Elevator apt, fireproof with stores
One Astoria Cove
4-34 26 AVENUE · BIN 4801909
💬 Discuss this project
2024Year Built
7Stories
D6Building Class
R7AZoning
102,098 sfGross Floor Area
63Units
0 Open Violations
Elevator apt, fireproof with stores · Owner of record: KS ASTORIA HOLDINGS LLC · 28,657 sf lot · 3.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction12p · 4 filings · 20 docs
Bulkhead1p · 1 filing · 4 docs
Floor 8Under Construction12p · 3 filings · 20 docs
Floor 7Under Construction12p · 3 filings · 20 docs
Floor 6Under Construction12p · 2 filings · 20 docs
Floor 5Under Construction12p · 2 filings · 20 docs
Floor 4Under Construction106p · 3 filings · 20 docs
Floor 3Under Construction13p · 3 filings · 20 docs
Floor 2Under Construction110p · 3 filings · 20 docs
Floor 1Under Construction111p · 3 filings · 20 docs
CellarUnder Construction12p · 3 filings · 20 docs
Sub-CellarUnder Construction80p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CAPE ADVISORS1507/30/2026
YNH CONSTRUCTION NY1807/08/2026
SLIM ASTORIA 24683007/08/2026
OWNERS REP704/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/12/2014$3.5M—RAYAN REALTY CORP. → 2030 ASTORIA DEVELOPERS LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.2403/21/2026
ADVANCED BUILDERS SERVICES903/21/2026
A1 EXPEDITING SERVICE203/21/2026
GEIGER E A GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YNH CONSTRUCTION NY LLCGeneral Contractor1607/30/2026
TRISTATE FIRE SPRINK INCFire Protection607/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor507/08/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
ANT YAPI CIVIC NY LLCGeneral Contractor207/08/2026
GWT ENTERPRISES INCGeneral Contractor204/08/2026
POWER DIRECT ELECTRIC INCElectrical203/22/2026
SOLAS ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161007/09/2026
SHAHRISH SHUVO ENGINEERIN8524111/09/2023
SPECIAL TESTING & CONSULT1688306/01/2022
Building Lifecycle
All (193)Filed (25)Permit Issued (29)Signed Off (12)Violation (3)Inspection (20)Objection (71)Special Inspection (30)Tax Incentive (3)
06/15/2031
421-a(16) construction completed
09/11/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
08/20/2026
Signed off — Alteration
Construct 8 ft plywood fence Beyond Curb line
Q00955872-I1
08/06/2026
Signed off — Alteration
Install SOE solely for a limited structural foundation element in conjunction with NB# Q00646746 to vest into 421-a
Q00715428-I1
07/31/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/31/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/29/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY DRY FIRE STANDPIPE SYSTEM FILED IN CONJUNCTION WITH NB# Q00646746-l1.
Q00941068-I1
07/29/2026
Signed off — Alteration
Install SOE solely for a limited structural foundation element in conjunction with NB# Q00646746 to vest into 421-a
Q00715428-S1
07/29/2026
Signed off — Alteration
Sprinkler / Standpipe application filed in conjunction with NB GC, job number: Q00646746-I1.
Q00938741-I1
07/09/2026
Filed — New Building
Curb Cut application filed subsequent to NB GC, job number: Q00646746-I1.
Q00646746-P6
07/07/2026
Signed off — New Building
Curb Cut application filed subsequent to NB GC, job number: Q00646746-I1.
Q00646746-S2
07/07/2026
Permit issued — Support of Excavation
Q00715428-S1-SE
07/06/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/02/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
07/01/2026
Permit issued — Foundation
Q00646746-S2-FO
06/26/2026
Permit issued — Foundation
Q00715428-I1-FO
06/22/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
06/17/2026
Signed off — New Building
Curb Cut application filed subsequent to NB GC, job number: Q00646746-I1.
Q00646746-S3
06/05/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/26/2026
Permit issued — Construction Fence
Q00955872-I1-FN
05/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/24/2026
Special inspection requirement — Standpipe Systems
FAHAD FATEH
05/24/2026
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
05/13/2026
Filed — Alteration
Sprinkler / Standpipe application filed in conjunction with NB GC, job number: Q00646746-I1.
Q00938741-P1
05/07/2026
Permit issued — Support of Excavation
Q00646746-S3-SE
05/05/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/04/2026
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
05/04/2026
Special inspection requirement — Standpipe Systems
FAHAD FATEH
04/23/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
02/18/2026
Permit issued — Curb Cut
Q00646746-Z6-CC
02/17/2026
Signed off — New Building
Curb Cut application filed subsequent to NB GC, job number: Q00646746-I1.
Q00646746-Z2
01/27/2026
Permit issued — Sprinklers
Q00938741-I1-EW-SD
01/27/2026
Permit issued — Standpipe
Q00938741-I1-EW-SP
01/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/16/2025
Permit issued — Standpipe
Q00941068-I1-EW-SD
12/12/2025
Signed off — New Building
Curb Cut application filed subsequent to NB GC, job number: Q00646746-I1.
