← Back
Factory, industrial, semi-fireproof
40-17 24 STREET
QUEENS · BIN 4004915
💬 Discuss this project
1945Year Built
1Stories
F4Building Class
M1-2/R5BZoning
2,500 sfGross Floor Area
1Units
Factory, industrial, semi-fireproof · Owner of record: POINT GARDE LLC · 2,504 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Permit Issued — active, not yet Signed-off
RoofUnder Construction47p · 1 filing · 20 docs
Floor 3Under Construction46p · 1 filing · 20 docs
Floor 2Under Construction47p · 1 filing · 20 docs
Floor 1Under Construction47p · 1 filing · 20 docs
2 jobs · most recent 08/31/2026
General Wiring
FiledStatusContractorScope
08/31/2026Permit IssuedNASH ELECTRIC SERVICES IN—
08/11/2026Permit IssuedKJK ELECTRIC INCGeneral Wiring
Building Lifecycle
All (62)Filed (6)Permit Issued (11)Inspection (1)Objection (14)Special Inspection (30)
09/03/2026
Permit issued — Protection and Mechanical Methods
Q01312363-Z2-PMM
09/02/2026
Permit issued — Protection and Mechanical Methods
Q01312363-Z1-PMM
09/02/2026
Permit issued — Sidewalk Shed
Q01312363-S9-SH
09/02/2026
Permit issued — Supported Scaffold
Q01453822-I1-SF
08/14/2026
Permit issued — Sprinklers
Q01312363-S4-PL
08/13/2026
Permit issued — Structural
Q01312363-S5-ST
08/10/2026
Permit issued — Mechanical Systems
Q01312363-S2-MS
08/10/2026
Permit issued — Construction Fence
Q01312363-S6-FN
08/05/2026
Permit issued — Plumbing
Q01312363-S4-EW-SP
08/05/2026
Permit issued — General Construction
Q01312363-I1-GC
07/31/2026
Permit issued — Earth Work
Q01312363-S3-FO-EA
02/13/2026
Filed — Alteration CO
Vertical extent exits' 1- sty into 3 sty bldg and convert existing manufacturing into 5 families. Required new certificate of occupancy for 5 families. structural, plumbing/sprinkler and mechanical to be filed under subsequent filings.Q01312363-S2/S3/S4/
Q01312363-S6
02/12/2026
Filed — Alteration CO
Vertical extent exits' 1- sty into 3 sty bldg and convert existing manufacturing into 5 families. Required new certificate of occupancy for 5 families. structural, plumbing/sprinkler and mechanical to be filed under subsequent filings.Q01312363-S2/S3/S4/
Q01312363-S3
02/12/2026
Filed — Alteration CO
Vertical extent exits' 1- sty into 3 sty bldg and convert existing manufacturing into 5 families. Required new certificate of occupancy for 5 families. structural, plumbing/sprinkler and mechanical to be filed under subsequent filings.Q01312363-S2/S3/S4/
Q01312363-S5
02/10/2026
Filed — Alteration CO
Vertical extent exits' 1- sty into 3 sty bldg and convert existing manufacturing into 5 families. Required new certificate of occupancy for 5 families. structural, plumbing/sprinkler and mechanical to be filed under subsequent filings.Q01312363-S2/S3/S4/
Q01312363-S4
02/09/2026
Filed — Alteration CO
Vertical extent exits' 1- sty into 3 sty bldg and convert existing manufacturing into 5 families. Required new certificate of occupancy for 5 families. structural, plumbing/sprinkler and mechanical to be filed under subsequent filings.Q01312363-S2/S3/S4/
Q01312363-S2
02/06/2026
Special inspection requirement — Masonry
ROBERT LIN
02/06/2026
Special inspection requirement — Structural Cold-Formed Steel
ROBERT LIN
02/05/2026
Special inspection requirement — Maintenance information
ROBERT LIN
02/05/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT LIN
02/05/2026
Special inspection requirement — Permanent certificate
ROBERT LIN
02/04/2026
Special inspection requirement — Maintenance information
ROBERT LIN
02/04/2026
Special inspection requirement — Shutoff dampers
ROBERT LIN
02/02/2026
Objection resolved — Addressed
02/02/2026
Objection resolved — Addressed
02/01/2026
Objection raised — Admin
02/01/2026
Objection raised — Cost
01/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT LIN
01/28/2026
Special inspection requirement — Masonry
ROBERT LIN
01/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT LIN
01/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT LIN
01/20/2026
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBERT LIN
12/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT LIN
12/17/2025
Special inspection requirement — Post-installed Anchors
ROBERT LIN
12/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
ROBERT LIN
12/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
ROBERT LIN
12/17/2025
Special inspection requirement — Interior lighting power
ROBERT LIN
12/11/2025
Objection resolved — Addressed
12/11/2025
Objection resolved — Addressed
12/11/2025
Special inspection requirement — Final
ROBERT LIN
12/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBERT LIN
12/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
ROBERT LIN
12/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
ROBERT LIN
12/11/2025
Special inspection requirement — Sprinkler Systems
ROBERT LIN
12/11/2025
Special inspection requirement — Concrete - Cast-In-Place
ROBERT LIN
12/11/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ROBERT LIN
12/11/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
ROBERT LIN
12/11/2025
Special inspection requirement — Final
ROBERT LIN
12/11/2025
Special inspection requirement — Footing and Foundation
ROBERT LIN
12/11/2025
Special inspection requirement — Concrete - Cast-In-Place
ROBERT LIN
12/11/2025
Special inspection requirement — Structural Steel - High Strength Bolting
ROBERT LIN
12/11/2025
Special inspection requirement — Structural Steel - Welding
