← Back
BuildNYC
Zoned commercial or Manhattan residential
Astoria Cove
4-42 26TH AVENUE · BIN 4020640
💬 Discuss this project
0Year Built
—Stories
V1Building Class
R7AZoning
0 sfGross Floor Area
0Units
0 Active Violations
Zoned commercial or Manhattan residential · Owner of record: KS Astoria Holdings · 36,580 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNew 6-story Residential Building with PenthouseUnder Construction132p · 4 filings · 20 docs
BulkheadNew 6-story Residential Building with PenthouseUnder Construction4p · 1 filing · 20 docs
PenthouseNew 6-story Residential Building with PenthouseUnder Construction103p · 3 filings · 20 docs
Floor 6New 6-story Residential Building with PenthouseUnder Construction133p · 3 filings · 20 docs
Floor 5New 6-story Residential Building with PenthouseUnder Construction130p · 3 filings · 20 docs
Floor 4New 6-story Residential Building with PenthouseUnder Construction134p · 4 filings · 20 docs
Floor 3New 6-story Residential Building with PenthouseUnder Construction127p · 3 filings · 20 docs
Floor 2New 6-story Residential Building with PenthouseUnder Construction127p · 3 filings · 20 docs
Floor 1New 6-story Residential Building with PenthouseUnder Construction131p · 3 filings · 20 docs
CellarAstoria Cove Phase I, LLCUnder Construction123p · 4 filings · 20 docs
Sub-CellarAstoria Cove Phase I, LLC9p · 1 filing · 16 docs
Site & exteriorAstoria Cove Phase I, LLCUnder Construction50p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Slim Astoria2407/08/2026
Cape Advisors1807/08/2026
Alma Realty203/21/2026
KS Astoria103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution1003/21/2026
J.A.M. Associates1803/21/2026
Advanced Builders Services1003/21/2026
A1 Expediting Service203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YNH Construction NYGeneral Contractor1807/08/2026
Core Scaffold SystemsScaffold804/09/2026
UpstrateGeneral Contractor404/09/2026
Arsenal ScaffoldScaffold307/08/2026
Prime Piping & HeatingFire Protection206/28/2026
Ant Yapi Civic NYGeneral Contractor207/08/2026
Highlevel GroupGeneral Contractor204/09/2026
Prime Piping & HeatingPlumbing207/08/2026
Power Direct ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161006/23/2026
Ettinger Commissioning7384111/09/2023
Special Testing & Consulting1688205/23/2022
Building Lifecycle
All (192)Filed (25)Permit Issued (30)Signed Off (10)Violation (4)Inspection (11)Objection (79)Special Inspection (30)Tax Incentive (3)
06/15/2031
421-a(16) construction completed
10/08/2026
Signed off — New Building
Underpinning filed inconjunction with NB # Q00646751-l1 and SOE filing #Q00646751-S2.
Q00646751-S4
08/24/2026
Objection resolved — Resolved
08/21/2026
Objection raised — Other
07/16/2026
Objection raised — Other
07/16/2026
Objection resolved — Resolved
07/15/2026
Objection resolved — Resolved
07/14/2026
Objection raised — Other
07/02/2026
Objection resolved — Resolved
07/01/2026
Objection resolved — Resolved
06/30/2026
Objection raised — Other
06/30/2026
Objection raised — Other
06/24/2026
Signed off — Alteration
INSTALL FOUNDATION ELEMENT INCONJUNCTION WITH NB#Q00646751 FILING AND SOLELY FOR A LIMITED STRUCTURAL ELEMENT TO VEST INTO 421-a.
Q00715436-I1
06/23/2026
Filed — Alteration
Sprinkler / Standpipe application filed in conjunction with NB GC, job number: Q00646751-I1. Wet / Manual, Class I Standpipe system.
Q00938050-P1
06/18/2026
Filed — New Building
Underpinning filed inconjunction with NB # Q00646751-l1 and SOE filing #Q00646751-S2.
Q00646751-P9
06/17/2026
Signed off — Alteration
INSTALL FOUNDATION ELEMENT INCONJUNCTION WITH NB#Q00646751 FILING AND SOLELY FOR A LIMITED STRUCTURAL ELEMENT TO VEST INTO 421-a.
Q00715436-S2
06/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/17/2026
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
06/17/2026
Special inspection requirement — Standpipe Systems
FAHAD FATEH
06/15/2026
Violation issued (ECB, closed)
Unknown
06/10/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/15/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/15/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
05/13/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
05/13/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/13/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
05/12/2026
Signed off — New Building
Underpinning filed inconjunction with NB # Q00646751-l1 and SOE filing #Q00646751-S2.
