← Back
City residence, one family
40 2 STREET
BROOKLYN · BIN 3007828
💬 Discuss this project
1901Year Built
2Stories
A4Building Class
R6BZoning
2,115 sfGross Floor Area
1Units
Rent Stabilized8 Open Violations ▸
City residence, one family · 1,800 sf lot · 1.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof7p · 4 filings · 20 docs
Floor 219p · 3 filings · 20 docs
Floor 121p · 3 filings · 20 docs
Cellar19p · 3 filings · 20 docs
Basement23p · 5 filings · 20 docs
1 job · most recent 10/12/2022
General Wiring
FiledStatusContractorScope
10/12/2022CompleteJASON SALOME ELEC'L CONTGGeneral Wiring
Building Lifecycle
All (77)Filed (9)Permit Issued (4)Signed Off (3)Violation (9)Inspection (4)Objection (18)Special Inspection (30)
11/24/2025
Violation issued (HPD, open)
I
12/04/2024
Violation issued (HPD, open)
I
02/09/2024
Signed off — Alteration
Mechanical work indicated on drawings filed herewith for floors cellar, basement, 1,2 floors and roof.
B00742686-I1
02/09/2024
Signed off — Alteration
Structural work indicated on drawing at basement, 1st 2nd and 2nd floors and osp.
B00742706-I1
02/09/2024
Signed off — Alteration
plumbing work at cellar, basement, 1st and 2nd floors indicated on drawings filed herewith
B00739097-I1
11/28/2023
Violation issued (HPD, open)
I
10/17/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/19/2023
Special inspection requirement — Energy Code Compliance Inspections
PIERRE-HENRI HOPPENOT
05/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
alon egozi
05/18/2023
Filed — Alteration
plumbing work at cellar, basement, 1st and 2nd floors indicated on drawings filed herewith
B00739097-P2
04/17/2023
Filed — Alteration
plumbing work at cellar, basement, 1st and 2nd floors indicated on drawings filed herewith
B00739097-P1
04/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
alon egozi
04/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PIERRE-HENRI HOPPENOT
04/14/2023
Special inspection requirement — Energy Code Compliance Inspections
PIERRE-HENRI HOPPENOT
12/28/2022
Special inspection requirement — Structural Steel - Welding
alon egozi
12/28/2022
Special inspection requirement — Structural Steel - Details
alon egozi
12/28/2022
Special inspection requirement — Final
PIERRE-HENRI HOPPENOT
12/28/2022
Special inspection requirement — Concrete - Cast-In-Place
alon egozi
12/28/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
alon egozi
12/14/2022
Filed — Alteration
Structural work indicated on drawing at basement, 1st 2nd and 2nd floors and osp.
B00742706-P1
12/14/2022
Objection resolved — Addressed
12/13/2022
Objection raised — Scope
12/12/2022
Filed — Alteration CO
General Construction for renovation of building and obtain a new certificate of occupancy for change in use from a two family to a one family residence.
B00735995-P1
12/12/2022
Special inspection requirement — Final
PIERRE-HENRI HOPPENOT
12/12/2022
Special inspection requirement — Energy Code Compliance Inspections
PIERRE-HENRI HOPPENOT
12/12/2022
Special inspection requirement — Fenestration areas
PIERRE-HENRI HOPPENOT
12/12/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
PIERRE-HENRI HOPPENOT
12/12/2022
Special inspection requirement — Interior lighting power
PIERRE-HENRI HOPPENOT
12/12/2022
Special inspection requirement — Metering
PIERRE-HENRI HOPPENOT
12/12/2022
Special inspection requirement — Air barrier - visual inspection
PIERRE-HENRI HOPPENOT
12/12/2022
Special inspection requirement — Fenestration air leakage
PIERRE-HENRI HOPPENOT
12/12/2022
Special inspection requirement — Concrete - Cast-In-Place
alon egozi
12/12/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
alon egozi
12/12/2022
Special inspection requirement — Structural Steel - Details
alon egozi
12/12/2022
Special inspection requirement — Structural Steel - Welding
alon egozi
11/30/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/30/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/17/2022
Violation issued (HPD, open)
I
09/29/2022
Permit issued — Plumbing
B00739097-I1-PL
08/25/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/18/2022
Permit issued — General Construction
B00735995-I1-GC
08/18/2022
Permit issued — Structural
B00742706-I1-ST
08/18/2022
Permit issued — Mechanical Systems
B00742686-I1-MS
07/11/2022
Objection raised — Zoning
07/11/2022
Objection resolved — Addressed
06/22/2022
Objection resolved — Addressed
06/22/2022
Objection resolved — Addressed
06/22/2022
Objection resolved — Addressed
06/22/2022
Objection resolved — Addressed
06/21/2022
Objection raised — Structural
06/21/2022
Objection resolved — Addressed
06/21/2022
Objection raised — Admin
06/21/2022
Objection resolved — Addressed
06/21/2022
Objection raised — Admin
06/21/2022
Objection resolved — Addressed
06/17/2022
Objection raised — Fire_Protection
06/17/2022
Objection raised — Zoning
06/15/2022
Filed — Alteration
Mechanical work indicated on drawings filed herewith for floors cellar, basement, 1,2 floors and roof.
