← Back
Two family brick
4 HAMILTON TERRACE
MANHATTAN · BIN 1060981
💬 Discuss this project
1898Year Built
3Stories
B1Building Class
R6AZoning
3,930 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · Owner of record: 4 HAMILTON LLC · 1,700 sf lot · 2.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof2p · 1 filing · 10 docs
Floor 336p · 2 filings · 20 docs
Floor 231p · 1 filing · 20 docs
Floor 130p · 1 filing · 20 docs
Basement39p · 2 filings · 20 docs
1 job · most recent 09/19/2022
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/19/2022Permit IssuedDESIGN SMART NYC INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUZ-HA24NHA1 24,000 BTU · Condensing Unit ×1
Heating
Mitsubishi Electric TUMYH0361AK41NA 42,000 BTU · Vrf Outdoor ×1
TUMYH0481AK41NA 54,000 BTU · Heat Pump Outdoor ×1
Ventilation
Greenheck SQ-98-VG 390 CFM · Kitchen Exhaust ×1
USF-6 100 CFM · Exhaust Fan ×1
1 job · most recent 09/19/2022
Sprinkler System
FiledStatusContractorScope
09/19/2022Signed-offFIVE BOROUGH NYC LLCSprinkler System
1 job · most recent 09/19/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/19/2022Signed-offSD PLUMBING, INCGas, Storm, Water/Sanitary
2 jobs · most recent 07/12/2022
General Wiring
FiledStatusContractorScope
07/12/2022CompleteSD ELECTL DIVISION NYC COGeneral Wiring
05/28/2019CompleteTOP SHELF ELECTRIC CORP—
1 job · most recent 09/19/2022
Steel Concrete Wood
FiledStatusContractorScope
09/19/2022Permit IssuedDESIGN SMART NYC INCSteel, Concrete, Wood
Building Lifecycle
All (84)Filed (15)Permit Issued (10)Signed Off (6)Violation (2)Inspection (11)Objection (10)Special Inspection (30)
12/22/2022
Signed off — Alteration CO
CONVERSION OF EXISTING CHURCH BUILDING INTO TWO FAMILY HOUSE. WORK INCLUDES GUT RENOVATION AS PER PLANS SUBMITTED HEREWITH. OBTAIN NEW C OF O. STRUCTURAL, MECHANICAL, SPRINKLER, AND PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATIONS.
M00478489-S3
12/22/2022
Signed off — Alteration CO
CONVERSION OF EXISTING CHURCH BUILDING INTO TWO FAMILY HOUSE. WORK INCLUDES GUT RENOVATION AS PER PLANS SUBMITTED HEREWITH. OBTAIN NEW C OF O. STRUCTURAL, MECHANICAL, SPRINKLER, AND PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATIONS.
M00478489-S4
12/09/2022
Signed off — Alteration CO
CONVERSION OF EXISTING CHURCH BUILDING INTO TWO FAMILY HOUSE. WORK INCLUDES GUT RENOVATION AS PER PLANS SUBMITTED HEREWITH. OBTAIN NEW C OF O. STRUCTURAL, MECHANICAL, SPRINKLER, AND PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATIONS.
M00478489-S2
12/01/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/01/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
10/03/2022
Special inspection requirement — Fire-Resistance Rated Construction
ANGEL ROJAS
10/03/2022
Special inspection requirement — Sprayed fire-resistant materials
ANGEL ROJAS
09/19/2022
Filed — Alteration CO
CONVERSION OF EXISTING CHURCH BUILDING INTO TWO FAMILY HOUSE. WORK INCLUDES GUT RENOVATION AS PER PLANS SUBMITTED HEREWITH. OBTAIN NEW C OF O. STRUCTURAL, MECHANICAL, SPRINKLER, AND PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATIONS.
