← Back
BuildNYC
Condo, residential unit in 2-10 unit building
4 SOUTH PORTLAND AVENUE
BROOKLYN · Fort Greene · BIN 3058810
💬 Discuss this project
1872Year Built
4Stories
R1Building Class
R6BZoning
5,586 sfGross Floor Area
5Units
Rent Stabilized1 Active Violation ▸FDNY Report ↗
Condo, residential unit in 2-10 unit building · 2,612 sf lot · 2.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof5p · 1 filing · 20 docs
Floor 47p · 2 filings · 20 docs
Floor 3
Floor 2
Floor 1
Site & exteriorHeavy duty sidewalk shed installationUnder Construction8p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LLB Real Estate Development403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Always Fast Services210/02/2026
BO Lee Architect407/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Anzalone Architecture803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hatchet WorksGeneral Contractor303/21/2026
J & G Construction ServicesScaffold210/04/2026
Progeny RestorationGeneral Contractor103/21/2026
Vikrant Contracting BuildersGeneral Contractor103/21/2026
Active Plumbing & HeatingPlumbing103/21/2026
G Rollins Plumbing & HeatingPlumbing103/21/2026
AJC Plumbing & HeatingPlumbing107/08/2026
Mojibur RahamanGeneral Contractor103/21/2026
Elb ConstructionGeneral Contractor108/08/2006
R & S ConstructionGeneral Contractor110/11/2007
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Catalpa Special Inspectio2004407/19/2023
H2 Consulting PE835205/08/2023
Building Lifecycle
10/02/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01466240-I1
10/02/2026
Permit issued — Sidewalk Shed
B01466240-I1-SH
09/30/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01466241-I1
09/30/2026
Permit issued — Supported Scaffold
B01466241-I1-SF
06/10/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
78 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedJ & G Construction Services10/02/2026
DOB NOWSupported ScaffoldPermit IssuedJ & G Construction Services09/30/2026
DOB NOWPlumbingSigned-offAJC Plumbing & Heating11/03/2022
DOB NOWGeneral ConstructionSigned-offHatchet Works07/21/2022
BISEQISSUEDVikrant Contracting & Builder04/10/2013
BISOTISSUEDProgeny Restoration03/05/2013
BISPLISSUEDActive Plumbing & Heating04/24/2009
BISOTISSUEDMojibur Rahaman04/15/2009
BISPLISSUEDG. Rollins Plumbing & Heating03/26/2009
BISOTISSUEDR & S Construction10/11/2007
BISPLISSUEDG. Rollins Plumbing & Heating11/13/2006
BISOTISSUEDElb Construction08/08/2006
4 projects · most recent 09/28/2026
General Wiring
FiledStatusContractorScope
09/28/2026Permit IssuedRichard Neu—
09/21/2023CompleteCel Services Inc Dba Cel ElectricGeneral Wiring
01/13/2023Permit IssuedAll Ways Electric Corp.w—
11/07/2022Permit IssuedGramercy ElectricGeneral Wiring
2 projects · most recent 10/02/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
10/02/2026Permit IssuedJ & G Construction ServicesSidewalk Shed
09/30/2026Permit IssuedJ & G Construction ServicesScaffold
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/04/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/26/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
03/24/2023Heating SystemsERIC BERLENTspecial
03/24/2023Mechanical SystemsERIC BERLENTspecial
03/24/2023Fire-Resistant Penetrations and JointsERIC BERLENTspecial
03/24/2023Structural Stability – Alterations of existing buildingsHarry Hongspecial
03/24/2023Structural Steel - DetailsHarry Hongspecial
03/24/2023Structural Steel - High Strength BoltingHarry Hongspecial
03/24/2023Energy Code Compliance InspectionsBO LEEprogress
03/24/2023FinalBO LEEprogress
03/24/2023Fenestration air leakageBO LEEenergy_progress
03/24/2023Fenestration areasBO LEEenergy_progress
03/24/2023HVAC-R and service water heating system controlsBO LEEenergy_progress
03/24/2023HVAC-R and service water heating equipmentBO LEEenergy_progress
03/24/2023HVAC-R and service water piping design and insulationBO LEEenergy_progress
03/24/2023Fenestration and door U-factor and product ratingsBO LEEenergy_progress
03/24/2023Lighting in dwelling unitsBO LEEenergy_progress
52 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account