← Back
BuildNYC
Two family brick
40-04 50TH AVENUE
QUEENS · Sunnyside · BIN 4002949
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R4Zoning
1,864 sfGross Floor Area
2Units
Two family brick · 2,000 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction9p · 2 filings · 9 docs
Floor 2Under Construction17p · 3 filings · 12 docs
Floor 1Under Construction18p · 3 filings · 12 docs
CellarUnder Construction16p · 3 filings · 12 docs
Site & exteriorUnder Construction1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Lotus 891010/15/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/24/2025$1.3M—Private party → Private party$687/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
All City Engineering310/13/2026
Studio C Architects203/23/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Studio C Architects203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Pinnacle Construction NYGeneral Contractor206/28/2026
GRG Restoration & Solutiospecialty_contractor104/09/2026
Best Plumbing & HVACPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
All City Engineering7115310/13/2026
Building Lifecycle
All (25)Filed (5)Permit Issued (4)Signed Off (1)Inspection (3)Special Inspection (12)
10/13/2026
Filed — Alteration
Install plumbing fixtures for existing two family dwelling. No change in use, egress or occupancy.
Q01373525-P1
09/28/2026
Signed off — Alteration
Install new HVAC system. No change in use, egress or occupancy.
Q01373354-I1
05/28/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/06/2026
Permit issued — Plumbing
Q01373525-I1-PL
03/31/2026
Permit issued — Mechanical Systems
Q01373354-I1-MS
03/27/2026
Filed — Alteration
Install new HVAC system. No change in use, egress or occupancy.
Q01373354-I1
03/27/2026
Filed — Alteration
Install plumbing fixtures for existing two family dwelling. No change in use, egress or occupancy.
Q01373525-I1
03/26/2026
Permit issued — General Construction
Q01370730-I1-GC
03/25/2026
Special inspection requirement — Maintenance information
Liangkai Xia
03/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Liangkai Xia
03/25/2026
Special inspection requirement — Energy Code Compliance Inspections
Liangkai Xia
03/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
Liangkai Xia
03/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
Liangkai Xia
03/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Liangkai Xia
03/23/2026
Filed — Alteration
Patch and repair existing front and rear facades with replacement of existing lintel where required. No change in use, egress or occupancy.
Q01370730-I1
03/11/2026
Special inspection requirement — Final
Wilson Chao
01/23/2026
Permit issued — General Construction
Q01325030-I1-GC
12/23/2025
Filed — Alteration
Interior renovation of existing 2 family dwelling. No change in use, egress or occupancy.
Q01325030-I1
12/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Wilson Chao
12/23/2025
Special inspection requirement — Fenestration air leakage
Wilson Chao
12/23/2025
Special inspection requirement — Lighting in dwelling units
Wilson Chao
12/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Wilson Chao
11/25/2025
Special inspection requirement — Final
Wilson Chao
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBest Plumbing & HVAC04/06/2026
DOB NOWMechanical SystemsSigned-offPinnacle Construction NY03/31/2026
DOB NOWGeneral ConstructionPermit IssuedGRG Restoration & Solutio03/26/2026
DOB NOWGeneral ConstructionPermit IssuedPinnacle Construction NY01/23/2026
1 project · most recent 03/27/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/27/2026Signed-offPinnacle Construction NYHeating and Air Conditioning Systems
Heat / Cool
Daikin #RXTA48AAVJU 48,000 BTU · Heat Pump Outdoor ×2
#RXTA36AAVJU 36,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 10/13/2026
Gas Water/Sanitary
FiledStatusContractorScope
10/13/2026Permit IssuedBest Plumbing & HVACGas, Water/Sanitary
1 project · most recent 01/19/2026
General Wiring
FiledStatusContractorScope
01/19/2026Permit IssuedIntelogic ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/28/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/15/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
03/25/2026Maintenance informationLiangkai Xiaenergy_progress
03/25/2026Fire-Resistant Penetrations and JointsLiangkai Xiaspecial
03/25/2026Energy Code Compliance InspectionsLiangkai Xiaprogress
03/25/2026HVAC-R and service water heating equipmentLiangkai Xiaenergy_progress
03/25/2026HVAC-R and service water heating system controlsLiangkai Xiaenergy_progress
03/25/2026HVAC-R and service water piping design and insulationLiangkai Xiaenergy_progress
03/11/2026FinalWilson Chaoprogress
12/23/2025Energy Code Compliance InspectionsWilson Chaoprogress
12/23/2025Fenestration air leakageWilson Chaoenergy_progress
12/23/2025Lighting in dwelling unitsWilson Chaoenergy_progress
12/23/2025Fenestration and door U-factor and product ratingsWilson Chaoenergy_progress
11/25/2025FinalWilson Chaoprogress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/18/2026Q01325030-I1Request digital key ↗
08/17/2026Q01370730-I1Request digital key ↗
08/17/2026Q01373354-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature8
09/29/2026Q01325030-I1Open ↗
09/29/2026Q01325030-I1Open ↗
09/29/2026Q01325030-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/18/2026Q01325030-I1Open ↗
08/17/2026Q01370730-I1Open ↗
08/17/2026Q01373354-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q01373525-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/18/2026Q01325030-I1Open ↗
08/17/2026Q01370730-I1Open ↗
08/17/2026Q01373354-I1Open ↗
Showing 3 of 4 on file for this type