← Back
Predominantly retail with other uses
40-01 149 PLACE
QUEENS · BIN 4114036
💬 Discuss this project
1945Year Built
2Stories
K4Building Class
R5Zoning
3,550 sfGross Floor Area
3Units
2 Open Violations ▸
Predominantly retail with other uses · Owner of record: 40-01 149TH PL LLC · 1,420 sf lot · 2.5 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 15p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
149 PLACE1903/22/2026
149 PL.,L.L.C.2503/22/2026
149 PLAZA103/22/2026
CAMALIA103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/26/2023$1.4M—— → —$408/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALPHA HOME DESIGN LLC406/19/2024
HC ARCHITECT, PC107/08/2022
ALLEN SHINFELD, P.E. PLLC210/11/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YOUN DESIGN CORP403/21/2026
INDESIGN STUDIO803/21/2026
ZIUM ARCH203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREAT ONE CONSTRUCTION LLGeneral Contractor203/21/2026
NEPTUNE SIGNS AWNINGSScaffold207/08/2026
LOGOS SERVICE3CORPGeneral Contractor107/08/2026
LG ELITE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YAN GAO6619406/19/2024
Building Lifecycle
All (89)Filed (7)Permit Issued (5)Signed Off (4)Violation (48)Inspection (3)Special Inspection (22)
07/15/2024
Signed off — Alteration
INTERIOR RENOVATION AND MECHANICAL HOOD OF FOR COMMERCIAL KITCHEN AT 001. AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00998609-I1
07/12/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/20/2024
Special inspection requirement — Energy Code Compliance Inspections
YAN GAO
06/20/2024
Special inspection requirement — Final
YAN GAO
06/20/2024
Special inspection requirement — Interior lighting power
YAN GAO
06/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
YAN GAO
06/20/2024
Special inspection requirement — Duct leakage testing, insulation and design
YAN GAO
06/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
YAN GAO
06/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
YAN GAO
06/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAN GAO
06/20/2024
Special inspection requirement — Mechanical Systems
YAN GAO
06/19/2024
Filed — Alteration
INTERIOR RENOVATION AND MECHANICAL HOOD OF FOR COMMERCIAL KITCHEN AT 001. AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00998609-P1
06/19/2024
Filed — Alteration
FILE FOR PLUMBING WORK FOR COMMERCIAL KITCHEN. AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00998627-P1
06/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
06/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAN GAO
06/19/2024
Special inspection requirement — Energy Code Compliance Inspections
YAN GAO
06/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
YAN GAO
06/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAN GAO
06/19/2024
Special inspection requirement — Mechanical Systems
YAN GAO
06/19/2024
Special inspection requirement — Energy Code Compliance Inspections
YAN GAO
06/19/2024
Special inspection requirement — Final
YAN GAO
06/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
06/19/2024
Special inspection requirement — Duct leakage testing, insulation and design
YAN GAO
06/19/2024
Special inspection requirement — Interior lighting power
YAN GAO
06/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
05/09/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/29/2024
Permit issued — Plumbing
Q00998627-I1-PL
03/14/2024
Permit issued — General Construction
Q00998609-I1-GC-CX
02/05/2024
Filed — Alteration
INTERIOR RENOVATION AND MECHANICAL HOOD OF FOR COMMERCIAL KITCHEN AT 001. AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00998609-I1
02/05/2024
Filed — Alteration
FILE FOR PLUMBING WORK FOR COMMERCIAL KITCHEN. AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00998627-I1
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/28/2022
Signed off — Alteration
Q00768917-I1
07/13/2022
Permit issued — General Construction
Q00768917-I1-GC
07/08/2022
Filed — Alteration
Q00768917-I1
07/06/2022
Special inspection requirement — Final
Hackjong Choi
12/07/2020
Signed off — Alteration
ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q00243307-I1
12/07/2020
Signed off — Alteration
ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q00243299-I1
10/15/2020
Violation issued (ECB, closed)
Construction
03/12/2020
Violation issued (ECB, closed)
Construction
03/12/2020
Violation issued (ECB, closed)
Construction
03/12/2020
Violation issued (ECB, closed)
Construction
01/11/2020
Violation issued (ECB, closed)
Construction
01/11/2020
