QUEENS
40-05 218 STREET
QUEENS · Bayside · BIN 4625973
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Architecture
Roof1p · 1 filing · 6 docs
Cellar1p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEI ARCHITECT PLLC105/28/2026
Building Lifecycle
All (43)Filed (1)Objection (18)Special Inspection (24)
08/13/2026
Objection resolved — Resolved
08/13/2026
Objection resolved — Resolved
08/13/2026
Objection resolved — Resolved
08/13/2026
Objection resolved — Resolved
08/13/2026
Objection resolved — Resolved
08/13/2026
Objection resolved — Resolved
08/13/2026
Objection resolved — Resolved
06/22/2026
Objection raised — Scope
06/22/2026
Objection raised — Other
06/22/2026
Objection raised — Structural
06/22/2026
Objection raised — Admin
06/22/2026
Objection raised — Scope
06/22/2026
Objection raised — Structural
06/22/2026
Objection raised — Inspections
06/22/2026
Objection raised — Fire_Protection
06/22/2026
Objection resolved — Addressed
06/22/2026
Objection raised — Zoning
06/22/2026
Objection raised — Energy
05/28/2026
Filed — New Building
Q01396166-I1
05/12/2026
Special inspection requirement — Insulation placement and R values
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/12/2026
Special inspection requirement — Heating Systems
05/12/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/12/2026
Special inspection requirement — Interior lighting power
05/12/2026
Special inspection requirement — Energy Code Compliance Inspections
05/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/12/2026
Special inspection requirement — Maintenance information
05/12/2026
Special inspection requirement — Air barrier — testing
05/12/2026
Special inspection requirement — Fenestration air leakage
05/12/2026
Special inspection requirement — Metering
05/12/2026
Special inspection requirement — Air barrier - visual inspection
05/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/12/2026
Special inspection requirement — Permanent certificate
05/12/2026
Special inspection requirement — Fenestration areas
05/12/2026
Special inspection requirement — Duct leakage testing, insulation and design
05/12/2026
Special inspection requirement — Protection of exposed foundation insulation
05/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/12/2026
Special inspection requirement — Electric vehicle service equipment requirements
05/12/2026
Special inspection requirement — Ventilation and air distribution system
05/01/2026
Special inspection requirement — Final
05/01/2026
Special inspection requirement — Mechanical Systems
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
05/12/2026Insulation placement and R values—energy_progress
05/12/2026Fire-Resistant Penetrations and Joints—special
05/12/2026Heating Systems—special
05/12/2026Subsurface Investigations (Borings/Test Pits)—special
05/12/2026HVAC-R and service water piping design and insulation—energy_progress
05/12/2026Interior lighting power—energy_progress
05/12/2026Energy Code Compliance Inspections—progress
05/12/2026Fire-Resistance Rated Construction—progress
05/12/2026HVAC-R and service water heating system controls—energy_progress
05/12/2026Maintenance information—energy_progress
05/12/2026Air barrier — testing —energy_progress
05/12/2026Fenestration air leakage—energy_progress
05/12/2026Metering—energy_progress
05/12/2026Air barrier - visual inspection—energy_progress
05/12/2026Fenestration and door U-factor and product ratings—energy_progress
05/12/2026Permanent certificate—energy_progress
05/12/2026Fenestration areas—energy_progress
05/12/2026Duct leakage testing, insulation and design—energy_progress
05/12/2026Protection of exposed foundation insulation—energy_progress
05/12/2026HVAC-R and service water heating equipment—energy_progress
05/12/2026Electric vehicle service equipment requirements—energy_progress
05/12/2026Ventilation and air distribution system—energy_progress
05/01/2026Final—progress
05/01/2026Mechanical Systems—special
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026Q01396166-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026Q01396166-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026Q01396166-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01396166-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/15/2026Q01396166-I1Open ↗
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/15/2026Q01396166-I1Open ↗