Q00646751-S8
05/11/2026
Signed off — New Building
Underpinning filed inconjunction with NB # Q00646751-l1 and SOE filing #Q00646751-S2.
Q00646751-S2
05/08/2026
Permit issued — Mechanical Systems
Q00646751-S4-MS
04/28/2026
Permit issued — Plumbing
Q00646751-S5-PL
02/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/05/2026
Permit issued — General Construction
Q00646751-I1-GC
01/12/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01280689-I1
01/12/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01261954-I1
01/12/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01243200-I1
01/12/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01243165-I1
12/17/2025
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
12/17/2025
Special inspection requirement — Metering
FAHAD FATEH
12/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
12/17/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
12/17/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
12/17/2025
Special inspection requirement — Air barrier continuity plan testing
FAHAD FATEH
12/17/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
12/17/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Ira Beer
12/17/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/17/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
12/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
12/17/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
FAHAD FATEH
12/17/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
12/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/17/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
12/17/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
12/17/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
12/17/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
12/17/2025
Special inspection requirement — Vestibules
FAHAD FATEH
11/27/2025
Filed — New Building
Underpinning filed inconjunction with NB # Q00646751-l1 and SOE filing #Q00646751-S2.
Q00646751-P7
10/11/2025
Violation issued (ECB, closed)
Unknown
09/29/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Ira Beer
09/29/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
09/29/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
Latest 60 of 192 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offYNH Construction NY05/08/2026
DOB NOWPlumbingPermit IssuedPrime Piping & Heating04/28/2026
DOB NOWGeneral ConstructionPermit IssuedYNH Construction NY02/05/2026
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems09/25/2025
DOB NOWSupport of ExcavationSigned-offYNH Construction NY09/05/2025
DOB NOWFoundationSigned-offYNH Construction NY08/22/2025
DOB NOWSupport of ExcavationSigned-offYNH Construction NY08/22/2025
DOB NOWStructuralSigned-offYNH Construction NY08/22/2025
DOB NOWFoundationPermit IssuedYNH Construction NY08/22/2025
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems07/29/2025
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems06/20/2025
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems06/20/2025
DOB NOWSprinklersPermit IssuedAmb Mechanical05/28/2025
DOB NOWStandpipePermit IssuedAmb Mechanical05/28/2025
DOB NOWGeneral ConstructionPermit IssuedYNH Construction NY05/14/2025
DOB NOWPlumbingPermit IssuedPrime Piping & Heating05/01/2025
DOB NOWGeneral ConstructionPermit IssuedYNH Construction NY01/16/2025
DOB NOWSupport of ExcavationSigned-offYNH Construction NY01/03/2025
DOB NOWStructuralSigned-offYNH Construction NY11/29/2024
DOB NOWFoundationPermit IssuedYNH Construction NY11/29/2024
DOB NOWFoundationPermit IssuedUpstrate07/31/2024
DOB NOWFoundationSigned-offUpstrate05/24/2024
DOB NOWSupport of ExcavationSigned-offUpstrate05/24/2024
DOB NOWConstruction FenceSigned-offArsenal Scaffold03/14/2024
DOB NOWFoundationSigned-offHighlevel Group11/30/2023
DOB NOWSupport of ExcavationSigned-offHighlevel Group11/01/2023
DOB NOWConstruction FenceSigned-offArsenal Scaffold03/16/2023
DOB NOWConstruction FenceSigned-offArsenal Scaffold06/02/2022
DOB NOWSupport of ExcavationSigned-offAnt Yapi Civic NY06/01/2022
DOB NOWFoundationSigned-offAnt Yapi Civic NY05/20/2022
1 project · most recent 06/23/2026
FiledStatusContractorScope
06/23/2026Permit IssuedPrime Piping & Heating—
1 project · most recent 06/18/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/18/2026Permit IssuedPrime Piping & HeatingStorm, Water/Sanitary
7 projects · most recent 02/19/2026
General Wiring
FiledStatusContractorScope
02/19/2026Permit IssuedPower Direct Electric109 meters, 109 new_meters
08/21/2025Permit IssuedPower Direct ElectricGeneral Wiring
08/21/2025Permit IssuedPower Direct ElectricGeneral Wiring
08/21/2025Permit IssuedPower Direct Electric—
06/26/2025CompleteSolas Electrical—
05/01/2025Permit IssuedPower Direct Electric—
04/29/2025CancelledPower Direct Electric—
1 project · most recent 06/18/2026
Steel Concrete
FiledStatusContractorScope
06/18/2026Signed-offYNH Construction NYSteel, Concrete
1 project · most recent 11/06/2023
Fence
FiledStatusContractorScope
11/06/2023——Fence
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
06/10/2026Pass-Final Boiler Equipment InspectionPassView ↗
05/15/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/15/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/13/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