M00478489-P7
09/19/2022
Special inspection requirement — Fire-Resistance Rated Construction
ANGEL ROJAS
09/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
09/19/2022
Special inspection requirement — Sprayed fire-resistant materials
ANGEL ROJAS
08/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Tobias
08/25/2022
Special inspection requirement — Sprinkler Systems
Michael Tobias
08/25/2022
Special inspection requirement — HVAC-R and service water heating equipment
Michael Tobias
08/17/2022
Filed — Alteration CO
CONVERSION OF EXISTING CHURCH BUILDING INTO TWO FAMILY HOUSE. WORK INCLUDES GUT RENOVATION AS PER PLANS SUBMITTED HEREWITH. OBTAIN NEW C OF O. STRUCTURAL, MECHANICAL, SPRINKLER, AND PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATIONS.
M00478489-P6
08/16/2022
Special inspection requirement — Sprinkler Systems
Michael Tobias
08/16/2022
Special inspection requirement — HVAC-R and service water heating equipment
Michael Tobias
08/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Tobias
08/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/01/2022
Signed off — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
M00175279-I1
08/01/2022
Signed off — Alteration
M00175264-I1
07/28/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/25/2022
Permit issued — General Construction
M00478489-I1-GC
06/21/2022
Filed — Alteration CO
CONVERSION OF EXISTING CHURCH BUILDING INTO TWO FAMILY HOUSE. WORK INCLUDES GUT RENOVATION AS PER PLANS SUBMITTED HEREWITH. OBTAIN NEW C OF O. STRUCTURAL, MECHANICAL, SPRINKLER, AND PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATIONS.
M00478489-P5
06/15/2022
Special inspection requirement — Sprinkler Systems
Michael Tobias
06/15/2022
Special inspection requirement — HVAC-R and service water heating equipment
Michael Tobias
06/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Tobias
06/09/2022
Signed off — Alteration
APPLICATION FILED FOR INTERIOR NON-STRUCTURAL DEMOLITION, WALL FRAMING WORK. PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATION. NO WORK ALTERATION TO THE EXTERIOR OF THIS BUILDING. . ALL AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00453963-I1
06/09/2022
Permit issued — General Construction
M00453963-I1-GC
03/28/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/22/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/17/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/13/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/15/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/17/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/13/2021
Permit issued — Plumbing
M00478489-S4-EW-SP
08/18/2021
Special inspection requirement — Final
ANGEL ROJAS
08/18/2021
Special inspection requirement — Structural Steel - Welding
NORMAN LOK
08/18/2021
Special inspection requirement — Subgrade Inspections
NORMAN LOK
08/18/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANGEL ROJAS
08/18/2021
Special inspection requirement — Structural Steel - High Strength Bolting
NORMAN LOK
08/18/2021
Special inspection requirement — Concrete - Cast-In-Place
ANGEL ROJAS
08/18/2021
Special inspection requirement — Structural Steel - Details
NORMAN LOK
08/18/2021
Special inspection requirement — Structural Cold-Formed Steel
ANGEL ROJAS
08/18/2021
Special inspection requirement — Post-installed Anchors
NORMAN LOK
08/18/2021
Special inspection requirement — Structural Wood Frame
ANGEL ROJAS
08/10/2021
Filed — Alteration CO
CONVERSION OF EXISTING CHURCH BUILDING INTO TWO FAMILY HOUSE. WORK INCLUDES GUT RENOVATION AS PER PLANS SUBMITTED HEREWITH. OBTAIN NEW C OF O. STRUCTURAL, MECHANICAL, SPRINKLER, AND PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATIONS.
M00478489-P4
07/26/2021
Filed — Alteration CO
CONVERSION OF EXISTING CHURCH BUILDING INTO TWO FAMILY HOUSE. WORK INCLUDES GUT RENOVATION AS PER PLANS SUBMITTED HEREWITH. OBTAIN NEW C OF O. STRUCTURAL, MECHANICAL, SPRINKLER, AND PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATIONS.
M00478489-P3
07/12/2021
Filed — Alteration CO
CONVERSION OF EXISTING CHURCH BUILDING INTO TWO FAMILY HOUSE. WORK INCLUDES GUT RENOVATION AS PER PLANS SUBMITTED HEREWITH. OBTAIN NEW C OF O. STRUCTURAL, MECHANICAL, SPRINKLER, AND PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATIONS.