Q00646746-Z3
11/20/2025
Permit issued — Plumbing
Q00646746-S9-PL
11/17/2025
Filed — New Building
Curb Cut application filed subsequent to NB GC, job number: Q00646746-I1.
Q00646746-Z6
11/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/16/2025
Objection resolved — Addressed
10/16/2025
Objection resolved — Addressed
10/09/2025
Special inspection requirement — Metering
FAHAD FATEH
10/09/2025
Special inspection requirement — Energy Code Compliance Inspections
10/09/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
10/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
10/09/2025
Special inspection requirement — Air barrier continuity plan testing
FAHAD FATEH
10/09/2025
Special inspection requirement — Vestibules
FAHAD FATEH
10/09/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
10/09/2025
Special inspection requirement — Energy Code Compliance Inspections
10/09/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Sean DiBartolo
10/09/2025
Special inspection requirement — Air barrier continuity plan testing
FAHAD FATEH
10/09/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
10/09/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
10/09/2025
Special inspection requirement — Vestibules
FAHAD FATEH
10/09/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
10/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
10/09/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
Latest 60 of 193 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationSigned-offYNH CONSTRUCTION NY LLC07/07/2026
DOB NOWFoundationSigned-offYNH CONSTRUCTION NY LLC07/01/2026
DOB NOWFoundationSigned-offYNH CONSTRUCTION NY LLC06/26/2026
DOB NOWConstruction FenceSigned-offYNH CONSTRUCTION NY LLC05/26/2026
DOB NOWSupport of ExcavationSigned-offYNH CONSTRUCTION NY LLC05/07/2026
DOB NOWCurb CutPermit IssuedYNH CONSTRUCTION NY LLC02/18/2026
DOB NOWSprinklersSigned-offTRISTATE FIRE SPRINK INC01/27/2026
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC01/27/2026
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC12/16/2025
DOB NOWPlumbingPermit IssuedPRIME PIPING & HEATING IN11/20/2025
DOB NOWConstruction FenceSigned-offYNH CONSTRUCTION NY LLC05/27/2025
DOB NOWGeneral ConstructionPermit IssuedYNH CONSTRUCTION NY LLC05/06/2025
DOB NOWFoundationSigned-offYNH CONSTRUCTION NY LLC02/11/2025
DOB NOWMechanical SystemsSigned-offYNH CONSTRUCTION NY LLC02/06/2025
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC01/28/2025
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC01/28/2025
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC12/17/2024
DOB NOWProtection and Mechanical MethodsSigned-offGWT ENTERPRISES INC12/13/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC12/11/2024
DOB NOWGeneral ConstructionPermit IssuedYNH CONSTRUCTION NY LLC11/29/2024
DOB NOWStructuralSigned-offYNH CONSTRUCTION NY LLC11/26/2024
DOB NOWPlumbingPermit IssuedPRIME PIPING & HEATING IN11/25/2024
DOB NOWSupport of ExcavationSigned-offYNH CONSTRUCTION NY LLC10/15/2024
DOB NOWFoundationSigned-offYNH CONSTRUCTION NY LLC10/10/2024
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC03/14/2024
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC03/16/2023
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC06/02/2022
DOB NOWSupport of ExcavationSigned-offANT YAPI CIVIC NY LLC06/01/2022
DOB NOWFoundationSigned-offANT YAPI CIVIC NY LLC05/20/2022
1 project · most recent 07/09/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/09/2026Signed-offYNH CONSTRUCTION NY LLCHeating and Air Conditioning Systems
Heat / Cool
Lg RXYQ120TTJU 10 tons · Vrf Outdoor ×4
RXYQ192TTJU 16 tons · Vrf Outdoor ×4
RXYQ96TTJU 8 tons · Vrf Outdoor ×3
RZQ24TAVJUA 2 tons · Vrf Outdoor ×2
RXYQ240TTJU 24 tons · Vrf Outdoor ×1
1 project · most recent 05/13/2026
FiledStatusContractorScope
05/13/2026Signed-offTRISTATE FIRE SPRINK INC—
1 project · most recent 07/09/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/09/2026Permit IssuedPRIME PIPING & HEATING INGas, Storm, Water/Sanitary
8 projects · most recent 06/17/2026
General Wiring
FiledStatusContractorScope
06/17/2026Permit IssuedEQUAL ELECTRICAL CONT INCGeneral Wiring
01/29/2026Permit IssuedPOWER DIRECT ELECTRIC INC142 meters, 142 new_meters
11/11/2025Permit IssuedPOWER DIRECT ELECTRIC INC—
12/24/2024CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
12/24/2024Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
12/24/2024CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
12/24/2024CompletePOWER DIRECT ELECTRIC INC—
12/16/2024Permit IssuedSOLAS ELECTRICAL CORP—
2 projects · most recent 07/09/2026
Steel Concrete
FiledStatusContractorScope
07/09/2026Signed-offYNH CONSTRUCTION NY LLCSteel, Concrete
06/01/2022Signed-offYNH CONSTRUCTION NY LLC4 scope_items
1 project · most recent 11/06/2023
Fence
FiledStatusContractorScope
11/06/2023Signed-offYNH CONSTRUCTION NY LLCFence
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
09/11/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
07/31/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/31/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/06/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/22/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
06/05/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/05/2026Fail-Final CND-Occupancy InspectionFailView ↗
04/23/2026Fail-Final CND-Occupancy InspectionFailView ↗