05/13/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/13/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
09/12/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/06/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/06/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 106
DateRequirementInspectorRole
06/17/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/17/2026Sprinkler SystemsFAHAD FATEHspecial
06/17/2026Standpipe SystemsFAHAD FATEHspecial
12/17/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/17/2025Wall Panels, Curtain Walls, and VeneersFAHAD FATEHspecial
12/17/2025Subsurface Investigations (Borings/Test Pits)Ira Beerspecial
12/17/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/17/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
12/17/2025VestibulesFAHAD FATEHenergy_progress
12/17/2025Lighting controlsFAHAD FATEHenergy_progress
12/17/2025Air barrier continuity plan testingFAHAD FATEHenergy_progress
12/17/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
12/17/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
12/17/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
12/17/2025Exterior lighting powerFAHAD FATEHenergy_progress
12/17/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
12/17/2025Fenestration air leakageFAHAD FATEHenergy_progress
12/17/2025Fenestration areasFAHAD FATEHenergy_progress
12/17/2025MeteringFAHAD FATEHenergy_progress
12/17/2025Interior lighting powerFAHAD FATEHenergy_progress
12/17/2025Electrical motors and elevatorsFAHAD FATEHenergy_progress
12/17/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
09/29/2025Exterior lighting powerFAHAD FATEHenergy_progress
09/29/2025Fenestration areasFAHAD FATEHenergy_progress
09/29/2025MeteringFAHAD FATEHenergy_progress
Latest 25 of 106.
▾Documents — 155 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
08/26/2026Q00646751-S6Request digital key ↗
08/26/2026Q00646751-P7Request digital key ↗
08/26/2026Q00646751-P5Request digital key ↗
Showing 3 of 25 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
03/02/2026421374925Open ↗
09/12/2025440821657Open ↗
01/28/2025440821657Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
09/15/2025440821657Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram4
08/26/2026Q00646751-P2Open ↗
08/15/2026Q00646751-I1Open ↗
08/15/2026Q00646751-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/26/2026Q00646751-P2Open ↗
08/15/2026Q00646751-I1Open ↗
08/15/2026Q00646751-P3Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
09/21/2016421374925Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026Q00646751-I1Open ↗
▸Seals & Professional Certifications62
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/26/2026Q00646751-P9Open ↗
08/26/2026Q00646751-P7Open ↗
08/26/2026Q00646751-P5Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/23/2026Q00715436-I1Open ↗
09/23/2026Q00715436-I1Open ↗
09/01/2026Q00646751-S8Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026Q00715436-I1Open ↗
09/01/2026Q00646751-S8Open ↗
08/31/2026Q00646751-I1Open ↗
Showing 3 of 14 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/28/2025440821657Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/28/2025440821657Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist4
08/26/2026Q00646751-P7Open ↗
08/26/2026Q00646751-P2Open ↗
08/15/2026Q00646751-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
11/24/2025440821657Open ↗
09/15/2025440821657Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/24/2025440821657Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026Q00646751-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026Q00646751-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWOER: Notice to Proceed7
08/15/2026Q00646751-I1Open ↗
08/13/2026Q00646751-S2Open ↗
08/13/2026Q00646751-S8Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
08/26/2026Q00646751-S8Open ↗
08/26/2026Q00715436-I1Open ↗
08/26/2026Q00715436-S2Open ↗
Showing 3 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
01/28/2025440821657Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/15/2026Q00646751-I1Open ↗
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT7
08/26/2026Q00646751-P2Open ↗
08/15/2026Q00646751-I1Open ↗
08/15/2026Q00646751-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/15/2026Q00646751-I1Open ↗
08/13/2026Q00646751-S2Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/15/2025440821657Open ↗
▸Filing & Intake Forms3
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/15/2025440821657Open ↗
▸BISEFILING COVER SHEET1
09/21/2016421374925Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/28/2025440821657Open ↗
▸Other Documents17
▸DOB NOWSite Survey: Initial4
08/26/2026Q00646751-P2Open ↗
08/15/2026Q00646751-I1Open ↗
08/15/2026Q00646751-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/26/2026Q00646751-P2Open ↗
08/15/2026Q00646751-I1Open ↗
08/15/2026Q00646751-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/26/2026Q00646751-P7Open ↗
08/26/2026Q00646751-P2Open ↗
08/15/2026Q00646751-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00646751-S2Open ↗
08/13/2026Q00715436-S2Open ↗
▸BISCURB CUT: PROVIDE EXISTING NUMBER1
11/24/2025440821657Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
11/24/2025440821657Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/15/2026Q00646751-I1Open ↗