Violation issued (ECB, closed)
Construction
01/11/2020
Violation issued (ECB, closed)
Construction
12/05/2019
Permit issued — Sign
Q00243307-I1-SG
12/04/2019
Permit issued — Sign
Q00243299-I1-SG
11/22/2019
Violation issued (ECB, closed)
Construction
11/22/2019
Violation issued (ECB, closed)
Construction
11/22/2019
Violation issued (ECB, closed)
Construction
10/11/2019
Filed — Alteration
ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q00243307-I1
10/11/2019
Filed — Alteration
ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q00243299-I1
09/26/2019
Violation issued (ECB, closed)
Construction
09/26/2019
Violation issued (ECB, closed)
Construction
09/26/2019
Violation issued (ECB, closed)
Construction
08/22/2019
Violation issued (ECB, closed)
Construction
08/22/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/22/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/22/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedLG ELITE PLUMBING INC03/29/2024
DOB NOWGeneral ConstructionSigned-offGREAT ONE CONSTRUCTION LL03/14/2024
DOB NOWGeneral ConstructionSigned-offLOGOS SERVICE3CORP07/13/2022
DOB NOWSignPermit IssuedNEPTUNE SIGNS&AWNINGS INC12/05/2019
DOB NOWSignPermit IssuedNEPTUNE SIGNS&AWNINGS INC12/04/2019
BISOTISSUEDWING LEE CONTRACTOR INC07/26/2013
BISPLISSUEDFLYTIGER P & H LTD06/17/2013
BISMHISSUEDWING LEE CONTRACTOR INC06/11/2013
BISPLISSUEDC.R.U. MECHAN & HEAT INC09/11/2012
BISSPISSUEDC.R.U. MECHAN & HEATIN IN09/11/2012
BISPLISSUEDAVON PLBG & HTG INC08/01/2011
BISOTISSUEDSIN DO CONSTRUCTION INC04/20/2011
BISEQISSUEDWING LEE CONTRACTOR INC07/21/2010
BIS—ISSUEDWING LEE CONTRACTOR INC07/21/2010
BISPLISSUEDFLYTIGER P & H LTD04/22/2010
BISEQISSUEDWING LEE CONTRACTOR INC04/19/2010
BIS—ISSUEDWING LEE CONTRACTOR INC04/19/2010
BIS—ISSUEDTREND 21 DESIGN&BUILD INC04/05/2010
BISPLISSUEDAVON PLBG & HTG INC04/05/2010
BISEQISSUEDTREND 21 DESIGN&BUILD INC04/05/2010
BISOTISSUEDKORMAN DESIGN & BUILD12/02/2002
BISFPISSUEDSENTINEL FIRE CONTROL, INC.04/08/1991
1 project · most recent 06/19/2024
Gas Water/Sanitary
FiledStatusContractorScope
06/19/2024Permit IssuedLG ELITE PLUMBING INCGas, Water/Sanitary
4 projects · most recent 03/29/2024
FiledStatusContractorScope
03/29/2024CompleteGOODALL ELECTRIC CORP—
10/03/2022CompleteJONG HYUN KIM—
10/20/2019CompleteJONG HYUN KIM—
10/20/2019CompleteJONG HYUN KIM—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/12/2024Pass-Final General Construction Non-Directive 14PassView ↗
05/09/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
06/20/2024Energy Code Compliance InspectionsYAN GAOprogress
06/20/2024FinalYAN GAOprogress
06/20/2024Interior lighting powerYAN GAOenergy_progress
06/20/2024HVAC-R and service water heating system controlsYAN GAOenergy_progress
06/20/2024Duct leakage testing, insulation and designYAN GAOenergy_progress
06/20/2024HVAC-R and service water heating equipmentYAN GAOenergy_progress
06/20/2024HVAC-R and service water piping design and insulationYAN GAOenergy_progress
06/20/2024Fire-Resistant Penetrations and JointsYAN GAOspecial
06/20/2024Mechanical SystemsYAN GAOspecial
06/19/2024HVAC-R and service water piping design and insulation—energy_progress
06/19/2024Fire-Resistant Penetrations and JointsYAN GAOspecial
06/19/2024Energy Code Compliance InspectionsYAN GAOprogress
06/19/2024HVAC-R and service water piping design and insulationYAN GAOenergy_progress
06/19/2024Fire-Resistant Penetrations and JointsYAN GAOspecial
06/19/2024Mechanical SystemsYAN GAOspecial
06/19/2024Energy Code Compliance InspectionsYAN GAOprogress
06/19/2024FinalYAN GAOprogress
06/19/2024HVAC-R and service water heating system controls—energy_progress
06/19/2024Duct leakage testing, insulation and designYAN GAOenergy_progress
06/19/2024Interior lighting powerYAN GAOenergy_progress
06/19/2024HVAC-R and service water heating equipment—energy_progress
07/06/2022FinalHackjong Choiprogress
▾Documents — 226 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch5
08/26/2026Q00768917-I1Request digital key ↗
08/22/2026Q00998609-I1Request digital key ↗
08/22/2026Q00998609-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sign2
08/28/2026Q00243299-I1Request digital key ↗
08/28/2026Q00243307-I1Request digital key ↗
▸Applications & Permits52
▸BISPLAN / WORK APPROVAL APPLICATION25
02/02/2021420612607Open ↗
04/22/2020420131119Open ↗
01/03/2020420131119Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION18
11/02/2013420881488Open ↗
08/03/2013420839819Open ↗
06/21/2013420839819Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION7
