ECB07/28/2026AS PER PREVIOUS REQUEST FOR CORRECTIVE ACTION ISSUED ON 03/24/2026 BY BADGE 3639 FOR OCCUPANCY CONTRARY TO BUILDINGS DEPT RECORDS : AT TIME OF INSPECTION AT BASEMENT ,SET UP WITH 2 BEDROOMS (OCCUPIED), AND ANOT$1K due
Two family frame · 3,000 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.