B00742686-I1
06/13/2022
Filed — Alteration
plumbing work at cellar, basement, 1st and 2nd floors indicated on drawings filed herewith
B00739097-I1
06/13/2022
Objection raised — Other
Latest 60 of 77 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STUDIO PHH ARCHITECTS1307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/08/2018$2.4M—Private party → Private party$1,149/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANZ CONSULTING ENGINEERING, PLLC405/18/2023
KSI PROFESSIONAL ENGINEERS212/14/2022
STUDIO PHH ARCHITECTS312/12/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MICHAEL ZENREICH ARCHITECT203/21/2026
JUST ARCHITECTURE803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A PLUS PLUMBING CORPPlumbing807/08/2026
MACALUSO GENERAL CONT CORGeneral Contractor507/08/2026
A PLUS PLUMBINGGeneral Contractor203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASE ENGINEERING PLLC5785605/18/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA PLUS PLUMBING CORP09/29/2022
DOB NOWGeneral ConstructionPermit IssuedMACALUSO GENERAL CONT COR08/18/2022
DOB NOWStructuralSigned-offMACALUSO GENERAL CONT COR08/18/2022
DOB NOWMechanical SystemsSigned-offMACALUSO GENERAL CONT COR08/18/2022
BISPLISSUEDGRAFES ENDE, INC. ADCO PLUMBING04/26/2000
BIS—ISSUEDEVERLAST CUSTOM CONSTRUCTION06/28/1999
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/17/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/30/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/19/2023Energy Code Compliance InspectionsPIERRE-HENRI HOPPENOTprogress
05/19/2023Fire-Resistant Penetrations and Jointsalon egozispecial
04/14/2023Fire-Resistant Penetrations and Jointsalon egozispecial
04/14/2023HVAC-R and service water piping design and insulationPIERRE-HENRI HOPPENOTenergy_progress
04/14/2023Energy Code Compliance InspectionsPIERRE-HENRI HOPPENOTprogress
12/28/2022Structural Steel - Weldingalon egozispecial
12/28/2022Structural Steel - Detailsalon egozispecial
12/28/2022FinalPIERRE-HENRI HOPPENOTprogress
12/28/2022Concrete - Cast-In-Placealon egozispecial
12/28/2022Structural Stability – Alterations of existing buildingsalon egozispecial
12/12/2022FinalPIERRE-HENRI HOPPENOTprogress
12/12/2022Energy Code Compliance InspectionsPIERRE-HENRI HOPPENOTprogress
12/12/2022Fenestration areasPIERRE-HENRI HOPPENOTenergy_progress
12/12/2022Fenestration and door U-factor and product ratingsPIERRE-HENRI HOPPENOTenergy_progress
12/12/2022Interior lighting powerPIERRE-HENRI HOPPENOTenergy_progress
12/12/2022MeteringPIERRE-HENRI HOPPENOTenergy_progress
12/12/2022Air barrier - visual inspectionPIERRE-HENRI HOPPENOTenergy_progress
12/12/2022Fenestration air leakagePIERRE-HENRI HOPPENOTenergy_progress
12/12/2022Concrete - Cast-In-Placealon egozispecial
12/12/2022Structural Stability – Alterations of existing buildingsalon egozispecial
12/12/2022Structural Steel - Detailsalon egozispecial
12/12/2022Structural Steel - Weldingalon egozispecial
05/26/2022Duct leakage testing, insulation and designPIERRE-HENRI HOPPENOTenergy_progress
05/26/2022HVAC-R and service water heating equipmentPIERRE-HENRI HOPPENOTenergy_progress
05/26/2022Energy Code Compliance InspectionsPIERRE-HENRI HOPPENOTprogress
Latest 25 of 31.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/01/2026B00489239-I1Request digital key ↗
08/29/2026B00742706-P1Request digital key ↗
08/29/2026B00739097-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00489239-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026B00489239-I1Open ↗
08/29/2026B00739097-P2Open ↗
08/29/2026B00739097-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026B00735995-P1Open ↗
09/02/2026B00735995-P1Open ↗
08/27/2026B00742706-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/27/2026B00742706-I1Open ↗
08/27/2026B00742686-I1Open ↗
08/26/2026B00739097-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
09/01/2026B00489239-I1Open ↗
08/13/2026B00735995-P1Open ↗
08/13/2026B00735995-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00735995-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00735995-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00735995-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/29/2026B00739097-I1Open ↗
08/29/2026B00739097-P1Open ↗
08/29/2026B00739097-P2Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026B00735995-I1Open ↗
08/13/2026B00742686-I1Open ↗
08/13/2026B00739097-I1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification2
08/13/2026B00735995-P1Open ↗
08/13/2026B00735995-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00735995-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00489239-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B00489239-I1Open ↗