Multi-story retail building (2+)
Trump Tower
4 EAST 57 STREET · Midtown-Times Square · BIN 1035791
💬 Discuss this project
1996Year Built
8Stories
K2Building Class
C5-3Zoning
26,983 sfGross Floor Area
2Units
LL97 Covered69 Open Violations 68 unresolved · 1 paperwork only ▸FISP: SAFE
Multi-story retail building (2+) · Owner of record: 4-6 E. 57TH STREET ASSOCIATES · 5,020 sf lot · 5.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscapeCivilGeneral
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 20 docs
Floor 8Under Construction69p · 2 filings · 20 docs
Floor 7Under Construction69p · 2 filings · 20 docs
Floor 6Under Construction69p · 2 filings · 20 docs
Floor 5Under Construction74p · 3 filings · 20 docs
Floor 4Under Construction78p · 2 filings · 20 docs
Floor 3Under Construction72p · 3 filings · 20 docs
Floor 2Under Construction68p · 2 filings · 20 docs
Floor 1Under Construction71p · 2 filings · 20 docs
CellarUnder Construction67p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LVMH5209/13/2026
SL GREEN REALTY307/08/2026
TIFFANY&CO503/22/2026
4-6 E. 57TH STREET ASSOCIATES303/22/2026
NIKE REALTY SERVICES103/22/2026
46 E 57 ST ASSOC103/22/2026
SCIAME CONSTRUCTION MA103/22/2026
THE TRUMP ORGANIZATION103/22/2026
4 8 57TH STREET ASSOCIATE103/22/2026
TRUMP303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHRISTOPHER CARRANO108/25/2026
ROSINI ENGINEERING, PC1707/15/2026
TOHFAZ UDDIN PE PC109/19/2025
ANDREW FORMICHELLA111/08/2024
BRAND ACCESS SOLUTIONS507/16/2024
SYNC ARCHITECTURE P.C204/26/2023
WSP101/17/2020
SAFWAY ATLANTIC LLC108/26/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE1203/21/2026
OUTSOURCE CONSULTANTS, INC.3103/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
SPRING SCAFFOLDING LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAFWAY ATLANTIC, LLCGeneral Contractor1307/08/2026
SCIAME CONSTRUCTION LLCGeneral Contractor1207/08/2026
DOMINICK CATELLOElectrical403/21/2026
PAR PLUMBING CO., INCPlumbing207/08/2026
WINICK PRODUCTIONS, LLCGeneral Contractor203/21/2026
SIRINA FIRE PROT CORPFire Protection107/08/2026
JOSEPH SORTINOElectrical103/21/2026
CHARLES SCHMITTElectrical103/21/2026
SPRING SCAFFOLDING LLCGeneral Contractor104/09/2026
ALBERT VITALEElectrical103/21/2026
MEGA PLBG CORPPlumbing107/08/2026
MEGA PLBG CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT28271707/15/2026
RYAN SPECIAL ENGINEERING2018104/19/2023
CROSSCHECK INSPECTION SER544101/17/2020
Building Lifecycle
All (164)Filed (29)Permit Issued (24)Signed Off (10)Facade (FISP) (3)Violation (60)Inspection (8)Special Inspection (30)
08/25/2026
Filed — No Work
M01445922-I1
07/20/2026
Signed off — Alteration
removal of existing cooling tower and roof top air conditioning unit. Installation of new cooling tower connected to existing piping. installation of new roof pair conditioning unit connected to existing ductwork and piping
M00970178-I1
07/17/2026
Special inspection requirement — Ventilation and air distribution system
JONAR MADRIAGA
07/17/2026
Special inspection requirement — Maintenance information
JONAR MADRIAGA
07/17/2026
Special inspection requirement — Final
JONAR MADRIAGA
07/17/2026
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
07/17/2026
Special inspection requirement — Interior lighting power
JONAR MADRIAGA
07/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
07/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
07/17/2026
Special inspection requirement — Shutoff dampers
JONAR MADRIAGA
07/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
07/17/2026
Special inspection requirement — Lighting controls
JONAR MADRIAGA
07/15/2026
Filed — Alteration
M01025035-A1
07/08/2026
Special inspection requirement — Ventilation and air distribution system
JONAR MADRIAGA
07/08/2026
Special inspection requirement — Interior lighting power
JONAR MADRIAGA
07/08/2026
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
07/08/2026
Special inspection requirement — Final
JONAR MADRIAGA
07/08/2026
Special inspection requirement — Shutoff dampers
JONAR MADRIAGA
07/08/2026
Special inspection requirement — Lighting controls
JONAR MADRIAGA
07/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
07/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
07/08/2026
Special inspection requirement — Maintenance information
JONAR MADRIAGA
07/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
