← Back
Single or multiple dwelling with stores or offices
4 STANWIX STREET
BROOKLYN · BIN 3072194
💬 Discuss this project
1931Year Built
3Stories
S9Building Class
R6Zoning
3,744 sfGross Floor Area
6Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: BOKONOS 4 LLC · 1,822 sf lot · 2.05 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 6 docs
Floor 3Under Construction3p · 1 filing · 10 docs
Floor 2Under Construction2p · 1 filing · 10 docs
Floor 1Under Construction6p · 3 filings · 20 docs
CellarUnder Construction3p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EKT EQUITIES1409/13/2026
SAFE-SHIELD ENTERPRISES507/08/2026
BOKONOS 202807/08/2026
BOKONOS 4 LLC103/22/2026
OWNER OF 44 JEFFERSON ST103/22/2026
TRIONFO 888603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/03/2022$2.4M—TRIONFO 888, LLC → BOKONOS 4 LLC$633/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PINTO ENGINEERING CONSULTANT, DPC607/13/2026
MCHENERY TESTING LAB204/24/2025
ASHRAF CORP211/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOXTON603/21/2026
AN TONG FAN203/21/2026
PINTO STUDIO403/21/2026
DANICO SERVICES203/21/2026
JESSIE BONAPARTE103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAX CONSTRUCTION NYC CORPGeneral Contractor407/08/2026
JOHN EVAN CONTRACTING CORGeneral Contractor204/09/2026
SAFE-SHEILD ENTERPRISE INGeneral Contractor207/08/2026
CT IDEAL SUPPRESSIONGeneral Contractor107/08/2026
HT PLUMBING & HEATING CORPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PINTO ENGINEERING CONSULT9110207/01/2026
MCHENERY TESTING LAB9181304/24/2025
JAY KAVI CORPORATION8500111/28/2023
PINTO STUDIO INC6366110/07/2022
Building Lifecycle
All (101)Filed (10)Permit Issued (8)Signed Off (4)Violation (45)Inspection (5)Objection (18)Special Inspection (11)
08/14/2026
Objection resolved — Resolved
08/14/2026
Objection resolved — Addressed
08/07/2026
Objection raised — Other
08/05/2026
Objection raised — Other
07/13/2026
Filed — Alteration
PLUMBING WORK (5) APARTMENTS UNITS ON 1ST, 2ND & 3RD FLOORS; CELLAR ACCESSORY SPACE, BATHROOMS AND KITCHENS); BOILER & METER ROOMS, AND COMMERCIAL (DELY) SCOPE OF WORK FILED IN CONJUNCTION WITH ALT1-CO 302097013 AND OTHER ALT2 REFERRED IN THE FILING.
B01151265-S1
07/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rene Navarrete
07/01/2026
Filed — Alteration
PLUMBING WORK (5) APARTMENTS UNITS ON 1ST, 2ND & 3RD FLOORS; CELLAR ACCESSORY SPACE, BATHROOMS AND KITCHENS); BOILER & METER ROOMS, AND COMMERCIAL (DELY) SCOPE OF WORK FILED IN CONJUNCTION WITH ALT1-CO 302097013 AND OTHER ALT2 REFERRED IN THE FILING.
B01151265-P1
06/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rene Navarrete
03/27/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/24/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/24/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/10/2026
Permit issued — Plumbing
B01151265-I1-PL
11/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/03/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
06/03/2025
Permit issued — General Construction
B01201920-I1-GC
06/03/2025
Permit issued — Mechanical Systems
B01201920-S2-MS
04/24/2025
Filed — Alteration
Install New Bracket and new exhaust duct
B01201920-S1
04/24/2025
Filed — Alteration
Install New Bracket and new exhaust duct
B01201920-S2
04/24/2025
Filed — Alteration
Install New Bracket and new exhaust duct
B01201920-I1
04/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
TREVOR O. FLOWERS
03/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
TREVOR O. FLOWERS
03/27/2025
Special inspection requirement — Final
TREVOR O. FLOWERS
03/27/2025
Special inspection requirement — Mechanical Systems
TREVOR O. FLOWERS
03/23/2025
Objection resolved — Addressed
03/23/2025
Objection resolved — Addressed
03/19/2025
Objection raised — Plumbing
03/19/2025
Objection raised — Scope
03/19/2025
Objection raised — Plumbing
03/19/2025
Objection raised — Plumbing
03/19/2025
Objection raised — Scope
03/17/2025
Filed — Alteration
PLUMBING WORK (5) APARTMENTS UNITS ON 1ST, 2ND & 3RD FLOORS; CELLAR ACCESSORY SPACE, BATHROOMS AND KITCHENS); BOILER & METER ROOMS, AND COMMERCIAL (DELY) SCOPE OF WORK FILED IN CONJUNCTION WITH ALT1-CO 302097013 AND OTHER ALT2 REFERRED IN THE FILING.
B01151265-I1
02/24/2025
Signed off — Alteration
INSTALL A NEW COMMERCIAL KITCHEN EXHAUST HOOD, DUCTWORK AT KITCHEN AND EXHAUST FAN ON THE ROOF, THERE IS NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00944438-I1
09/05/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/24/2024
Permit issued — Mechanical Systems
B00944438-I1-MS
12/13/2023
Objection resolved — Addressed
12/06/2023
Objection resolved — Addressed
12/01/2023
Objection raised — Fire_Protection
12/01/2023
Objection raised — Mechanical
11/28/2023
Filed — Alteration
INSTALL A NEW COMMERCIAL KITCHEN EXHAUST HOOD, DUCTWORK AT KITCHEN AND EXHAUST FAN ON THE ROOF, THERE IS NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00944438-I1
11/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
Jay Kavi
10/06/2023
Special inspection requirement — Final
De Gao
10/06/2023
Special inspection requirement — Mechanical Systems
Jay Kavi
08/31/2023
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 BUIILDING CODE.
