4 WEST 109 STREET
MANHATTAN · Upper West Side-Manhattan Valley · BIN 1055727
💬 Discuss this project
1890Year Built
6Stories
D4Building Class
R7-2Zoning
35,376 sfGross Floor Area
41Units
Rent Stabilized0 Open ViolationsFISP: SAFE
Elevator cooperative · Owner of record: WEST 109 OWNERS CORP · 8,747 sf lot · 4.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Roof1p · 1 filing · 20 docs
Floor 635p · 2 filings · 15 docs
Floor 535p · 2 filings · 15 docs
Floor 435p · 2 filings · 15 docs
Floor 335p · 2 filings · 15 docs
Floor 235p · 2 filings · 15 docs
Floor 135p · 2 filings · 15 docs
Cellar39p · 2 filings · 15 docs
Site & exterior34p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEST 109 OWNERS1603/22/2026
ALEXANDER WOLF COMPANY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERS LLC304/28/2025
BOWERY ENGINEERING, PLLC301/18/2024
FL&M ENGINEERING DESIGN &INSPECTION408/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO803/21/2026
BERTOLINI ARCHITECTURAL WORKS DPC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor1007/08/2026
EKA CONTRACTING LLCGeneral Contractor807/08/2026
SKYLINE RESTORATION INCGeneral Contractor203/21/2026
METRO INCORPORATEDPlumbing207/08/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERS, P.C.3868304/28/2025
ATLAS ATC ENGINEERING INC8011301/18/2024
Building Lifecycle
All (92)Filed (10)Permit Issued (11)Signed Off (5)Facade (FISP) (12)Violation (28)Inspection (3)Special Inspection (23)
01/05/2026
Cycle 10 facade report submitted
12/18/2025
Cycle 10 facade report signed — SAFE
11/25/2025
Cycle 10 facade inspection completed
07/01/2025
Signed off — Alteration
Removal of existing gas boilers and installation of new electric hot water heaters.
M00831803-I1
05/07/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/05/2025
Signed off — Alteration
Installation of new HPAC units throughout the building.
M00831802-I1
05/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Tobias
04/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Tobias
04/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
Michael Tobias
04/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
Michael Tobias
04/30/2025
Special inspection requirement — Maintenance information
Michael Tobias
04/28/2025
Filed — Alteration
Removal of existing gas boilers and installation of new electric hot water heaters.
M00831803-P1
04/15/2025
Permit issued — Mechanical Systems
M00831802-I1-MS
03/21/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/11/2024
Signed off — Alteration
INSTALLATION OF 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00661375-I1
11/11/2024
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS.PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00846520-I1
09/19/2024
Permit issued — Plumbing
M00831803-I1-PL
09/04/2024
Permit issued — Mechanical Systems
M00831802-I1-MS
03/25/2024
Permit issued — Mechanical Systems
M00831802-I1-MS
02/16/2024
Cycle 9 facade report submitted
02/16/2024
Cycle 9 facade report signed — SAFE
02/05/2024
Signed off — Alteration
EXTERIOR RESTORATION: BRICK REPLACEMENT, LINTEL AND SILL REPLACEMENT, CAST STONE REPLACEMENT, STUCCO PATCH REPAIRS. MISC REPAIRS AND THRU-WALL A/C SLEEVE & LOUVER INSTALLATION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00742396-I1
01/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
GIORGI KHARDZEISHVILI
01/19/2024
Special inspection requirement — Final
Matteen Gafary
01/19/2024
Special inspection requirement — Energy Code Compliance Inspections
Matteen Gafary
01/19/2024
Special inspection requirement — Masonry
GIORGI KHARDZEISHVILI
01/18/2024
Filed — Alteration
EXTERIOR RESTORATION: BRICK REPLACEMENT, LINTEL AND SILL REPLACEMENT, CAST STONE REPLACEMENT, STUCCO PATCH REPAIRS. MISC REPAIRS AND THRU-WALL A/C SLEEVE & LOUVER INSTALLATION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00742396-P2
01/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
GIORGI KHARDZEISHVILI
01/12/2024
Special inspection requirement — Masonry
GIORGI KHARDZEISHVILI
01/12/2024
Special inspection requirement — Final
Matteen Gafary
01/12/2024
Special inspection requirement — Energy Code Compliance Inspections
Matteen Gafary
01/09/2024
Cycle 9 facade inspection completed
01/02/2024
Permit issued — Sidewalk Shed
M00661375-I1-SH
11/14/2023
Filed — Alteration
EXTERIOR RESTORATION: BRICK REPLACEMENT, LINTEL AND SILL REPLACEMENT, CAST STONE REPLACEMENT, STUCCO PATCH REPAIRS. MISC REPAIRS AND THRU-WALL A/C SLEEVE & LOUVER INSTALLATION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00742396-P1
10/18/2023
Special inspection requirement — Masonry
GIORGI KHARDZEISHVILI
10/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
GIORGI KHARDZEISHVILI
10/18/2023
Special inspection requirement — Energy Code Compliance Inspections
Matteen Gafary
10/18/2023
Special inspection requirement — Final
Matteen Gafary
09/07/2023
Permit issued — Plumbing
M00831803-I1-PL
08/25/2023
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS.PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00846520-P1
08/25/2023
Permit issued — Mechanical Systems
M00831802-I1-MS
08/16/2023
Cycle 9 facade report submitted
08/16/2023
Cycle 9 facade report signed — UNSAFE
06/20/2023
Cycle 9 facade inspection completed
04/27/2023
Permit issued — General Construction
M00742396-I1-GC
04/25/2023
Filed — Alteration
Removal of existing gas boilers and installation of new electric hot water heaters.