07/07/2026
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
07/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
07/07/2026
Special inspection requirement — Maintenance information
JONAR MADRIAGA
07/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
07/07/2026
Special inspection requirement — Duct leakage testing, insulation and design
JONAR MADRIAGA
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
07/07/2026
Special inspection requirement — Final
JONAR MADRIAGA
07/07/2026
Special inspection requirement — Shutoff dampers
JONAR MADRIAGA
07/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
07/07/2026
Special inspection requirement — Metering
JONAR MADRIAGA
07/06/2026
Filed — Alteration
removal of existing cooling tower and roof top air conditioning unit. Installation of new cooling tower connected to existing piping. installation of new roof pair conditioning unit connected to existing ductwork and piping
M00970178-P1
01/21/2026
Signed off — Alteration
M01025035-S4
01/15/2026
Signed off — Alteration
M01025035-I1
10/28/2025
Signed off — Alteration
M01282512-I1
09/19/2025
Filed — Alteration
M01282512-I1
09/19/2025
Permit issued — Sidewalk Shed
M01282512-I1-SH
06/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/21/2025
Filed — Alteration
M01025035-P5
05/20/2025
Filed — Alteration
M01025035-P4
04/15/2025
Signed off — Alteration
mechanical demo of tenant space floors Cellar, 1-8. Tenant fit out to be filed under a separate application. remove existing vav boxes, rooftop ac unit, ductwork and sir distribution devices, low voltage controls, air curtains at first floor entry doors.
M00986809-S3
04/15/2025
Signed off — Alteration
mechanical demo of tenant space floors Cellar, 1-8. Tenant fit out to be filed under a separate application. remove existing vav boxes, rooftop ac unit, ductwork and sir distribution devices, low voltage controls, air curtains at first floor entry doors.
M00986809-S2
04/15/2025
Signed off — Alteration
mechanical demo of tenant space floors Cellar, 1-8. Tenant fit out to be filed under a separate application. remove existing vav boxes, rooftop ac unit, ductwork and sir distribution devices, low voltage controls, air curtains at first floor entry doors.
M00986809-S1
03/03/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/25/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/24/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/24/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/23/2024
Signed off — Alteration
mechanical demo of tenant space floors Cellar, 1-8. Tenant fit out to be filed under a separate application. remove existing vav boxes, rooftop ac unit, ductwork and sir distribution devices, low voltage controls, air curtains at first floor entry doors.
M00986809-I1
12/09/2024
Permit issued — Sidewalk Shed
M01079058-I1-SH
12/06/2024
Permit issued — Construction Fence
M01079061-I1-FN
11/08/2024
Filed — No Work
M01137215-I1
10/31/2024
Filed — Alteration
M01025035-P3
10/25/2024
Filed — Alteration
M01025035-P2
10/09/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/16/2024
Permit issued — Structural
M01025035-S4-ST
09/10/2024
Filed — Alteration
M01025035-S4
09/05/2024
Filed — Alteration
M01025035-P1
Latest 60 of 164 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC09/19/2025
DOB NOWSidewalk ShedPermit IssuedSAFWAY ATLANTIC, LLC12/09/2024
DOB NOWConstruction FencePermit IssuedSAFWAY ATLANTIC, LLC12/06/2024
DOB NOWStructuralSigned-offSCIAME CONSTRUCTION LLC09/16/2024
DOB NOWMechanical SystemsPermit IssuedSCIAME CONSTRUCTION LLC08/22/2024
DOB NOWGeneral ConstructionSigned-offSCIAME CONSTRUCTION LLC08/22/2024
DOB NOWSidewalk ShedPermit IssuedSAFWAY ATLANTIC, LLC07/29/2024
DOB NOWConstruction FencePermit IssuedSAFWAY ATLANTIC, LLC07/17/2024
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP05/15/2024
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC05/14/2024
DOB NOWPlumbingSigned-offMEGA PLBG CORP04/24/2024
DOB NOWSprinklersSigned-offREAL PLUMBING CORP04/24/2024
DOB NOWGeneral ConstructionSigned-offSCIAME CONSTRUCTION LLC04/23/2024
DOB NOWMechanical SystemsPermit IssuedSCIAME CONSTRUCTION LLC04/23/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC02/29/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC02/29/2024
DOB NOWGeneral ConstructionSigned-offSCIAME CONSTRUCTION LLC02/02/2024
