Millennium WorldQuantOfficeFloors 28, 29
Project M01008773 Alteration · Permit Entire · 03/27/2024
Project M00945773 Alteration · LOC Issued · 03/19/2024
WorldQuantOfficeFloors 28, 29
Project M00945803 Alteration · LOC Issued · 03/20/2024
TetragonOfficeFloor 22
Project M00956332 Alteration · LOC Issued · 12/21/2023
First ManhattanOfficeFloors 27, 28
Project M00826602 Alteration · LOC Issued · 04/13/2023
Project M00830018 Alteration · LOC Issued · 04/12/2023
Morgan Stanley Wealth ManagementUnknown—
Project M00829119 Alteration · LOC Issued · 03/13/2023
Black Seed BagelsRestaurant / Food ServiceGround
Project M07993650 Alteration · Permit Entire · 10/27/2022
LexingtonPartnersOffice—
Project M00705338 Alteration · LOC Issued · 05/20/2022
The Jordan CompanyOfficeFloor 30
Project M00620799 Alteration · LOC Issued · 12/09/2021
Project M00620699 Alteration · LOC Issued · 12/03/2021
BeatnicRestaurant / Food ServiceFloors 1–5
Project M00556936 Alteration · LOC Issued · 08/05/2021
Millennium PartnersOfficeFloors 6–10
Project M00226628 Alteration · LOC Issued · 10/17/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 7,963 on file (BIS + DOB NOW)
▸Plans & Drawings321
▸DOB NOWPlans/Sketch207
09/03/2026M00509413-I1Request digital key ↗
Showing 1 of 207 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler29
09/05/2026M00207044-I1Request digital key ↗
09/05/2026M00260669-I1Request digital key ↗
09/05/2026M00200750-I1Request digital key ↗
Showing 3 of 29 on file for this type
▸DOB NOWPlans/Sketch - Plumbing27
09/05/2026M00207044-I1Request digital key ↗
09/05/2026M00196234-I1Request digital key ↗
09/05/2026M00226603-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems25
09/05/2026M00196196-I1Request digital key ↗
09/05/2026M00226595-I1Request digital key ↗
09/05/2026M00226625-S1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Standpipe11
09/05/2026M00230824-I1Request digital key ↗
09/05/2026M00200750-S1Request digital key ↗
09/05/2026M00226607-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Structural8
09/05/2026M00230826-I1Request digital key ↗
09/05/2026M00226628-I1Request digital key ↗
09/05/2026M00234857-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sign4
09/05/2026M00153602-I1Request digital key ↗
09/05/2026M00153605-I1Request digital key ↗
09/05/2026M00153601-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly4
09/04/2026M00337799-I1Request digital key ↗
Showing 1 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/05/2026M00139624-I1Request digital key ↗
09/05/2026M00271734-I1Request digital key ↗
09/04/2026M00422952-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits1,379
▸BISPLAN / WORK APPROVAL APPLICATION826
10/20/2025101116953Open ↗
04/07/2025140828406Open ↗
04/07/2025123661457Open ↗
Showing 3 of 826 on file for this type
▸BISWORK PERMIT APPLICATION538
09/03/2024122883665Open ↗
Showing 1 of 538 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPLACE OF ASSEMBLY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Seals & Professional Certifications2,406
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1,000
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1,000 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature306
09/05/2026M00153601-I1Open ↗
09/05/2026M00207044-I1Open ↗
09/05/2026M00196234-I1Open ↗
Showing 3 of 306 on file for this type
▸DOB NOWProgress Inspector Seal & Signature261
09/29/2026M00525061-P1Open ↗
09/28/2026M00597258-I1Open ↗
09/23/2026M00235148-I1Open ↗
Showing 3 of 261 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature254
09/29/2026M00525061-P1Open ↗
09/29/2026M00525061-P1Open ↗
09/29/2026M00558686-P1Open ↗
Showing 3 of 254 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST218
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 218 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT205
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 205 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM110
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 110 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISPC FULL REPORT15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸Trade Schedules & Equipment563
▸BISSELF-CERT PLUMBING NOTICE150
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 150 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE125
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 125 on file for this type
▸BISSCHEDULE B - PLUMBING104
