Zoned residential, not Manhattan
4 WIMAN PLACE
STATEN ISLAND · BIN 5177245
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R4Zoning
0 sfGross Floor Area
0Units
Zoned residential, not Manhattan · Owner of record: SYLVATON HOLDINGS LLC · 6,162 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureGeneral
Floor 21p · 1 filing · 6 docs
Floor 1
Cellar1p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SIMINO ARCHITECT111/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SIMINO ARCHITECT103/21/2026
Building Lifecycle
All (45)Filed (1)Objection (27)Special Inspection (17)
12/16/2025
Objection raised — Zoning
12/16/2025
Objection raised — Zoning
12/16/2025
Objection raised — Structural
12/15/2025
Objection raised — Zoning
12/15/2025
Objection raised — Zoning
12/15/2025
Objection raised — Structural
12/15/2025
Objection raised — Zoning
12/15/2025
Objection raised — Fire_Protection
12/15/2025
Objection raised — Admin
12/15/2025
Objection raised — Structural
12/15/2025
Objection raised — Structural
12/15/2025
Objection raised — Fire_Protection
12/15/2025
Objection raised — Structural
12/15/2025
Objection raised — Structural
12/15/2025
Objection raised — Structural
12/15/2025
Objection raised — Zoning
12/15/2025
Objection raised — Fire_Protection
12/15/2025
Objection raised — Structural
12/15/2025
Objection raised — Inspections
12/15/2025
Objection raised — Admin
12/15/2025
Objection raised — Zoning
12/15/2025
Objection raised — Structural
12/15/2025
Objection raised — Zoning
12/15/2025
Objection raised — Energy
12/15/2025
Objection raised — Zoning
12/15/2025
Objection raised — Zoning
12/15/2025
Objection raised — Scope
11/06/2025
Filed — New Building
NEW 3-FAMILY RESIDENCE.
S01275717-I1
10/27/2025
Special inspection requirement — Combustible Exterior Wall Coverings
10/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/27/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
10/27/2025
Special inspection requirement — Subgrade Inspections
10/27/2025
Special inspection requirement — Energy Code Compliance Inspections
10/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
10/27/2025
Special inspection requirement — Fenestration air leakage
10/27/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
10/27/2025
Special inspection requirement — Air barrier - visual inspection
10/27/2025
Special inspection requirement — Lighting controls
10/27/2025
Special inspection requirement — Fenestration areas
10/27/2025
Special inspection requirement — Exterior lighting power
10/27/2025
Special inspection requirement — Maintenance information
10/27/2025
Special inspection requirement — Lighting in dwelling units
10/27/2025
Special inspection requirement — Insulation placement and R values
10/27/2025
Special inspection requirement — Metering
10/27/2025
Special inspection requirement — Protection of exposed foundation insulation
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
10/27/2025Combustible Exterior Wall Coverings—special
10/27/2025Fire-Resistant Penetrations and Joints—special
10/27/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
10/27/2025Subgrade Inspections—special
10/27/2025Energy Code Compliance Inspections—progress
10/27/2025Fire-Resistance Rated Construction—progress
10/27/2025Fenestration air leakage—energy_progress
10/27/2025Fenestration and door U-factor and product ratings—energy_progress
10/27/2025Air barrier - visual inspection—energy_progress
10/27/2025Lighting controls—energy_progress
10/27/2025Fenestration areas—energy_progress
10/27/2025Exterior lighting power—energy_progress
10/27/2025Maintenance information—energy_progress
10/27/2025Lighting in dwelling units—energy_progress
10/27/2025Insulation placement and R values—energy_progress
10/27/2025Metering—energy_progress
10/27/2025Protection of exposed foundation insulation—energy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01275717-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01275717-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01275717-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026S01275717-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/13/2026S01275717-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S01275717-I1Open ↗