DOB NOWMechanical SystemsSigned-offSCIAME CONSTRUCTION LLC02/01/2024
DOB NOWMechanical SystemsSigned-offSCIAME CONSTRUCTION LLC12/15/2023
DOB NOWGeneral ConstructionSigned-offWINICK PRODUCTIONS, LLC04/21/2023
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC01/24/2020
DOB NOWSupported ScaffoldSigned-offSAFWAY ATLANTIC, LLC12/17/2019
DOB NOWSupported ScaffoldSigned-offSAFWAY ATLANTIC, LLC09/23/2019
DOB NOWSupported ScaffoldSigned-offSAFWAY ATLANTIC, LLC08/26/2019
BISEQISSUEDSAFWAY ATLANTIC, LLC06/14/2023
BISEQISSUEDSAFWAY ATLANTIC, LLC01/19/2022
BISSPISSUEDPACE PLUMBING CORP02/26/2021
BISEQISSUEDSAFWAY ATLANTIC, LLC02/03/2021
BISEQISSUEDSAFWAY ATLANTIC, LLC02/18/2020
BISOTISSUEDSTRUCTURE TONE, LLC12/26/2019
BISEQISSUEDSAFWAY ATLANTIC, LLC09/04/2019
BISPLISSUEDPAR PLUMBING CO., INC05/28/2019
BISOTISSUEDSTRUCTURE TONE, LLC05/08/2019
BISSPISSUEDSIRINA FIRE PROT CORP04/23/2019
BISOTISSUEDSTRUCTURE TONE, LLC04/03/2019
BISOTISSUEDSTRUCTURE TONE, LLC01/28/2019
BISOTISSUEDRP BUILDERS GROUP LLC01/21/2015
BISOTISSUEDSET MANAGEMENT LLC01/09/2014
BISPLISSUEDTRISTAR PLBG & HTG INC09/29/2009
BISOTISSUEDLANDMARK RETAIL INC09/24/2009
+ 34 more permits on file
1 project · most recent 07/06/2026
Air Conditioning Systems Cooling Towers
FiledStatusContractorScopeMake / Model / Capacity
07/06/2026Signed-offSCIAME CONSTRUCTION LLCAir Conditioning Systems, Cooling Towers
Cooling
Hitachi HVAHR144B32S (Module B) 336,000 BTU · Vrf Outdoor ×2
HVAHR192B32S (Module A) 336,000 BTU · Vrf Outdoor ×2
Cooling Tower
Evapco VT1-M696-P 8,250,000 BTU · Cooling Tower ×2
1 project · most recent 01/17/2020
Gas Medical Gas
FiledStatusContractorScope
01/17/2020Permit IssuedPAR PLUMBING CO., INCGas, Medical Gas
8 projects · most recent 09/17/2026
General Wiring
FiledStatusContractorScope
09/17/2026Permit IssuedTOP SHELF ELECTRIC CORP—
10/08/2025CompleteLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
09/22/2025CompleteTOP SHELF ELECTRIC CORP—
07/24/2024Permit IssuedCORPORATE ELEC. GROUP INC—
04/19/2024Permit IssuedLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
04/12/2024CompleteLIVE WIRE ELECTRIC 1 LLC—
01/31/2024Permit IssuedECNY ELEC'L CONTR'S, INCGeneral Wiring
05/03/2021CompleteADCO ELEC'L CORP—
2 projects · most recent 07/16/2024
Fence Sidewalk Shed
FiledStatusContractorScope
07/16/2024Permit IssuedSAFWAY ATLANTIC, LLCFence
07/16/2024Permit IssuedSAFWAY ATLANTIC, LLCSidewalk Shed
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/25/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
07/17/2026Lighting controlsJONAR MADRIAGAenergy_progress
07/17/2026HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
07/17/2026Maintenance informationJONAR MADRIAGAenergy_progress
07/17/2026Shutoff dampersJONAR MADRIAGAenergy_progress
07/17/2026HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
07/17/2026FinalJONAR MADRIAGAprogress
07/17/2026Mechanical SystemsJONAR MADRIAGAspecial
07/17/2026Ventilation and air distribution systemJONAR MADRIAGAenergy_progress
07/17/2026Interior lighting powerJONAR MADRIAGAenergy_progress
07/17/2026HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
07/08/2026FinalJONAR MADRIAGAprogress
07/08/2026Maintenance informationJONAR MADRIAGAenergy_progress
07/08/2026HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
07/08/2026HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
07/08/2026Interior lighting powerJONAR MADRIAGAenergy_progress
07/08/2026Ventilation and air distribution systemJONAR MADRIAGAenergy_progress
07/08/2026HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
07/08/2026Lighting controlsJONAR MADRIAGAenergy_progress
07/08/2026Shutoff dampersJONAR MADRIAGAenergy_progress
07/08/2026Mechanical SystemsJONAR MADRIAGAspecial
07/07/2026MeteringJONAR MADRIAGAenergy_progress
07/07/2026Shutoff dampersJONAR MADRIAGAenergy_progress
07/07/2026Electrical motors and elevatorsJONAR MADRIAGAenergy_progress
07/07/2026HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
07/07/2026Maintenance informationJONAR MADRIAGAenergy_progress
Latest 25 of 81.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Louis VuittonRetailCellar, Floors 1–8
Project M01025035 Alteration · Permit Entire · 04/18/2024
Project M00986809 Alteration · LOC Issued · 01/30/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 360 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch24
08/31/2026M00861809-I1Request digital key ↗