M00478489-P1
07/09/2021
Special inspection requirement — Mechanical Systems
ANGEL ROJAS
07/09/2021
Special inspection requirement — Final
ANGEL ROJAS
07/06/2021
Filed — Alteration CO
CONVERSION OF EXISTING CHURCH BUILDING INTO TWO FAMILY HOUSE. WORK INCLUDES GUT RENOVATION AS PER PLANS SUBMITTED HEREWITH. OBTAIN NEW C OF O. STRUCTURAL, MECHANICAL, SPRINKLER, AND PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATIONS.
M00478489-P2
06/30/2021
Permit issued — Plumbing
M00478489-S4-PL
06/29/2021
Permit issued — General Construction
M00478489-I1-GC
06/29/2021
Permit issued — Structural
M00478489-S2-ST
06/29/2021
Special inspection requirement — Sprayed fire-resistant materials
ANGEL ROJAS
06/29/2021
Special inspection requirement — Fire-Resistance Rated Construction
ANGEL ROJAS
06/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
Latest 60 of 84 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
4 HAMILTON4007/08/2026
UNIVERSAL SYSTEMS807/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/12/2020$1.5M—THE BOARD OF MANAGERS OF THE DIOCESAN MISS → 4 HAMILTON LLC$375/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHETYPE ARCHITECTURE709/19/2022
NEW YORK ENGINEERS LLC608/17/2022
NAVI STRUCTURAL ENGINEERING, PLLC206/03/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KX CONSULTING2603/21/2026
EUROCELT EXPEDITING, INC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DESIGN SMART NYC INCGeneral Contractor1207/08/2026
UNIVERSAL SYSTEMS INCGeneral Contractor407/08/2026
DRUMSILLA PLUMBING CORPElectrical103/21/2026
MICHAEL TOBIASElectrical103/21/2026
SD ELECTL DIVISION NYC COElectrical103/22/2026
FIVE BOROUGH NYC LLCFire Protection107/08/2026
ALAN BERMANElectrical103/21/2026
CERTIFIED SERVICES ANDPlumbing107/08/2026
ALEXANDRE NOSSOULENKOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR ARCHITECT P.C.1171709/19/2022
NEW YORK ENGINEERS, P.C.3868408/17/2022
NORMAN C. LOK818208/10/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDESIGN SMART NYC INC07/25/2022
DOB NOWGeneral ConstructionSigned-offDESIGN SMART NYC INC06/09/2022
DOB NOWPlumbingSigned-offFIVE BOROUGH NYC LLC09/13/2021
DOB NOWPlumbingSigned-offCERTIFIED SERVICES AND06/30/2021
DOB NOWGeneral ConstructionPermit IssuedDESIGN SMART NYC INC06/29/2021
DOB NOWStructuralSigned-offDESIGN SMART NYC INC06/29/2021
DOB NOWMechanical SystemsSigned-offDESIGN SMART NYC INC06/28/2021
DOB NOWGeneral ConstructionSigned-offDESIGN SMART NYC INC02/16/2021
DOB NOWSupported ScaffoldSigned-offUNIVERSAL SYSTEMS INC06/04/2019
DOB NOWSidewalk ShedSigned-offUNIVERSAL SYSTEMS INC06/03/2019
BISOTISSUEDMJM CONSTRUCTION LLC11/06/2019
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/01/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/28/2022Pass-Final CND-Occupancy InspectionPassView ↗
03/28/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/22/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/17/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/15/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/17/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
10/03/2022Fire-Resistant Penetrations and JointsANGEL ROJASspecial
10/03/2022Fire-Resistance Rated ConstructionANGEL ROJASprogress
10/03/2022Sprayed fire-resistant materialsANGEL ROJASspecial
09/19/2022Fire-Resistance Rated ConstructionANGEL ROJASprogress
09/19/2022Fire-Resistant Penetrations and JointsANGEL ROJASspecial
09/19/2022Sprayed fire-resistant materialsANGEL ROJASspecial
08/25/2022Fire-Resistant Penetrations and JointsMichael Tobiasspecial
08/25/2022Sprinkler SystemsMichael Tobiasspecial
08/25/2022HVAC-R and service water heating equipmentMichael Tobiasenergy_progress
08/16/2022Sprinkler SystemsMichael Tobiasspecial
