← Back
Two family converted from one family
40-15 UTOPIA PARKWAY
QUEENS · Murray Hill-Broadway Flushing · BIN 4120755
💬 Discuss this project
1950Year Built
2Stories
B3Building Class
R3XZoning
2,061 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 3,181 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 216p · 2 filings · 20 docs
Floor 115p · 1 filing · 20 docs
Cellar16p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3T GC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FANG ARCHITECT709/21/2023
SUNG HO SHIN ARCHITECT, PC106/03/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FANG ARCHITECT303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
3T GC LLCGeneral Contractor603/21/2026
RED SUN RENOVATION INCGeneral Contractor603/21/2026
TOJI DEVELOP NY INCGeneral Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513609/21/2023
Building Lifecycle
All (59)Filed (8)Permit Issued (6)Signed Off (3)Violation (2)Inspection (6)Objection (4)Special Inspection (30)
10/11/2023
Signed off — Alteration
HEREWITH FILED PLUMBING WORK FOR A 2-FAMILY DWELLING.
Q00691730-I1
09/28/2023
Signed off — Alteration
INSTALL TEMP. CONSTRUCTION FENCE IN CONJUNCTION WITH ALT-1 JOB #Q00691616.
Q00705819-I1
09/27/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
09/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
09/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
09/22/2023
Special inspection requirement — Maintenance information
DEZHANG FANG
09/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
09/22/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
09/21/2023
Filed — Alteration
HEREWITH FILED PLUMBING WORK FOR A 2-FAMILY DWELLING.
Q00691730-P2
09/21/2023
Special inspection requirement — Air barrier - visual inspection
DEZHANG FANG
09/21/2023
Special inspection requirement — Structural Steel - Welding
DEZHANG FANG
09/21/2023
Special inspection requirement — Concrete - Cast-In-Place
DEZHANG FANG
09/21/2023
Special inspection requirement — Structural Steel - High Strength Bolting
DEZHANG FANG
09/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
09/21/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
DEZHANG FANG
09/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
DEZHANG FANG
09/21/2023
Special inspection requirement — Masonry
DEZHANG FANG
09/21/2023
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
09/21/2023
Special inspection requirement — Footing and Foundation
DEZHANG FANG
09/21/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
09/21/2023
Special inspection requirement — Final
DEZHANG FANG
09/21/2023
Special inspection requirement — Structural Wood Frame
DEZHANG FANG
09/21/2023
Special inspection requirement — Fenestration areas
DEZHANG FANG
09/21/2023
Special inspection requirement — Interior lighting power
DEZHANG FANG
09/21/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
09/21/2023
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
09/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
09/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
09/21/2023
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
09/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
09/21/2023
Special inspection requirement — Maintenance information
DEZHANG FANG
09/20/2023
Filed — Alteration CO
VERTICAL ENLARGEMENT TO EXISTNG HOUSE AND CONVERT 1 FAMILY TO 2 FAMILIES. TO OBTAIN NEW C OF O
Q00691616-P2
09/15/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
DEZHANG FANG
09/15/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
05/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/07/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/07/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/30/2023
Filed — Alteration
HEREWITH FILED PLUMBING WORK FOR A 2-FAMILY DWELLING.
Q00691730-P1
03/23/2023
Violation issued (ECB, closed)
Construction
03/23/2023
Violation issued (ECB, closed)
Construction
03/15/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/07/2023
Permit issued — General Construction
Q00691616-I1-GC-CX
02/15/2023
Filed — Alteration CO
VERTICAL ENLARGEMENT TO EXISTNG HOUSE AND CONVERT 1 FAMILY TO 2 FAMILIES. TO OBTAIN NEW C OF O
Q00691616-P1
01/12/2023
Permit issued — Plumbing
Q00691730-I1-PL
12/16/2022
Permit issued — General Construction
Q00691616-I1-GC-CX
12/07/2022
Filed — Alteration
HEREWITH FILED PLUMBING WORK FOR A 2-FAMILY DWELLING.
Q00691730-I1
12/07/2022
Permit issued — Construction Fence
Q00705819-I1-FN
12/06/2022
Signed off — Alteration
Q00350822-I1
12/06/2022
Permit issued — Construction Fence
Q00350822-I1-FN
12/05/2022
Filed — Alteration
INSTALL TEMP. CONSTRUCTION FENCE IN CONJUNCTION WITH ALT-1 JOB #Q00691616.
