ECB01/05/2026ATOI OBSERVED NEW PLUMBING WORK THAT CONSIST OF CAST IRON AND COPPER PIPES FOR NEW WASHER AND DRYER, NEWLY CREATED BATHROOMS., OBTAIN PERMIT$2K due
ECB01/05/2026ATOI OBSERVED CREATION OF NEW PARTITIONS AND FRAMING THROUGHOUT BASEMENT APARTMENT MARKED WITH 4 AND 1/2. NO PERMIT ON FILE WITH DOB. WORK 60 % COMPLETE, OBTAIN PERMIT$2K due
ECB01/05/2026ATOI OBSERVED ELECTRICAL BX CABLE INSTALLED THROUGHOUT THE APARTMENT INCLUDING NEW JUNCTION BOXES, OUTLETS AND SWITCHES AND NEW ELECTRICAL PANEL. NO PERMIT ON FILE WITH DOB., OBTAIN PERMIT$2K due
HPD07/15/2016SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION THE PIERCED FLOOR, CREATING STAIRS FROM 6TH STORY TO 7TH STORY, FOR PURPOSE OF DUPLEX PENTHOUSE APARTMENT LOCATED AT APT PH
HPD07/15/2016SECTION 300, 301, 302, M/D LAW FILE PLANS AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE FOLLOWING ALTERATION OR RESTORE PREMISES TO PRIOR LEGAL CONDITION THE 6TH AND 7TH STORIES CREATED AS ONE DUPLEX, PENTHOUSE APARTMENT LOCATED AT APT PH
HPD01/23/2006SECTION 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED CELLAR AT BOILER ROOM
HPD12/23/2005SECTION 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD12/23/2005SECTION 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD10/02/2000SECTION 27-2050 ADM CODE SEAL IN OPEN POSITION THE O.S.Y. VALVE OF THE SPRINKLER SYSTEM IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THIS DEPARTMENT AT CELLAR FRONT , CELLAR
HPD10/02/2000SECTION 27-2050 ADM CODE MAINTAIN ON THE PREMISES A COPY OF THE SPRINKLER TEST FOR THE CURRENT YEAR.
HPD10/02/2000SECTION 27-2050 ADM CODE PROVIDE 3 EXTRA SPRINKLER HEADS AND SUITABLE WRENCH FOR EMERGENCY PURPOSES AT O.S.Y. VALVE OF SPRINKLER IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THIS DEPARTMENT AT CELLAR FRONT , CELLAR
HPD09/01/2000SECTION 27-2050 ADM CODE PROVIDE A PIECE OF GARDEN HOSE 10 FEET IN LENGTH WITH FEMALE COUPLING AND A 10 QUART PAIL ON PREMISES TO TEST SPRINKLER SYSTEM.
DOB01/13/1997V-DOB VIOLATION - ACTIVE
DOB09/16/1996V-DOB VIOLATION - ACTIVE
DOB09/16/1996V-DOB VIOLATION - ACTIVE
HPD01/28/1992D26-10.01 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF LOCK ON FIRE STAIR DOOR 6 STY 7 STY PUBLIC HALL.