← Back
QUEENS
40-13 MAIN ST
QUEENS · BIN 4828269
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Architecture
Floor 22p · 1 filing · 11 docs
Floor 11 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JOA ALEXANDER REALTY1507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALPHA HOME DESIGN LLC304/21/2023
BRIAN ILL DEVELOPMENT LLC104/20/2023
AMERILAND BROOK LLC107/20/2022
ARC CONSULTING ENGINEERS306/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO603/21/2026
AMERILAND BROOK LLC203/21/2026
JRK CREATIVE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GENESIS NYC CONSTRUCTIONGeneral Contractor303/21/2026
SERVICE SIGN ERECTORSScaffold207/08/2026
SPLEN CONSTRUCTION INCGeneral Contractor107/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YAN GAO6619304/21/2023
Building Lifecycle
All (33)Filed (8)Permit Issued (5)Signed Off (4)Inspection (4)Special Inspection (12)
10/25/2024
Signed off — Alteration
Q00862621-I1
06/09/2023
Permit issued — Sign
Q00862621-I1-SG
04/27/2023
Signed off — Alteration
INTERIOR RENOVATION OF COMMERCIAL SPACE ON 2ND FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00799109-I1
04/26/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/24/2023
Special inspection requirement — Interior lighting power
YAN GAO
04/24/2023
Special inspection requirement — Energy Code Compliance Inspections
YAN GAO
04/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
YAN GAO
04/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAN GAO
04/21/2023
Filed — Alteration
INTERIOR RENOVATION OF COMMERCIAL SPACE ON 2ND FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00799109-P1
04/20/2023
Filed — Alteration
Q00862621-I1
04/17/2023
Signed off — Alteration
PLUMBING WORK OF COMMERCIAL SPACE ON 2ND FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00799144-I1
12/01/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/01/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/22/2022
Signed off — Alteration
Q00687220-I1
09/19/2022
Permit issued — Plumbing
Q00799144-I1-PL
09/12/2022
Permit issued — General Construction
Q00799109-I1-GC
08/26/2022
Filed — Alteration
INTERIOR RENOVATION OF COMMERCIAL SPACE ON 2ND FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00799109-I1
08/26/2022
Filed — Alteration
PLUMBING WORK OF COMMERCIAL SPACE ON 2ND FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00799144-I1
08/24/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
YAN GAO
08/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAN GAO
08/24/2022
Special inspection requirement — Energy Code Compliance Inspections
YAN GAO
08/02/2022
Permit issued — Sign
Q00776140-I1-SG
07/20/2022
Filed — Alteration
INSTALL AN ILLUMINATED ACCESSORY BUSINESS SIGN. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00776140-I1
07/16/2022
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
06/04/2022
Permit issued — Construction Fence
Q00687220-I1-FN
06/01/2022
Filed — Alteration
Q00687220-I1
03/17/2022
Filed — Alteration
FILING THIS APPLICATION REPLACE PLUMBING FIXTURES AND INSTALL NEW FIXTURES.FOR EXISTING STORE ON 1ST FL.GENERAL CONSTRUCTION FILING SEPARATE APPLICATION JOB#Q00685090-I1.NO CHANGE IN USE,MEANS OF EGRESS OR OCCUPANCY ON THIS APPLICATION
Q00687215-I1
03/17/2022
Special inspection requirement — Energy Code Compliance Inspections
Withdrawn
02/24/2022
Filed — Alteration
INTERIOR RENOVATION FOR EXISTING RETAIL STORE ON 1ST FL,.NO CHANGE IN USE,MEANS OF EGRESS OR OCCUPANCY.
Q00685090-I1
02/24/2022
Special inspection requirement — Interior lighting power
JAN PEREZ
02/24/2022
Special inspection requirement — Energy Code Compliance Inspections
JAN PEREZ
02/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Withdrawn
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offSERVICE SIGN ERECTORS CO06/09/2023
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG09/19/2022
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC09/12/2022
DOB NOWSignPermit IssuedSERVICE SIGN ERECTORS CO08/02/2022
DOB NOWConstruction FenceSigned-offGENESIS NYC CONSTRUCTION06/04/2022
1 project · most recent 03/17/2022
Water/Sanitary
FiledStatusContractorScope
03/17/2022——Water/Sanitary
3 projects · most recent 04/26/2023
General Wiring
FiledStatusContractorScope
04/26/2023CompleteKJK ELECTRIC INCGeneral Wiring
11/16/2022CompleteINTELOGIC ELECTRIC, INC.1 meters, 1 new_meters
02/18/2022Permit IssuedJ Y ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/26/2023Pass-Final General Construction Non-Directive 14PassView ↗
12/01/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
04/24/2023Interior lighting powerYAN GAOenergy_progress
04/24/2023Energy Code Compliance InspectionsYAN GAOprogress
04/24/2023Fire-Resistance Rated ConstructionYAN GAOprogress
04/24/2023Fire-Resistant Penetrations and JointsYAN GAOspecial
08/24/2022HVAC-R and service water piping design and insulationYAN GAOenergy_progress
08/24/2022Fire-Resistant Penetrations and JointsYAN GAOspecial
08/24/2022Energy Code Compliance InspectionsYAN GAOprogress
07/16/2022Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
03/17/2022Energy Code Compliance InspectionsWithdrawnprogress
02/24/2022Interior lighting powerJAN PEREZenergy_progress
02/24/2022Energy Code Compliance InspectionsJAN PEREZprogress
02/24/2022Fire-Resistant Penetrations and JointsWithdrawnspecial
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026Q00685090-I1Request digital key ↗
08/26/2026Q00687215-I1Request digital key ↗
08/26/2026Q00687220-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026Q00799144-I1Open ↗
09/01/2026Q00799144-I1Open ↗
08/27/2026Q00776140-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026Q00685090-I1Open ↗
08/26/2026Q00687220-I1Open ↗
08/24/2026Q00862621-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026Q00799144-I1Open ↗
08/26/2026Q00799109-I1Open ↗
08/23/2026Q00685090-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026Q00685090-I1Open ↗
08/13/2026Q00799109-I1Open ↗
08/13/2026Q00799109-P1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00799109-I1Open ↗
08/13/2026Q00799144-I1Open ↗