Q00705819-I1
08/11/2022
Objection resolved — Addressed
06/28/2022
Objection resolved — Addressed
03/24/2022
Objection raised — Zoning
03/24/2022
Objection raised — Zoning
03/07/2022
Filed — Alteration CO
VERTICAL ENLARGEMENT TO EXISTNG HOUSE AND CONVERT 1 FAMILY TO 2 FAMILIES. TO OBTAIN NEW C OF O
Q00691616-I1
08/18/2020
Permit issued — Construction Fence
Q00350822-I1-FN
06/03/2020
Filed — Alteration
Q00350822-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit Issued3T GC LLC03/07/2023
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC01/12/2023
DOB NOWGeneral ConstructionPermit Issued3T GC LLC12/16/2022
DOB NOWConstruction FenceSigned-offRED SUN RENOVATION INC12/07/2022
DOB NOWConstruction FenceSigned-offRED SUN RENOVATION INC12/06/2022
DOB NOWConstruction FenceSigned-offTOJI DEVELOP NY INC08/18/2020
BIS—ISSUEDTOJI DEVELOP NY INC08/31/2020
BIS—ISSUEDTOJI DEVELOP NY INC08/25/2020
1 project · most recent 01/12/2023
General Wiring
FiledStatusContractorScope
01/12/2023CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 09/20/2023
Wood
FiledStatusContractorScope
09/20/2023Permit Issued3T GC LLCWood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/07/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/07/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/15/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
09/22/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
09/22/2023HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
09/22/2023HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
09/22/2023Maintenance informationDEZHANG FANGenergy_progress
09/22/2023HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
09/22/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
09/21/2023Air barrier - visual inspectionDEZHANG FANGenergy_progress
09/21/2023Structural Steel - WeldingDEZHANG FANGspecial
09/21/2023Concrete - Cast-In-PlaceDEZHANG FANGspecial
09/21/2023Structural Steel - High Strength BoltingDEZHANG FANGspecial
09/21/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
09/21/2023Excavations - Sheeting, Shoring, and BracingDEZHANG FANGspecial
09/21/2023Structural Stability – Alterations of existing buildingsDEZHANG FANGspecial
09/21/2023MasonryDEZHANG FANGspecial
09/21/2023Fire-Resistance Rated ConstructionDEZHANG FANGprogress
09/21/2023Footing and FoundationDEZHANG FANGprogress
09/21/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
09/21/2023FinalDEZHANG FANGprogress
09/21/2023Structural Wood FrameDEZHANG FANGprogress
09/21/2023Fenestration areasDEZHANG FANGenergy_progress
09/21/2023Interior lighting powerDEZHANG FANGenergy_progress
09/21/2023Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
09/21/2023Insulation placement and R valuesDEZHANG FANGenergy_progress
09/21/2023HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
09/21/2023HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
Latest 25 of 50.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/25/2026Q00705819-I1Request digital key ↗
08/25/2026Q00691730-I1Request digital key ↗
08/25/2026Q00691730-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00350822-I1Request digital key ↗
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION8
10/18/2023421959633Open ↗
10/13/2023421959633Open ↗
01/14/2022421959633Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
08/12/2020421959633Open ↗
08/12/2020421959633Open ↗
07/01/2020421959633Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
11/12/2020421959633Open ↗
11/12/2020421959633Open ↗
08/31/2020421959633Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00691616-P2Open ↗
08/13/2026Q00691616-I1Open ↗
08/13/2026Q00691616-P1Open ↗
▸BISZONING DIAGRAM1
06/05/2020421959633Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00691616-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/28/2026Q00350822-I1Open ↗
08/25/2026Q00691730-I1Open ↗
08/25/2026Q00691730-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q00691616-I1Open ↗
09/01/2026Q00691616-I1Open ↗
08/26/2026Q00691616-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026Q00691616-I1Open ↗
08/26/2026Q00691616-P2Open ↗
08/24/2026Q00691730-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist3
08/24/2026Q00691616-P1Open ↗
08/24/2026Q00691616-P2Open ↗
08/15/2026Q00691616-I1Open ↗
▸BISSTREET TREE CHECKLIST2
01/18/2022421959633Open ↗
05/11/2020421959633Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/24/2026Q00691616-P2Open ↗
08/24/2026Q00691616-P1Open ↗
08/15/2026Q00691616-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/12/2020421959633Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/06/2022421959633Open ↗
08/12/2020421959633Open ↗
05/11/2020421959633Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00691616-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY9
01/06/2022421959633Open ↗
08/17/2020421959633Open ↗
08/12/2020421959633Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
07/19/2020421959633Open ↗
06/12/2020421959633Open ↗
▸BISSOIL REPORT1
06/12/2020421959633Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE5
01/14/2022421959633Open ↗
01/10/2022421959633Open ↗
01/06/2022421959633Open ↗
Showing 3 of 5 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
01/18/2022421959633Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/18/2022421959633Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/06/2022421959633Open ↗
05/11/2020421959633Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
01/18/2022421959633Open ↗
05/11/2020421959633Open ↗
▸BISEFILING COVER SHEET1
04/23/2020421959633Open ↗
▸Other Documents16
▸DOB NOWPlot Diagram3
08/13/2026Q00691616-P2Open ↗
08/13/2026Q00691616-P1Open ↗
08/13/2026Q00691616-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/24/2026Q00691616-P2Open ↗
08/24/2026Q00691616-P1Open ↗
08/15/2026Q00691616-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026Q00691616-P2Open ↗
08/13/2026Q00691616-P1Open ↗
08/13/2026Q00691616-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00691616-P1Open ↗
08/13/2026Q00691616-P2Open ↗
08/13/2026Q00691616-I1Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
06/05/2020421959633Open ↗
▸BISPLOT DIAGRAM1
06/12/2020421959633Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00691616-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00691616-I1Open ↗