B00800372-I1
05/30/2023
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00784584-I1
05/18/2023
Permit issued — Sidewalk Shed
B00784584-I1-SH
05/09/2023
Signed off — Alteration
B00784587-I1
04/04/2023
Violation issued (HPD, closed)
B
04/04/2023
Violation issued (HPD, closed)
B
03/29/2023
Permit issued — Sidewalk Shed
B00800372-I1-SH
01/23/2023
Permit issued — General Construction
B00784587-I1-GC
12/20/2022
Permit issued — Sidewalk Shed
B00800372-I1-SH
12/19/2022
Filed — Alteration
HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 BUIILDING CODE.
B00800372-I1
10/07/2022
Filed — Alteration
B00784587-I1
09/08/2022
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00784584-I1
03/02/2022
Violation issued (HPD, closed)
I
03/02/2022
Violation issued (HPD, closed)
A
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedHT PLUMBING & HEATING COR03/10/2026
DOB NOWGeneral ConstructionPermit IssuedJOHN EVAN CONTRACTING COR06/03/2025
DOB NOWMechanical SystemsPermit IssuedJOHN EVAN CONTRACTING COR06/03/2025
DOB NOWMechanical SystemsSigned-offCT IDEAL SUPPRESSION07/24/2024
DOB NOWSidewalk ShedSigned-offMAX CONSTRUCTION NYC CORP05/18/2023
DOB NOWSidewalk ShedSigned-offSAFE-SHEILD ENTERPRISE IN03/29/2023
DOB NOWGeneral ConstructionSigned-offMAX CONSTRUCTION NYC CORP01/23/2023
DOB NOWSidewalk ShedSigned-offSAFE-SHEILD ENTERPRISE IN12/20/2022
BISPLISSUEDCATMAN PLUMBING INC11/10/2010
BISPLISSUEDCATMAN PLUMBING INC10/01/2010
BISPLISSUEDCATMAN PLUMBING INC12/03/2008
BISPLISSUEDCATMAN PLUMBING INC12/11/2006
BIS—ISSUEDHONG KONG STYLE CONST INC12/11/2006
BISPLISSUEDCATMAN PLUMBING INC03/08/2006
BISOTISSUEDHONG KONG STYLE CONST INC03/07/2006
1 project · most recent 04/24/2025
Ventilation Systems
FiledStatusContractorScope
04/24/2025Permit IssuedJOHN EVAN CONTRACTING CORVentilation Systems
1 project · most recent 07/13/2026
FiledStatusContractorScope
07/13/2026——29 heads
2 projects · most recent 07/13/2026
Water/Sanitary Gas
FiledStatusContractorScope
07/13/2026Permit IssuedHT PLUMBING & HEATING CORGas, Water/Sanitary
04/24/2025——Water/Sanitary
3 projects · most recent 09/04/2026
General Wiring
FiledStatusContractorScope
09/04/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
09/04/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
09/04/2026Permit IssuedJOSEPH WEINSTEIN ELECTRIC6 meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/27/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/24/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/24/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
07/06/2026Tenant Protection Plan Compliance—special
07/06/2026Fire-Resistant Penetrations and JointsRene Navarretespecial
06/25/2026Tenant Protection Plan Compliance—special
06/24/2026Fire-Resistant Penetrations and JointsRene Navarretespecial
04/17/2025Tenant Protection Plan ComplianceTREVOR O. FLOWERSspecial
03/31/2025Tenant Protection Plan ComplianceTREVOR O. FLOWERSspecial
03/27/2025FinalTREVOR O. FLOWERSprogress
03/27/2025Mechanical SystemsTREVOR O. FLOWERSspecial
11/15/2023Tenant Protection Plan ComplianceJay Kavispecial
10/06/2023FinalDe Gaoprogress
10/06/2023Mechanical SystemsJay Kavispecial
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/28/2026B00784584-I1Request digital key ↗
08/28/2026B00784587-I1Request digital key ↗
08/28/2026B00800372-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION10
11/06/2024302097013Open ↗
10/21/2024302097013Open ↗
05/31/2024302081084Open ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISVERIFY TAX LOT1
05/29/2024302097013Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/28/2026B00784587-I1Open ↗
08/22/2026B01151265-P1Open ↗
08/22/2026B01151265-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/30/2026B01201920-S1Open ↗
08/28/2026B01151265-I1Open ↗
08/25/2026B00944438-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B00944438-I1Open ↗
08/24/2026B01201920-S2Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/22/2026B01151265-P1Open ↗
08/22/2026B01151265-I1Open ↗
08/13/2026B01201920-I1Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports3
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
05/29/2024302097013Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/21/2024302081084Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
06/21/2024302081084Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT (FINAL): PW32
06/21/2024302081084Open ↗
05/13/2024302097013Open ↗
▸Other Documents4
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7792
06/21/2024302081084Open ↗
05/29/2024302097013Open ↗
▸BISPLOT DIAGRAM1
12/18/2024302097013Open ↗
▸BIS* FIRE STOPS 27-3451
05/29/2024302097013Open ↗