08/28/2026M00970178-I1Request digital key ↗
08/28/2026M00970178-P1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly3
08/31/2026M00864824-I1Request digital key ↗
08/26/2026M01445922-I1Request digital key ↗
08/25/2026M01137215-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00295085-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00216178-I1Request digital key ↗
▸Applications & Permits42
▸BISPLAN / WORK APPROVAL APPLICATION29
10/03/2023140867257Open ↗
10/03/2023140867257Open ↗
10/02/2023140887510Open ↗
Showing 3 of 29 on file for this type
▸BISWORK PERMIT APPLICATION13
02/14/2020140887510Open ↗
09/03/2019140867257Open ↗
06/10/2019123718405Open ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications168
▸DOB NOWProgress Inspector Seal & Signature66
09/29/2026M01025035-P1Open ↗
09/29/2026M01025035-P1Open ↗
09/29/2026M01025035-P1Open ↗
Showing 3 of 66 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature29
08/31/2026M00864824-I1Open ↗
08/28/2026M00970178-I1Open ↗
08/28/2026M00970178-P1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/29/2026M01025035-P1Open ↗
09/28/2026M01025035-P6Open ↗
09/07/2026M01025035-P2Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
04/29/2020123732354Open ↗
04/29/2020123666078Open ↗
01/09/2020123732345Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
02/14/2020140887510Open ↗
09/03/2019140867257Open ↗
05/03/2019123715122Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
05/03/2019123715122Open ↗
05/03/2019123715122Open ↗
05/02/2019123718405Open ↗
Showing 3 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
02/14/2020140887510Open ↗
09/03/2019140867257Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/14/2020140887510Open ↗
09/03/2019140867257Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/22/2009120160896Open ↗
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
08/19/2019123732345Open ↗
08/12/2019123732345Open ↗
05/03/2019123715122Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING5
01/07/2021123732345Open ↗
12/22/2020123732345Open ↗
10/02/2009120160896Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
12/16/2009120160896Open ↗
11/13/2009120160896Open ↗
10/23/2009120160896Open ↗
▸BISSPRINKLER SYSTEMS1
03/01/2021123718405Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
12/23/2020123863042Open ↗
▸Environmental & Asbestos24
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
08/28/2026M00970178-P1Open ↗
08/28/2026M00970178-I1Open ↗
08/28/2026M00986809-S2Open ↗
Showing 3 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
04/03/2019123732354Open ↗
04/03/2019123732345Open ↗
01/29/2019123666078Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/22/2009120160896Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
05/09/2019123715122Open ↗
05/03/2019123715122Open ↗
04/03/2019123732354Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
03/10/2021123715122Open ↗
05/15/2020123732354Open ↗
04/29/2020123732354Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/10/2021123715122Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY7
10/02/2023140867257Open ↗
09/29/2023140887510Open ↗
03/10/2021123715122Open ↗
Showing 3 of 7 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/01/2021123718405Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
10/03/2023140867257Open ↗
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
10/05/2023140867257Open ↗
10/03/2023140887510Open ↗
03/10/2021123715122Open ↗
Showing 3 of 12 on file for this type
▸BISFINAL3
10/03/2023140867257Open ↗
10/02/2023140887510Open ↗
03/01/2021123718405Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/24/2009120160896Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/22/2009120160896Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT20
03/10/2021123715122Open ↗
03/05/2021123718405Open ↗
02/19/2021123732345Open ↗
Showing 3 of 20 on file for this type
▸Filing & Intake Forms22
▸BISEFILING COVER SHEET10
05/03/2019123715122Open ↗
05/03/2019123715122Open ↗
05/02/2019123863042Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM5
04/29/2020123732354Open ↗
04/29/2020123666078Open ↗
01/30/2020123863042Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION5
01/12/2021123732345Open ↗
08/19/2019123732345Open ↗
05/10/2019123732354Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
02/14/2020140887510Open ↗
09/03/2019140867257Open ↗