08/16/2022HVAC-R and service water heating equipmentMichael Tobiasenergy_progress
08/16/2022Fire-Resistant Penetrations and JointsMichael Tobiasspecial
06/15/2022Sprinkler SystemsMichael Tobiasspecial
06/15/2022HVAC-R and service water heating equipmentMichael Tobiasenergy_progress
06/15/2022Fire-Resistant Penetrations and JointsMichael Tobiasspecial
08/18/2021FinalANGEL ROJASprogress
08/18/2021Structural Steel - WeldingNORMAN LOKspecial
08/18/2021Subgrade InspectionsNORMAN LOKspecial
08/18/2021Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
08/18/2021Structural Steel - High Strength BoltingNORMAN LOKspecial
08/18/2021Concrete - Cast-In-PlaceANGEL ROJASspecial
08/18/2021Structural Steel - DetailsNORMAN LOKspecial
08/18/2021Structural Cold-Formed SteelANGEL ROJASspecial
08/18/2021Post-installed AnchorsNORMAN LOKspecial
08/18/2021Structural Wood FrameANGEL ROJASprogress
Latest 25 of 37.
▾Documents — 127 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch11
09/03/2026M00478489-P3Request digital key ↗
09/03/2026M00478489-P2Request digital key ↗
09/03/2026M00478489-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00453963-P1Request digital key ↗
09/04/2026M00453963-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00175279-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00175264-I1Request digital key ↗
▸Applications & Permits18
▸DOB NOWLPC Approval/Permit13
09/04/2026M00453963-P1Open ↗
09/04/2026M00453963-I1Open ↗
08/13/2026M00478489-S2Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
02/03/2020123688740Open ↗
01/10/2020123688740Open ↗
10/10/2019123688740Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
11/07/2019123688740Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00478489-I1Open ↗
▸Seals & Professional Certifications54
▸DOB NOWSpecial Inspector Seal & Signature22
08/27/2026M00478489-S2Open ↗
08/27/2026M00478489-S2Open ↗
08/27/2026M00478489-S2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/05/2026M00175279-I1Open ↗
09/04/2026M00453963-P1Open ↗
09/04/2026M00453963-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026M00175279-I1Open ↗
08/28/2026M00453963-P1Open ↗
08/27/2026M00478489-S2Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
10/10/2019123688740Open ↗
08/29/2019123688740Open ↗
08/29/2019123688740Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist3
08/13/2026M00478489-P2Open ↗
08/13/2026M00478489-I1Open ↗
08/13/2026M00478489-P7Open ↗
▸BISTenant Protection Plan and Notes1
08/29/2019123688740Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M00478489-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/04/2026M00453963-P1Open ↗
09/04/2026M00453963-I1Open ↗
09/03/2026M00478489-P3Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
10/29/2019123688740Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00478489-S3Open ↗
08/13/2026M00478489-S4Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/16/2020123688740Open ↗
06/16/2020123688740Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION2
11/07/2019123688740Open ↗
08/29/2019123688740Open ↗
▸BISLANDMARKS APPROVAL2
01/28/2020123688740Open ↗
10/08/2019123688740Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
09/05/2026M00175279-I1Open ↗
08/13/2026M00175264-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/16/2020123688740Open ↗
▸BISLANDMARKS SIGNOFF1
06/16/2020123688740Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
06/16/2020123688740Open ↗
02/03/2020123688740Open ↗
01/10/2020123688740Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISBOROUGH INTAKE FORM2
02/03/2020123688740Open ↗
01/10/2020123688740Open ↗
▸BISADDITIONAL INFORMATION1
01/28/2020123688740Open ↗
▸BISEFILING COVER SHEET1
08/29/2019123688740Open ↗