08/17/2021420131119Open ↗
07/21/2021420131119Open ↗
05/21/2021420131119Open ↗
Showing 3 of 7 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
07/16/2014420839819Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/08/2010420131119Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
05/24/2021420131119Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/22/2021420131119Open ↗
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature14
08/28/2026Q00998627-P1Open ↗
08/28/2026Q00998627-P1Open ↗
08/25/2026Q00998609-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
06/17/2013420839819Open ↗
08/18/2011420463251Open ↗
07/28/2011420463251Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026Q00243299-I1Open ↗
08/22/2026Q00998627-I1Open ↗
08/13/2026Q00243307-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026Q00998627-P1Open ↗
08/25/2026Q00998609-I1Open ↗
08/22/2026Q00998609-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/08/2013420839819Open ↗
04/25/2008410103141Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/25/2008410103141Open ↗
▸Trade Schedules & Equipment33
▸BISSELF-CERT PLUMBING NOTICE13
12/26/2013420839819Open ↗
09/04/2013420839819Open ↗
08/18/2011420463251Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING7
06/08/2013420839819Open ↗
07/28/2011420463251Open ↗
10/06/2010420131119Open ↗
Showing 3 of 7 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
05/26/2011420131119Open ↗
05/04/2011420131119Open ↗
04/18/2011420131119Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B3
04/13/2011420131119Open ↗
03/02/2011420131119Open ↗
03/02/2011420131119Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/04/2021420131119Open ↗
02/02/2010420131119Open ↗
▸BISDETECTOR:SMOKE-CERTIFICATE OF INSTALLATION2
07/25/2012420131119Open ↗
04/18/2011420131119Open ↗
▸BISEQUIPMENT USE PERMITS1
08/04/2021420131119Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
03/31/2011420131119Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
12/26/2013420839819Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan2
08/28/2026Q00243299-I1Open ↗
08/13/2026Q00243307-I1Open ↗
▸BISSTREET TREE CHECKLIST1
02/02/2010420131119Open ↗
▸BISSTREET TREE SIGNOFF1
03/11/2021420131119Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/22/2026Q00998627-I1Open ↗
08/13/2026Q00998627-P1Open ↗
08/13/2026Q00998609-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
07/28/2011420463251Open ↗
02/02/2010420131119Open ↗
04/25/2008410103141Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/02/2013420881488Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
03/12/2011420331386Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/16/2014420839819Open ↗
06/17/2013420839819Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
07/16/2014420839819Open ↗
08/18/2011420463251Open ↗
▸BISTECHNICAL REPORT: ENERGY1
07/28/2011420463251Open ↗
▸Inspections & Test Reports2
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
04/20/2020420131119Open ↗
01/13/2020420131119Open ↗
▸Approvals, Objections & Sign-offs42
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
02/18/2021420131119Open ↗
01/05/2021420131119Open ↗
10/09/2020420131119Open ↗
Showing 3 of 21 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
05/05/2020420131119Open ↗
04/22/2020420131119Open ↗
01/03/2020420131119Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
06/18/2018420131119Open ↗
12/18/2013420881488Open ↗
08/18/2011420463251Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
09/23/2013420881488Open ↗
07/28/2011420463251Open ↗
03/12/2011420331386Open ↗
Showing 3 of 5 on file for this type
▸BISTAP LETTER - FIRE SVC : DEP-FIRE1
03/02/2011420131119Open ↗
▸BISSUPERSEDING LETTER1
04/19/2010420131119Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT8
07/16/2014420839819Open ↗
12/18/2013420881488Open ↗
09/23/2013420881488Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/19/2021420131119Open ↗
▸Filing & Intake Forms21
▸BISADDITIONAL INFORMATION12
08/17/2021420131119Open ↗
05/21/2021420131119Open ↗
05/05/2020420131119Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET6
09/23/2013420881488Open ↗
06/08/2013420839819Open ↗
07/28/2011420463251Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
04/22/2020420131119Open ↗
04/20/2020420131119Open ↗
06/18/2018420131119Open ↗
▸Other Documents3
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
12/18/2013420881488Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
08/04/2021420131119Open ↗
▸BISPLOT DIAGRAM1
02/02/2010420131119Open ↗