Miscellaneous two family
4 VIRGINIA PLACE
BROOKLYN · BIN 3031725
💬 Discuss this project
1902Year Built
2Stories
B9Building Class
R6Zoning
2,550 sfGross Floor Area
2Units
Miscellaneous two family · 1,530 sf lot · 1.67 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOTIR ASSOCIATES108/13/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FIRST RESPONSE CLEANING CGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE2050108/13/2021
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
08/23/2022
Signed off — Alteration
B00575688-I1
08/19/2021
Permit issued — General Construction
B00575688-I1-GC
08/13/2021
Filed — Alteration
B00575688-I1
08/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
08/12/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
08/12/2021
Special inspection requirement — Final
Hany Demetry
08/12/2021
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
08/12/2021
Special inspection requirement — Lighting in dwelling units
PAUL MARINO
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFIRST RESPONSE CLEANING C08/19/2021
1 project · most recent 10/26/2021
General Wiring
FiledStatusContractorScope
10/26/2021Permit IssuedSWITCH ELECT OF THE FIVEGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/12/2021Fire-Resistant Penetrations and JointsPAUL MARINOspecial
08/12/2021Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
08/12/2021FinalHany Demetryprogress
08/12/2021Energy Code Compliance InspectionsPAUL MARINOprogress
08/12/2021Lighting in dwelling unitsPAUL MARINOenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
09/01/2026B00575688-I1Request digital key ↗
▸Applications & Permits1
▸DOB NOWLPC Approval/Permit1
09/01/2026B00575688-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026B00575688-I1Open ↗
08/23/2026B00575688-I1Open ↗
08/23/2026B00575688-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026B00575688-I1Open ↗
08/23/2026B00575688-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
09/01/2026B00575688-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/01/2026B00575688-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00575688-I1Open ↗