ROBERT LIN
12/04/2025
Objection raised — Energy
12/04/2025
Objection raised — Structural
12/04/2025
Objection raised — Zoning
12/04/2025
Objection raised — Scope
12/04/2025
Objection raised — Zoning
Latest 60 of 62 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
4017LIC2409/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/22/2025$1.9M—POINT GARDE LLC → 4017LIC LLC$752/sf building
03/30/2015$1.2M—Private party → POINT GARDE LLC$464/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FLUSHING ENGINEERING SERVICE PC702/13/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M2 DESIGN403/21/2026
A & T DESIGN GROUP LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL BOROUGH GROUP SVC INCGeneral Contractor409/07/2026
CS BRIDGE CORPGeneral Contractor409/07/2026
QMB PLUMBING & HTG INCFire Protection108/06/2026
ALL STATE 12 GENERAL CONTRACTINGGeneral Contractor108/01/2026
QMB PLUMBING & HEATING INCPlumbing108/16/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A & T DESIGN GROUP LLC1088502/12/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedCS BRIDGE CORP09/03/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCS BRIDGE CORP09/02/2026
DOB NOWSidewalk ShedPermit IssuedCS BRIDGE CORP09/02/2026
DOB NOWSupported ScaffoldPermit IssuedCS BRIDGE CORP09/02/2026
DOB NOWSprinklersPermit IssuedQMB PLUMBING & HEATING INC08/14/2026
DOB NOWStructuralPermit IssuedALL BOROUGH GROUP SVC INC08/13/2026
DOB NOWMechanical SystemsPermit IssuedALL BOROUGH GROUP SVC INC08/10/2026
DOB NOWConstruction FencePermit IssuedALL BOROUGH GROUP SVC INC08/10/2026
DOB NOWPlumbingPermit IssuedQMB PLUMBING & HTG INC08/05/2026
DOB NOWGeneral ConstructionPermit IssuedALL BOROUGH GROUP SVC INC08/05/2026
DOB NOWEarth WorkPermit IssuedALL STATE 12 GENERAL CONTRACTING07/31/2026
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
02/06/2026MasonryROBERT LINspecial
02/06/2026Structural Cold-Formed SteelROBERT LINspecial
02/05/2026Maintenance informationROBERT LINenergy_progress
02/05/2026Energy Code Compliance InspectionsROBERT LINprogress
02/05/2026Permanent certificateROBERT LINenergy_progress
02/04/2026Maintenance informationROBERT LINenergy_progress
02/04/2026Shutoff dampersROBERT LINenergy_progress
01/28/2026Structural Stability – Alterations of existing buildingsROBERT LINspecial
01/28/2026MasonryROBERT LINspecial
01/28/2026Structural Stability – Alterations of existing buildingsROBERT LINspecial
01/28/2026Structural Stability – Alterations of existing buildingsROBERT LINspecial
12/17/2025HVAC-R and service water piping design and insulationROBERT LINenergy_progress
12/17/2025Fire-Resistant Penetrations and JointsROBERT LINspecial
12/17/2025Post-installed AnchorsROBERT LINspecial
12/17/2025HVAC-R and service water heating equipmentROBERT LINenergy_progress
12/17/2025HVAC-R and service water heating system controlsROBERT LINenergy_progress
12/17/2025Interior lighting powerROBERT LINenergy_progress
12/11/2025FinalROBERT LINprogress
12/11/2025HVAC-R and service water piping design and insulationROBERT LINenergy_progress
12/11/2025HVAC-R and service water heating system controlsROBERT LINenergy_progress
12/11/2025HVAC-R and service water heating equipmentROBERT LINenergy_progress
12/11/2025Sprinkler SystemsROBERT LINspecial
12/11/2025Concrete - Cast-In-PlaceROBERT LINspecial
12/11/2025Excavations - Sheeting, Shoring, and BracingROBERT LINspecial
12/11/2025Subsurface Investigations (Borings/Test Pits)ROBERT LINspecial
Latest 25 of 48.
▾Documents — 110 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/17/2026Q01312363-S2Request digital key ↗
08/17/2026Q01312363-S3Request digital key ↗
08/17/2026Q01312363-S5Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records16
▸DOB NOWRestrictive Declaration/Easement 27
08/13/2026Q01312363-S5Open ↗
08/13/2026Q01312363-I1Open ↗
08/13/2026Q01312363-S7Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWRestrictive Declaration/Easement 17
08/13/2026Q01312363-S2Open ↗
08/13/2026Q01312363-S6Open ↗
08/13/2026Q01312363-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01312363-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01312363-I1Open ↗
▸Seals & Professional Certifications69
▸DOB NOWProgress Inspector Seal & Signature32
09/23/2026Q01312363-P2Open ↗
09/23/2026Q01312363-P2Open ↗
09/23/2026Q01312363-P1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
09/23/2026Q01312363-P2Open ↗
09/23/2026Q01312363-P2Open ↗
09/23/2026Q01312363-P2Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/17/2026Q01312363-I1Open ↗
08/17/2026Q01312363-S2Open ↗
08/17/2026Q01312363-S3Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01312363-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/17/2026Q01312363-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026Q01312363-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/17/2026Q01312363-S4Open ↗
08/17/2026Q01312363-I1Open ↗
08/17/2026Q01312363-S2Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026Q01312363-S3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01312363-S3Open ↗
▸Other Documents6
▸DOB NOWPlot Diagram2
08/13/2026Q01312363-I1Open ↗
08/13/2026Q01312363-S3Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01312363-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01312363-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/17/2026Q01312363-S3Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01312363-I1Open ↗