← Back
BuildNYC
Elevator cooperative
4 WEST 105TH STREET
MANHATTAN · BIN 1055498
💬 Discuss this project
1900Year Built
6Stories
D4Building Class
R8BZoning
21,168 sfGross Floor Area
35Units
Rent Stabilized47 Active Violations 43 unresolved · 4 paperwork only 3 likely answered 3 old, status unconfirmed ▸
Elevator cooperative · Owner of record: 4-6 West 105 St Hsing Develop FND · 5,046 sf lot · 4.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 6Unit 6F1p · 1 filing · 5 docs
Floor 5
Floor 4Unit 4D1 filing · 5 docs
Floor 3Unit 3D3p · 1 filing · 6 docs
Floor 2
Floor 1Unit 1A2p · 2 filings · 8 docs
Cellar3p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
46 West 105 St Hofc303/21/2026
NYC Department of Housing Preservation and Development203/21/2026
4-6 West 105 St Hsing Develop FND103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Francisco D Perez PE109/03/2026
Andres Diaz Architect111/14/2025
Biordi Engineering Consulting209/26/2022
Rybak Architects102/18/2022
C3D Architecture103/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JC Management403/21/2026
Jewel Expediting103/21/2026
Francisco Perez PE103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JC Consulting & ManagementGeneral Contractor507/08/2026
Jimenez LuisElectrical203/21/2026
L J Electrical ServiceElectrical203/21/2026
Syed-Naqvi AltafElectrical103/21/2026
Alson Electrical ContractingElectrical103/21/2026
S. J. ElectricElectrical103/21/2026
World Concrete Solutionsspecialty_contractor104/09/2026
Gemini Electric CoElectrical103/21/2026
Bobtek ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Francisco D. Perez PE3306209/03/2026
S&S Concrete & Soil Testi1008102/18/2022
Building Lifecycle
All (9)Filed (6)Signed Off (3)
09/03/2026
Filed — Alteration
WOOD FLOOR JOIST FRAMING REPAIRS IN APARTMENT 4D, NO CHANGE IN, USE, OCCUPANCY OR EGRESS.
M01454967-I1
01/23/2026
Signed off — Alteration
WOOD FLOOR JOIST FRAMING REPAIRS IN APARTMENT 3D, NO CHANGE IN, USE, OCCUPANCY OR EGRESS.
M01316922-I1
11/14/2025
Filed — Alteration
WOOD FLOOR JOIST FRAMING REPAIRS IN APARTMENT 3D, NO CHANGE IN, USE, OCCUPANCY OR EGRESS.
M01316922-I1
01/23/2023
Signed off — Alteration
M08010116-I1
09/26/2022
Filed — Alteration
M08010116-I1
08/18/2022
Filed — Alteration
M00791721-I1
05/24/2022
Signed off — Alteration
M00673463-I1
02/18/2022
Filed — Alteration
M00673463-I1
03/24/2021
Filed — Alteration
REMOVAL OF KITCHEN CABINETS, FLOOR TILES AND INSTALLING NEW KITCHEN CABINETS IN NEW LOCATION. REMOVAL OF EXISTING BATHROOM FIXTURES AND TILES. INSTALLING NEW BATHROOM FIXTURES AND TILES IN THE SAME LOCATION.
M00489099-I1
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.