01/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/08/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/25/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/31/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
01/31/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
12/31/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/31/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 107
DateRequirementInspectorRole
07/02/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
05/24/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/24/2026Standpipe SystemsFAHAD FATEHspecial
05/24/2026Sprinkler SystemsFAHAD FATEHspecial
05/04/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/04/2026Standpipe SystemsFAHAD FATEHspecial
05/04/2026Sprinkler SystemsFAHAD FATEHspecial
10/09/2025Exterior lighting powerFAHAD FATEHenergy_progress
10/09/2025Lighting controlsFAHAD FATEHenergy_progress
10/09/2025Air barrier continuity plan testingFAHAD FATEHenergy_progress
10/09/2025MeteringFAHAD FATEHenergy_progress
10/09/2025VestibulesFAHAD FATEHenergy_progress
10/09/2025Air barrier continuity plan testingFAHAD FATEHenergy_progress
10/09/2025Energy Code Compliance Inspections—progress
10/09/2025Fire-Resistance Rated Construction—progress
10/09/2025Wall Panels, Curtain Walls, and Veneers—special
10/09/2025Fire-Resistant Penetrations and Joints—special
10/09/2025Subsurface Investigations (Borings/Test Pits)Sean DiBartolospecial
10/09/2025Fenestration areasFAHAD FATEHenergy_progress
10/09/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
10/09/2025VestibulesFAHAD FATEHenergy_progress
10/09/2025Lighting controlsFAHAD FATEHenergy_progress
10/09/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
10/09/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
10/09/2025Electrical motors and elevatorsFAHAD FATEHenergy_progress
Latest 25 of 107.
▾Documents — 148 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
08/26/2026Q00715428-S1Request digital key ↗
08/26/2026Q00715428-I1Request digital key ↗
08/26/2026Q00715428-P1Request digital key ↗
Showing 3 of 26 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
09/08/2025440821648Open ↗
01/28/2025440821648Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
11/14/2025440821648Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00646746-I1Open ↗
08/13/2026Q00646746-P2Open ↗
08/13/2026Q00646746-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026Q00646746-P2Open ↗
08/13/2026Q00646746-P4Open ↗
08/13/2026Q00646746-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00646746-I1Open ↗
▸Seals & Professional Certifications58
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/26/2026Q00715428-I1Open ↗
08/26/2026Q00715428-S1Open ↗
08/26/2026Q00715428-P1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/07/2026Q00715428-I1Open ↗
09/07/2026Q00715428-I1Open ↗
09/01/2026Q00938741-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/07/2026Q00715428-I1Open ↗
09/01/2026Q00715428-P2Open ↗
08/29/2026Q00646746-P4Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/28/2025440821648Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/28/2025440821648Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q00646746-P4Open ↗
08/13/2026Q00646746-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026Q00646746-I1—
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist4
08/13/2026Q00646746-I1Open ↗
08/13/2026Q00646746-P3Open ↗
08/13/2026Q00646746-P2Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
11/13/2025440821648Open ↗
▸BISSTREET TREE CHECKLIST1
11/13/2025440821648Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00646746-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/21/2026Q00646746-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWOER: Notice to Proceed8
08/13/2026Q00646746-I1Open ↗
08/13/2026Q00646746-Z2Open ↗
08/13/2026Q00646746-S3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/26/2026Q00715428-I1Open ↗
08/26/2026Q00715428-S1Open ↗
08/21/2026Q00646746-S2Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
01/28/2025440821648Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/21/2026Q00646746-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/13/2026Q00646746-P2Open ↗
08/13/2026Q00646746-P3Open ↗
08/13/2026Q00646746-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWConcrete Testing Exception Report1
08/13/2026Q00646746-Z3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00646746-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/18/2025440821648Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
01/28/2025440821648Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
11/13/2025440821648Open ↗
▸Other Documents18
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/21/2026Q00646746-I1Open ↗
08/13/2026Q00646746-P2Open ↗
08/13/2026Q00646746-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification4
08/21/2026Q00646746-P4Open ↗
08/21/2026Q00646746-P3Open ↗
08/21/2026Q00646746-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026Q00646746-P2Open ↗
08/13/2026Q00646746-I1Open ↗
08/13/2026Q00646746-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00715428-S1Open ↗
08/13/2026Q00646746-S3Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
11/13/2025440821648Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
11/13/2025440821648Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00646746-I1Open ↗