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 104 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA83
02/14/2025123144855Open ↗
07/12/2023123735164Open ↗
Showing 2 of 83 on file for this type
▸BISEQUIPMENT USE PERMITS56
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 56 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8520
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Environmental & Asbestos622
▸DOB NOWDEP ACP-5: Asbestos Assessment Report286
09/05/2026M00153601-I1Open ↗
09/05/2026M00207044-I1Open ↗
09/05/2026M00196234-I1Open ↗
Showing 3 of 286 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)226
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 226 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'103
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 103 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance361
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS178
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 178 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS47
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 47 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY35
08/04/2023123856130Open ↗
07/12/2023123856130Open ↗
06/06/2023123571562Open ↗
Showing 3 of 35 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)19
08/22/2023140975407Open ↗
08/22/2023140940702Open ↗
08/08/2023123856130Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.14
09/04/2026M00347722-I1Open ↗
Showing 1 of 14 on file for this type
▸BISTR8: Energy Code Progress Inspections12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS11
06/13/2023123704232Open ↗
06/12/2023123662928Open ↗
06/06/2023123571562Open ↗
Showing 3 of 11 on file for this type
▸BISLIGHTING CONTROLS9
06/06/2023123571562Open ↗
06/06/2023140939652Open ↗
06/06/2023123215804Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISINTERIOR LIGHTING POWER8
06/06/2023123571562Open ↗
06/06/2023123215804Open ↗
05/03/2023123447742Open ↗
Showing 3 of 8 on file for this type
▸BIS* HVAC INSULATION AND SEALING7
06/12/2023123662928Open ↗
06/09/2023123704232Open ↗
06/06/2023123571562Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Inspections & Test Reports153
▸BISTECHNICAL REPORT: RESPONSIBILITY109
06/06/2023123785216Open ↗
06/06/2023123571562Open ↗
06/06/2023140939652Open ↗
Showing 3 of 109 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)11
03/19/2024140940702Open ↗
06/13/2023123704232Open ↗
06/12/2023123662928Open ↗
Showing 3 of 11 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION6
06/13/2023123704232Open ↗
06/06/2023123215804Open ↗
05/03/2023123447742Open ↗
Showing 3 of 6 on file for this type
▸BISMECHANICAL SYSTEMS6
06/13/2023123704232Open ↗
06/12/2023123662928Open ↗
06/06/2023123215804Open ↗
Showing 3 of 6 on file for this type
▸BISSPRAYED FIRE-RESISTANT MATERIALS6
01/14/2026123524855Open ↗
08/22/2023140940702Open ↗
06/12/2023123662928Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs528
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST277
10/15/2024123726762Open ↗
10/15/2024123725567Open ↗
10/15/2024140939652Open ↗
Showing 3 of 277 on file for this type
▸BISADMINISTRATIVE OBJECTIONS139
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 139 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE35
06/09/2023122649642Open ↗
05/09/2023122649642Open ↗
04/20/2023122649642Open ↗
Showing 3 of 35 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸BISFINAL25
02/19/2025140975407Open ↗
02/19/2025140940702Open ↗
07/12/2023123856130Open ↗
Showing 3 of 25 on file for this type
▸BISSUPERSEDING LETTER9
09/03/2024122883665Open ↗
Showing 1 of 9 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership657
▸BISCOST AFFIDAVIT624
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 624 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW333
10/09/2024123785216Open ↗
10/09/2024123571562Open ↗
10/09/2024123725567Open ↗
Showing 3 of 33 on file for this type
▸Filing & Intake Forms826
▸BISEFILING COVER SHEET389
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 389 on file for this type
▸BISBOROUGH INTAKE FORM264
09/03/2024122883665Open ↗
Showing 1 of 264 on file for this type
▸BISADDITIONAL INFORMATION142
07/27/2023122649642Open ↗
Showing 1 of 142 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸Other Documents50
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸DOB NOWAlternate Plan 32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWSupporting Document1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type