M00831803-I1
04/25/2023
Filed — Alteration
Installation of new HPAC units throughout the building.
M00831802-I1
03/28/2023
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS.PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00846520-I1
03/28/2023
Filed — Alteration
INSTALLATION OF 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00661375-P1
03/28/2023
Permit issued — Supported Scaffold
M00846520-I1-SF
03/23/2023
Special inspection requirement — HVAC-R and service water heating system controls
Michael Tobias
03/23/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Tobias
03/23/2023
Special inspection requirement — HVAC-R and service water heating equipment
Michael Tobias
03/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Tobias
02/19/2023
Special inspection requirement — Final
Michael Tobias
02/19/2023
Special inspection requirement — Mechanical Systems
Michael Tobias
01/13/2023
Permit issued — Sidewalk Shed
M00661375-I1-SH
08/09/2022
Filed — Alteration
EXTERIOR RESTORATION: BRICK REPLACEMENT, LINTEL AND SILL REPLACEMENT, CAST STONE REPLACEMENT, STUCCO PATCH REPAIRS. MISC REPAIRS AND THRU-WALL A/C SLEEVE & LOUVER INSTALLATION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00742396-I1
02/18/2022
Cycle 9 facade report submitted
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offEKA CONTRACTING LLC04/15/2025
DOB NOWPlumbingSigned-offMETRO INCORPORATED09/19/2024
DOB NOWMechanical SystemsSigned-offEKA CONTRACTING LLC09/04/2024
DOB NOWMechanical SystemsSigned-offEKA CONTRACTING LLC03/25/2024
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC01/02/2024
DOB NOWPlumbingSigned-offMETRO INCORPORATED09/07/2023
DOB NOWMechanical SystemsSigned-offEKA CONTRACTING LLC08/25/2023
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC04/27/2023
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC03/28/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC01/13/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC01/14/2022
BISBLISSUEDSENID PL & HTG CORP02/08/2016
BISPLISSUEDSENID PL & HTG CORP02/05/2016
BISOTISSUEDRAZE CONTRACTING INC09/26/2013
BISEQISSUEDARSENAL SCAFFOLD INC06/24/2013
BISOTISSUEDRAZE CONTRACTING INC11/26/2012
BISEQISSUEDARSENAL SCAFFOLD INC11/02/2012
BISPLISSUEDPFEIFFER P,HTG,SPKL CONT10/08/2012
BISOTISSUEDSAFDESIGN INC09/05/2012
BISOTISSUEDH DIAS INC10/12/2010
BISPLISSUEDALGOZINI PLUMBING CORP10/22/2007
BISOTISSUEDG.GRECH CONSTRUCTION/PAINTING09/24/2007
BISEQISSUEDSTEEL INDURSTRIES02/09/2004
BISOTISSUEDQUALITY BUILD CONSTR09/29/2003
BISEQISSUEDSTEEL SCAFFOLDING09/17/2003
4 projects · most recent 03/23/2025
General Wiring
FiledStatusContractorScope
03/23/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
05/21/2023Permit IssuedJTE ELECTRICAL SERVICES—
07/13/2022CompleteROBERT CHIMENTI43 meters, 1 new_meters
01/19/2022CompleteTOP SHELF ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/07/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/21/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
04/30/2025HVAC-R and service water piping design and insulationMichael Tobiasenergy_progress
04/30/2025Fire-Resistant Penetrations and JointsMichael Tobiasspecial
04/30/2025HVAC-R and service water heating system controlsMichael Tobiasenergy_progress
04/30/2025HVAC-R and service water heating equipmentMichael Tobiasenergy_progress
04/30/2025Maintenance informationMichael Tobiasenergy_progress
01/19/2024Structural Stability – Alterations of existing buildingsGIORGI KHARDZEISHVILIspecial
01/19/2024FinalMatteen Gafaryprogress
01/19/2024Energy Code Compliance InspectionsMatteen Gafaryprogress
01/19/2024MasonryGIORGI KHARDZEISHVILIspecial
01/12/2024Structural Stability – Alterations of existing buildingsGIORGI KHARDZEISHVILIspecial
01/12/2024MasonryGIORGI KHARDZEISHVILIspecial
01/12/2024FinalMatteen Gafaryprogress
01/12/2024Energy Code Compliance InspectionsMatteen Gafaryprogress
10/18/2023MasonryGIORGI KHARDZEISHVILIspecial
10/18/2023Structural Stability – Alterations of existing buildingsGIORGI KHARDZEISHVILIspecial
