ECB07/01/2026WORK WITHOUT A PERMIT. OBSERVED PLUMBING WORK HAS BEEN DONE TO INSTALL WATER AND WASTE LINES TO CREATE 3 PIECE BATHROOM (TOILET-SINK-SHOWER) AT CELLAR LEVEL OF THIS LOCATION WITH A PERMIT OR DOB APPROVAL., OBTA$1K due
Locations of Work
No floor-level scope or drawing coverage on file for this building.