10/18/2023Energy Code Compliance InspectionsMatteen Gafaryprogress
10/18/2023FinalMatteen Gafaryprogress
03/23/2023HVAC-R and service water heating system controlsMichael Tobiasenergy_progress
03/23/2023HVAC-R and service water piping design and insulationMichael Tobiasenergy_progress
03/23/2023HVAC-R and service water heating equipmentMichael Tobiasenergy_progress
03/23/2023Fire-Resistant Penetrations and JointsMichael Tobiasspecial
02/19/2023FinalMichael Tobiasprogress
02/19/2023Mechanical SystemsMichael Tobiasspecial
▾Documents — 143 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/03/2026M00661375-P1Request digital key ↗
09/03/2026M00661375-I1Request digital key ↗
08/31/2026M00831802-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits21
▸BISPLAN / WORK APPROVAL APPLICATION11
05/17/2016122672731Open ↗
05/03/2016122672731Open ↗
02/04/2016122672731Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION10
02/16/2016122672731Open ↗
02/11/2016122672731Open ↗
10/08/2013121434670Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications48
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
09/22/2016122672731Open ↗
02/04/2016122672731Open ↗
02/04/2016122672731Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/31/2026M00831803-I1Open ↗
08/29/2026M00846520-P1Open ↗
08/29/2026M00846520-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026M00742396-P1Open ↗
09/02/2026M00742396-P1Open ↗
08/28/2026M00831803-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026M00742396-P1Open ↗
09/02/2026M00742396-P1Open ↗
08/28/2026M00831803-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
02/04/2016122672731Open ↗
11/21/2012121423664Open ↗
11/15/2012121434670Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
11/21/2012121423664Open ↗
11/15/2012121434670Open ↗
09/11/2010120465745Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/04/2016122672731Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
05/17/2016122672731Open ↗
05/03/2016122672731Open ↗
02/04/2016122672731Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING4
12/11/2012121341244Open ↗
11/15/2012121434670Open ↗
08/15/2012121341244Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
03/07/2013121341244Open ↗
01/10/2011120465745Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
05/17/2016122672731Open ↗
05/03/2016122672731Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
08/15/2012121341244Open ↗
▸BISTenant Protection Plan and Notes1
02/04/2016122672731Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/31/2026M00831803-I1Open ↗
08/28/2026M00742396-P1Open ↗
08/28/2026M00742396-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
02/04/2016122672731Open ↗
02/04/2016122672731Open ↗
11/15/2012121434670Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/11/2010120465745Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/21/2012121423664Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
09/22/2016122672731Open ↗
02/04/2016122672731Open ↗
02/04/2016122672731Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
09/22/2016122672731Open ↗
02/18/2014121434670Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00831803-I1Open ↗
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
09/22/2016122672731Open ↗
02/18/2014121434670Open ↗
12/31/2013121423664Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
11/21/2012121423664Open ↗
11/15/2012121434670Open ↗
08/15/2012121341244Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/09/2011120465745Open ↗
▸BISSHED LETTER1
07/01/2013121423664Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
09/22/2016122672731Open ↗
02/04/2016122672731Open ↗
02/18/2014121434670Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET5
02/04/2016122672731Open ↗
11/21/2012121423664Open ↗
11/15/2012121434670Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION3
05/17/2016122672731Open ↗
05/03/2016122672731Open ↗
12/17/2012121341244Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
12/07/2012121341244Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
11/27/2012121434670Open ↗